Skip to main content

Agricultural Services Program of the Province of Misiones

The overall objective of the CCLIP is to improve agricultural productivity and rural household incomes in Argentina in an inclusive and climate-resilient manner. Its specific objectives include: (i) reducing agricultural production logistics costs in the intervention areas; (ii) increasing the adoption of sustainable agricultural technologies and practices and strengthening the productive, financial, and commercial inclusion of small-scale producers; and (iii) enhancing the management and response capacity of production systems and rural households in the face of climate risks. The overall development objective of the second operation under the CCLIP is to contribute to increasing agricultural productivity and rural incomes in the Province of Misiones (PdM). The specific development objectives are: (i) increasing access to electricity and improving the quality of the electricity supply in rural areas; and (ii) improving traffic conditions on Provincial Route 205 (RP205) to facilitate access to Fachinal and its rural areas.

Project Detail

Country

Argentina

Project Number

AR-L1438

Approval Date

-

Project Status

Preparation

Project Type

Loan Operation

Sector

AGRICULTURE AND RURAL DEVELOPMENT

Subsector

AGRICULTURE AND RURAL DEVELOPMENT

Lending Instrument

Investment Loan

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental and Social Impact Category (ESIC)

Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

-

Country Counterpart Financing

-

Original Amount Approved

USD 40,000,000.00

Can’t find a document? Request information

Preparation Phase
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-58
Socio-Cultural Analysis - Preparation
ANALISIS SOCIOCULTURAL (04082026).pdf
Aug. 05, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-53
Public Consultation Report - Preparation
ANEXO CLPI y CPI Electrificacion Rural.pdf
Aug. 04, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-52
Environmental and Social Assessment - Preparation
EIAS Electrificacion Misiones 5.05.2026 ajustada vlimpia 19.05.2026 1b.pdf
Aug. 04, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-51
Disaster Risk Assessment - Preparation
ARD_Electrificacion Misiones_AR-L1438 1 RDD.pdf
Aug. 04, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-50
Public Consultation Report - Preparation
PRESENTACION REUNION DE CONSULTA PUBLICA RP205-ACC FACHINAL.pdf
Aug. 04, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-48
Public Consultation Report - Preparation
Notas cierre PPPI.pdf
Aug. 04, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-47
Public Consultation Report - Preparation
Anexo Invitaciones.pdf
Aug. 04, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-45
Disaster Risk Management Plan - Preparation
Plan de Gestion de Riesgos de Desastres RP 205_VF.pdf
Aug. 04, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-44
Environmental and Social Management Plan - Preparation
Plan de Genero y Diversidad RP 205_VF.pdf
Aug. 04, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-43
Environmental and Social Management Plan - Preparation
Plan de Accion Climatica RP 205_VF.pdf
Aug. 04, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-42
Environmental and Social Management Plan - Preparation
Lineamientos PAB RP 205_VF.pdf
Aug. 04, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-41
Public Consultation Report - Preparation
Informe de Implementacion del Plan de Participacion de Partes Interesadas RP 205_VF.pdf
Aug. 04, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-40
Disaster Risk Assessment - Preparation
Estudio de riesgos de desastres RP 205_VF.pdf
Aug. 04, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-39
Environmental and Social Impact Assessment - Preparation
ESIAS RP 205 VF_CA.pdf
Aug. 04, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-33
Environmental and Social Execution
ASC con Anexos Final 19-05-26 (1).pdf
May. 19, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-32
Environmental and Social Execution
Apendice XIII Modelo Contrato de comodato.pdf
May. 19, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-31
Environmental and Social Execution
Apendice XII Modelo Convenio SAE gratuita- Comunidad.pdf
May. 19, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-30
Environmental and Social Execution
APENDICE IX Modelo Codigo de conducta contratistas.pdf
May. 19, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-29
Environmental and Social Execution
APENDICE VIII Guia para una comunicacion con perspectiva de genero.pdf
May. 19, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-28
Environmental and Social Execution
APENDICE VI REGISTRO DE COMUNIDADES.pdf
May. 19, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-27
Environmental and Social Execution
Anexos EIAyS.pdf
May. 19, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-26
Environmental and Social Execution
EIAS Electrificacion Misiones 5.05.2026 ajustada vlimpia 19.05.2026.pdf
May. 19, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-25
Environmental and Social Execution
PPPI ENERGIA DE MISIONES - ELECTRIFICACION RURAL (sin nombres).pdf
May. 19, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-24
Environmental and Social Execution
Plan de Accion Climatica RP 205_VP_BID.pdf
May. 19, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-23
Environmental and Social Execution
Plan de Participacion de Partes Interesadas (PPPI) RP 205_VP_BID.pdf
May. 19, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-22
Environmental and Social Execution
Plan de Gestion de Riesgos de Desastres RP 205_BID.pdf
May. 19, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-21
Environmental and Social Execution
Plan de Genero y Diversidad RP 205_VP_BID.pdf
May. 19, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-20
Environmental and Social Execution
Lineamientos PAB RP 205_VP_BID.pdf
May. 19, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-19
Environmental and Social Execution
Estudio de riesgos de desastres RP 205_VP_BID.pdf
May. 19, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-1153855294-18
Environmental and Social Execution
ESIAS RP 205 VP_BID.pdf
May. 19, 2026
English
https://www.iadb.org/document.cfm?id=EZIDB000741-820797916-15
Project Profile
PP - Programa de Servicios Agropecuarios de la Provincia de Misiones - AR-L1438.pdf
May. 06, 2026
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top