The project's specific objective is to improve the quality of public transportation through the renovation and electrification of the passenger rail service of the General San Martín Railroad (FCSM) in the section between the Retiro and Pilar stations, which will reduce travel times, improve the reliability of service, and decrease greenhouse gas emissions.
Project Detail
Country
Argentina
Project Number
AR-L1267
Approval Date
August 24, 2017
Project Status
Closed
Project Type
Loan Operation
Sector
TRANSPORT
Subsector
RAILWAYS
Lending Instrument
Investment Loan
Lending Instrument Code
INV
Modality
ESP (Specific Investment Operation)
Facility Type
-
Environmental and Social Impact Category (ESIC)
Category B: Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available
Total Cost
USD 522,000,000.00
Country Counterpart Financing
USD 122,000,000.00
Original Amount Approved
USD 400,000,000.00
| Operation Number | Lending Type | Reporting Currency | Reporting Date | Signed Date | Fund | Financial Instrument | 
|---|---|---|---|---|---|---|
| 4265/OC-AR | Sovereign Guaranteed | USD - United States Dollar | Ordinary Capital | Flexible Financing Facility | 
- Lending Type: Sovereign Guaranteed
- Reporting Currency: USD - United States Dollar
- Reporting Date:
- Signed Date:
- Fund: Ordinary Capital
- Financial Instrument: Flexible Financing Facility
Can’t find a document? Request information
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-45342
        Project Monitoring Report ( Public version)
    AR-L1267 First period Jan-Jun 2024 - Public Report.PDF
      Feb. 06, 2025
      English
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-44661
        Project Monitoring Report ( Public version)
    AR-L1267 Second period Jan-Dec 2023 - Public Report.PDF
      Jun. 28, 2024
      English
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-44516
        Project Monitoring Report ( Public version)
    AR-L1267 First period Jan-Jun 2023 - Public Report.PDF
      Jan. 25, 2024
      English
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-43364
        Project Monitoring Report ( Public version)
    AR-L1267 Second period Jan-Dec 2022 - Public Report.PDF
      Jul. 24, 2023
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-34822
        Specific Procurement Notices
    AR-L1267_P1136073_SP.pdf
      Feb. 14, 2023
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-42104
        Project Monitoring Report ( Public version)
    AR-L1267 First period Jan-Jun 2022 - Public Report.PDF
      Feb. 09, 2023
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-34333
        Specific Procurement Notices
    AR-L1267_P1091976_SP.pdf
      Oct. 26, 2022
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-40838
        Project Monitoring Report ( Public version)
    AR-L1267 Second period Jan-Dec 2021 - Public Report.PDF
      Aug. 11, 2022
      English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35246
        Project Monitoring Report ( Public version)
    AR-L1267 First period Jan-Jun 2021 - Public Report.pdf
      Feb. 16, 2022
      English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34604
        Project Monitoring Report ( Public version)
    AR-L1267 Second period Jan-Dec 2020 - Public Report.pdf
      Jul. 20, 2021
      English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33951
        Project Monitoring Report ( Public version)
    AR-L1267 First period Jan-Jun 2020 - Public Report.pdf
      Mar. 08, 2021
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26740
        Specific Procurement Notices
    AR-L1267_8711_SP.pdf
      Jan. 15, 2021
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33302
        Project Monitoring Report ( Public version)
    AR-L1267 Second period Jan-Dec 2019-Public Report.pdf
      Aug. 24, 2020
      English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31989
        Project Monitoring Report ( Public version)
    AR-L1267 Second period Jan-Dec 2018-Public Report.pdf
      Oct. 15, 2019
      English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32670
        Project Monitoring Report ( Public version)
    AR-L1267 First period Jan-Jun 2019-Public Report.pdf
      Feb. 12, 2020
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1703464048-94
        Loan Proposal
    Argentina. Proposal for an individual loan for the General San Martin Railroad Improvement Project Retiro-Pilar Branch Line.pdf
      Aug. 03, 2017
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1703464048-95
        Loan Proposal
    Argentina. Propuesta de préstamo individual para el Proyecto de Mejora del Ferrocarril General San Martín Ramal Retiro-Pilar.pdf
      Aug. 03, 2017
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1983553961-4408
        Loan Contract
    Proyecto de Mejora del Ferrocarril General San Martin.pdf
      Sep. 08, 2017
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1983553961-4409
        Loan Contract
    General San Martín Railroad Improvement Project. Retiro-Pilar Branch Line.pdf
      Sep. 13, 2018
      English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-4920
        Loan Contract
    Contrato - Proyecto de Mejora del Ferrocarril General San Martín  - Ramal Retiro-Pilar.pdf
      Feb. 28, 2018
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1498
        Project Monitoring Report ( Public version)
    AR-L1267 Second period Jan-Dec 2017-Public Report.pdf
      Aug. 01, 2018
      English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31044
        Project Monitoring Report ( Public version)
    AR-L1267 First period Jan-Jun 2018-Public Report.pdf
      Dec. 14, 2018
      English
https://www.iadb.org/document.cfm?id=EZIDB0000029-248186693-11288
        Environmental and Social Execution
    EIAS Electrificacion VF_Tomo III_pag 481 a 1297.pdf
      Mar. 16, 2023
      Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000029-248186693-11287
        Environmental and Social Execution
    EIAS Electrificacion VF_Tomo II_pag 293 a 480.pdf
      Mar. 16, 2023
      English
https://www.iadb.org/document.cfm?id=EZIDB0000029-248186693-11286
        Environmental and Social Execution
    EIAS Electrificacion VF_Tomo I_pag 1 a 292.pdf
      Mar. 16, 2023
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-565167379-42197
        Environmental Impact Assessments
    EER3__Informe_de_Gestion_Ambiental_y_Social_(IGAS)_docx-L-MELANIEK.docx
      Mar. 30, 2021
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-565167379-13115
        Environmental and Social Management Plan
    EER3__Informe_de_Gestion_Ambiental_y_Social_(IGAS)_docx.docx
      Mar. 29, 2021
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1703464048-24
        Environmental Impact Assessments
    Análisis Ambiental y Social_Ferrocarril General San Martín. Ramal_Retiro-Pilar (AR-L1267).pdf
      May. 11, 2017
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1703464048-18
        Technical Note
    EER3. Informe de Gestion Ambiental y Social (IGAS).docx
      Aug. 04, 2017
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1703464048-90
        
    Análisis Ambiental y Social_FFCCGSM_VERSION FINAL.pdf
      Jul. 18, 2017
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1703464048-19
        Technical Note
    EER4. Plan de Adquisiciones (PA).xlsx
      Aug. 07, 2017
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1703464048-91
        
    Analisis Social y Ambiental Estrategico del Proyecto (ASAE)_Versión Final_Anexo I- II y III.pdf
      Jul. 18, 2017
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1703464048-93
        Technical Note
    EER1. Plan de Ejecucion Plurianual (PEP) y Plan Operativo Anual (POA).xlsx
      Aug. 04, 2017
      Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1703464048-25
        Technical Note
    EEO5_Análisis socioeconómico de los usuarios del FFCC San Martín.docx
      Aug. 04, 2017
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1703464048-12
        Technical Note
    EEO1. Analisis Social y Ambiental Estrategico del Proyecto (ASAE).pdf
      Aug. 04, 2017
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1703464048-13
        Technical Note
    EEO2. Estudio de Demanda y Evaluacion Economica_FCSM.pdf
      Aug. 07, 2017
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1703464048-14
        Technical Note
    EEO3. Analisis institucional y operativo de los FFCC metropolitanos de BA.doc
      Aug. 04, 2017
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1703464048-15
        Technical Note
    EEO4. Anexo cambio climatico.docx
      Aug. 04, 2017
      English
https://www.iadb.org/document.cfm?id=EZSHARE-1703464048-32
        Technical Note
    EER2. Plan de Monitoreo y Evaluación.docx
      Aug. 07, 2017
      Spanish