Skip to main content
Improvement of Infraestructure Projects Small Contries CID
This operation seeks, through consulting services of an international agency, to identify and diagnose the specific factors in terms of design and execution, which may be affecting the performance of the portfolio of infrastructure projects in small countries of CID and formulating th recommendation to overcome obstacles encountered.

Project Detail

Country

Regional

Project Number

RG-T2396

Approval Date

December 11, 2013

Project Status

Closed

Project Type

Technical Cooperation

Sector

TRANSPORT

Subsector

TRANSPORT

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

Likely to cause minimal or no negative environmental and associated social impacts

Total Cost

USD 312,500.00

Country Counterpart Financing

USD 62,500.00

Original Amount Approved

USD 250,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-14206-RG Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-14206-RG
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-1523614197-12
Informe final consolidado versión borrador UNOPS [40146524].docx
Published Nov. 22, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-596
Carta Convenio - Mejoramiento de Proyectos de Infraestructura en Países Pequeños CID (El Salvador) [39476203].PDF
Published Mar. 11, 2015
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-597
Carta Convenio - Mejoramiento de Proyectos de Infraestructura en Países Pequeños CID (Honduras) [39476240].PDF
Published Mar. 11, 2015
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-598
Carta Convenio - Mejoramiento de Proyectos de Infraestructura en Países Pequeños CID (Guatemala) [39476254].PDF
Published Mar. 11, 2015
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-599
Carta Convenio - Mejoramiento de Proyectos de Infraestructura en Países Pequeños CID (Nicaragua) [39476285].PDF
Published Mar. 11, 2015
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-600
Carta Convenio - Mejoramiento de Proyectos de Infraestructura en Países Pequeños CID (Panamá) [39476310].PDF
Published Mar. 11, 2015
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-593
Carta Convenio - Mejoramiento de Proyectos de Infraestructura en Países Pequeños CID (República Dominicana) [39441134].PDF
Published Mar. 10, 2015
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-594
Carta Convenio - Mejoramiento de Proyectos de Infraestructura en Países Pequeños CID (Costa Rica) [39472701].PDF
Published Mar. 11, 2015
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-595
Carta Convenio - Mejoramiento de Proyectos de Infraestructura en Países Pequeños CID (Belice) [39476141].PDF
Published Mar. 11, 2015
Download
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1523614197-11
RG-T2396 Mejoramiento de Proyectos de Infraestructura en Países Pequeños CID [38044072].PDF
Published Jul. 31, 2014
Download

Have an Environmental or Social issue related to IDB projects? File a Complaint

Publications
Published 2024
The Role of Agents and the Nature of Limitations in the Performance of Development Projects
Development practitioners aspire to improve lives, but achieving results is challenging. What prevents operations from achieving their objectives? Answering this question is critical to promote success. This Discussion Paper proposes to analyze operations first to identify if they faced limitations to effectiveness, then to identify which key stakeholders faced those limitations, and finally, whether such limitations were exogenous. Such an approach may strengthen accountability and learning. An analysis of 62 project completion reports evaluated in 2022 by the Inter-American Development Bank shows that success was contingent upon critical agents performance and the influence of exogenous factors. Four in 10 operations that failed had agents other than the executing agency face challenges. The same share of operations had agents face limitations derived from the project environment or third-party inputs beyond their control. Despite limitations, the proposed framework may provide insights for future work that promotes effectiveness.
Publications
Published 2023
Independent Country Program Review (ICPR) Implementation Guidelines
These Guidelines seek to provide greater clarity on how OVE will conduct Independent Country Program Reviews (ICPRs), a periodic product introduced through the approval of OVE's Country Product Protocol by the Boards. The purpose of this document is to provide transparency to the Boards, country authorities, and IDB and IDB Invest Management on the methods, tools and processes used by OVE in the ICPRs, and to foster consistency in their preparation. The Guidelines are the exclusive responsibility of OVE, in compliance with the Boards' mandate of conducting ICPRs under the conditions and principles approved in the Protocol. It is expected that the systematization introduced by the Guidelines will also contribute to internal and external training activities, and to extracting common lessons across countries.
Blogs
Published 2022
Día de las Operaciones: lo que aprendimos de Barbados
¿Qué son los Días de las Operaciones del BID? Los Días de las Operaciones son una parte integral de Academia BID, la plataforma de conocimiento y aprendizaje del Grupo BID. El principal objetivo de estas jornadas es crear un espacio de colaboración y diálogo constructivo entre las Unidades Ejecutoras de Proyectos (UEP) dentro de un
Publications
Published 2022
Inter-American Development Bank Quarterly Business Review: First Quarter 2022
The 2022 first quarter edition of the Quarterly Business Review (QBR) provides management with a status of the Bank's performance. The QBR reports on outputs, lending program priorities and organizational indicators on a quarterly basis to allow management to monitor progress in achieving corporate results. This periodic monitoring supports evidence-based decision making and allows for timely identification of deviations from targets and enables effective implementation of measures to address them. The Quarterly Business Review (QBR) provides an overview of the IDB's performance on sovereign-guaranteed outputs and lending program priorities. The QBR identifies trend deviations from IDB portfolio targets to support Bank management efforts to identify and implement corrective measures. This edition compiles data for the first quarter of 2022.
Blogs
Published 2023
Understanding Income Disparities: The Role of Firm-Embedded Productivity
Productivity has long been recognized as a key determinant of global income disparities between countries. Recent studies suggest that around half of the differences in income per capita can be attributed to productivity variations. However, the question arises: what factors contribute to aggregate productivity? One prevailing view suggests that aggregate productivity is influenced by firm-embedded
Publications
Published 2021
Independent Country Program Review Suriname 2016-2020
This Independent Country Program Review (ICPR) analyzes the IDB Group's country strategy (CS) and country program with Suriname during the 2016-2020 period. ICPRs assess the relevance of the Bank's CS and provide aggregate information on the program alignment and execution. If the available information allows it, ICPRs also report on progress toward achieving the objectives that the IDB Group established by the CS. This review by the Office of Evaluation and Oversight (OVE) is intended to provide the Boards of Executive Directors of the IDB and IDB Invest with useful information to analyze the country strategies submitted for their consideration.
Blogs
Published 2024
Por qué es importante evaluar riesgos contextuales: De qué forma la comprensión del contexto contribuye a la eficacia de las operaciones
En el ámbito de las intervenciones de desarrollo, donde los esfuerzos apuntan a abordar desafíos multifacéticos como el alivio de la pobreza y el desarrollo de infraestructura, el Banco Interamericano de Desarrollo (BID) desempeña un papel fundamental.Recientemente, el BID actualizó su Marco de Política Ambiental y Social, enfatizando la importancia de fomentar sociedades inclusivas y prósperas en América Latina y el Caribe (ALC), destacando la intrincada conexión entre el desarrollo económico y la sostenibilidad ambiental y social.
Publications
Published 2021
Electrokit: Power Utility Toolkit-The Overview: Best Practices in Electric Power Distribution Companies in the Latin America and Caribbean Region
The Electrokit is an initiative created by the IDB to strengthen transformation and continuous improvement of electric utilities in the LAC region. It follows international standards that characterize and evaluate utilities based on indicators and best practices. The Electrokit is organized in 16 activities that are common to most electricity utilities. The aim of the toolkit is to provide power utilities, policy and decision-makers access to best practices, current trends, and expertise to: (i) identify challenges, develop a strategy and action plan for addressing them; and (ii) support utilities to be more sustainable, efficient, improve customer experience and accelerate innovation to stay ahead of the rapidly sector transformation. The Overview presents the main objectives of the toolkit, the structure of its areas and activities, and a guide on how companies could design an action plan.
Blogs
Published 2023
Despegan nuevas oportunidades en aeropuertos de Bolivia
Cuando estamos por tomar un avión, hay muchos pensamientos que invaden nuestras mentes, desde la alegría del viaje y destino por delante hasta el temor de cualquier accidente que nos hace rezar al despegar. Sin embargo, pocos solemos pensar en cómo se coordinan los aterrizajes y despegues, y en la tecnología necesaria para cumplir esta
Publications
Published 2021
General Recommendations to Minimize the Risk of COVID-19 Transmission in Tourist Establishments and Spaces
A série de documentos inclui recomendaçoes gerais para minimizar o risco de transmisso da COVID-19 no setor de turismo, assim como recomendaçoes específicas relacionadas a subsetores e pontos específicos (meios de hospedagem, restaurantes, transporte local, praias, portos e aeroportos). Também inclui recomendaçoes para gerenciar protocolos de prevenço, além de ferramentas especificas para minimizar a transmisso. A série é resultado de um diagnóstico que analisou a adequaçao dos protocolos vigentes no setor de turismo para minimizar a transmissao da COVID-19, identificando para tal os principais pontos de risco ao longo do processo de prestaço do serviço turístico. A série inclui 10 documentos: Guia de Leitura, R01 Recomendaçoes Gerais, R02.1-R02.5 Recomendaçoes Específicas para Estabelecimentos e Pontos Turísticos (meios de hospedagem, restaurantes, transporte local, praias, aeroportos e portos), R03 Recomendaçoes para a Gesto de Protocolos de Prevenço, e E02.1-E02.2 Ferramentas Específicas para Minimizar a Transmisso.
Powered by FindIT
Jump back to top