Norte Grande Electricity Transmission Program
The main objective of the Project is to guarantee the coverage of the increasing power demand and the security of the Argentinean Interconnection System (SADI), with the object of contributing to the continuous development of the productive sectors and elevating the standard of life of the population, by rationally making use of the available generation resources of the country. The specific objectives are: i) to interconnect the electrical systems of the Northeast and Northwest Argentinean regions (NOA – NEA) by using a line of extra high tension (LEAT 500kV and associated Transformation Stations) so it can permit and promote the energy exchange between both regions, improving the prices and increasing the quality and security of the electrical provision, in particular for the macro region of Norte Grande; and ii) to consolidate and expand the regional communication nets (high and med tension lines smaller than 500kV with its respective associated transformation stations), laying the foundations for the productive and social development through giving solution to the problems that attempt against the security and reliability of these systems.

Project Detail

Country

Argentina

Project Number

AR-L1021

Approval Date

August 2, 2006

Project Status

Closed

Project Type

Loan Operation

Sector

ENERGY

Subsector

NEW POWER DISTRIBUTION & TRANSMISSION PROJECTS

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

GOM (Global of Multiple Works Operation)

Facility Type

-

Environmental Classification

(R) Likely to cause significant negative impacts, or have profound implications affecting natural resources

Total Cost

USD 725,000,000.00

Country Counterpart Financing

USD 145,000,000.00

Original Amount Approved

USD 580,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
1764/OC-AR Sovereign Guaranteed USD - United States Dollar Ordinary Capital Single Currency Facility
Operation Number 1764/OC-AR
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Single Currency Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-8627
Loan Contract
Contrato modificatorio por cambio de organismos ejecutores.pdf
Jun. 09, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-84867743-7
Project Monitoring Report ( Public version)
AR-L1021 First period Jan-Jun 2016-Public Report [40797168].PDF
Dec. 23, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-84867743-6
Project Monitoring Report ( Public version)
AR-L1021 Second period Jan-Dec 2015-Public Report [40360662].PDF
Jun. 23, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-84867743-5
Project Monitoring Report ( Public version)
AR-L1021 First period Jan-Jun 2015-Public Report [40181575].PDF
Mar. 15, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-84867743-4
Project Monitoring Report ( Public version)
AR-L1021 Second period Jan-Dec 2014-Public Report [40178480].PDF
Mar. 14, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-84867743-3
Project Monitoring Report ( Public version)
AR-L1021 First period Jan-Jun 2014-Public Report [40175896].PDF
Mar. 11, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-84867743-2
Project Monitoring Report ( Public version)
AR-L1021 Second period Jan-Dec 2013-Public Report [40172680].PDF
Mar. 10, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-45
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_AR-L1021-2013-1º-Período [38265098].PDF
Mar. 06, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-46
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_AR-L1021-2013-1º-Período [38265758].PDF
Mar. 06, 2014
French
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-47
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_AR-L1021-2013-1º-Periodo [38266418].PDF
Mar. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-48
Project Monitoring Report ( Public version)
Report for Publication_PMR-_AR-L1021-2013-1º-Period [38267082].PDF
Mar. 06, 2014
English
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-44
Procurement Plan
Plan de Adquisiciones [37965024].PDF
Aug. 29, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-43
Project Monitoring Report ( Public version)
Report for Publication_PMR-_AR-L1021-2012-2º-Period [37874931].PDF
Jul. 27, 2013
English
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-40
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_AR-L1021-2012-2º-Período [37872881].PDF
Jul. 27, 2013
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-41
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_AR-L1021-2012-2º-Período [37873546].PDF
Jul. 27, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-42
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_AR-L1021-2012-2º-Periodo [37874203].PDF
Jul. 27, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-36
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_AR-L1021-2012-1º-Período [37351785].PDF
Dec. 19, 2012
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-37
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_AR-L1021-2012-1º-Período [37352429].PDF
Dec. 19, 2012
French
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-38
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_AR-L1021-2012-1º-Periodo [37353104].PDF
Jan. 21, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-39
Project Monitoring Report ( Public version)
Report for Publication_PMR-_AR-L1021-2012-1º-Period [37353760].PDF
Jan. 21, 2013
English
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-32
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_AR-L1021-2011-2º-Período [36899865].PDF
Nov. 28, 2012
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-33
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_AR-L1021-2011-2º-Período [36921150].PDF
Nov. 28, 2012
French
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-34
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_AR-L1021-2011-2º-Periodo [36923701].PDF
Nov. 28, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-35
Project Monitoring Report ( Public version)
Report for Publication_PMR-_AR-L1021-2011-2º-Period [36926313].PDF
Nov. 28, 2012
English
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-2491
Specific Procurement Notices
AR-L1021 [36644915].PDF
Jan. 24, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-28
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_AR-L1021-2011-1º-Período [36623593].PDF
Jan. 12, 2012
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-29
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_AR-L1021-2011-1º-Período [36624267].PDF
Jan. 12, 2012
French
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-30
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_AR-L1021-2011-1º-Periodo [36624847].PDF
Jan. 12, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-31
Project Monitoring Report ( Public version)
Report for Publication_PMR-_AR-L1021-2011-1º-Period [36625414].PDF
Jan. 12, 2012
English
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-24
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_AR-L1021-2010-2º-Período [36309952].PDF
Aug. 10, 2011
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-25
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_AR-L1021-2010-2º-Período [36311834].PDF
Aug. 10, 2011
French
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-26
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_AR-L1021-2010-2º-Periodo [36312419].PDF
Aug. 10, 2011
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-27
Project Monitoring Report ( Public version)
Report for Publication_PMR-_AR-L1021-2010-2º-Period [36312995].PDF
Aug. 10, 2011
English
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-22
Specific Procurement Notices
COMPONENTE II_ OBRAS DE TRANSMISIÓN Y SUBTRANSMISIÓN PROVINCIALES Power [35435400].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-23
Specific Procurement Notices
COMPONENTE II_ OBRAS DE TRANSMISIÓN Y SUBTRANSMISIÓN PROVINCIALES - PROVINCIA DE MISIONES Power [35435447].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-20
Procurement Plan
PA 2010 Programa de Transmisión Electrica + Adicional al Programa de Transmisión Electrica [4255646].PDF
Jan. 01, 1900
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-21
Procurement Plan
PA 2010 Programa de Transmisión Electrica + Adicional al Programa de Transmisión Electrica [35255497].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-18
Procurement Plan
Plan de Adquisiciones 2009 Programa de Transimisión Eleéctrica del norte Grande [1920287].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-19
Procurement Plan
Plan de Adquisiciones 2009 Programa de Transimisión Eleéctrica del norte Grande [4210408].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-3244
Loan Contract
Programa de Transmisión Eléctrica del Norte Grande [39916650].PDF
Dec. 31, 1899
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-17
Procurement Plan
Plan de Adquisiciones - Programa Transmisión Eléctrica Norte Grande [751472].DOC
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-744
Project Monitoring Report ( Public version)
AR-L1021 First period Jan-Jun 2017-Public Report.pdf
Feb. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-86
Project Monitoring Report ( Public version)
AR-L1021 Second period Jan-Dec 2016-Public Report.pdf
Feb. 14, 2018
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-16
Environmental Impact Assessments
EIA NEA-NOA - Final con Plan de Gestión Ambiental [699364].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-13
Environmental Impact Assessments
Anexo II Mapas EIA NEA-NOA (2 de 3) [675355].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-14
Environmental Impact Assessments
Anexo I Mapas EIA NEA-NOA (1 de 3) [675360].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-15
Environmental Impact Assessments
Anexo III Mapas EIA NEA-NOA (3 de 3) [675366].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-12
Environmental Impact Assessments
EIA Interconexión NEA-NOA [636728].PDF
Nov. 28, 2005
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-404053128-11
Project Outline
Project Outline [561034].PDF
Dec. 31, 1999
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint