Skip to main content
Analysis, evaluation and recommendations to promote and develop interconnection
Set through this cooperation, the foundations of dialogue through a roadmap with concrete objectives and actions that involve both the design of the required infrastructure, such as planning studies and regulatory harmonization.

Project Detail

Country

Regional

Project Number

RG-T2352

Approval Date

December 6, 2013

Project Status

Closed

Project Type

Technical Cooperation

Sector

ENERGY

Subsector

ENERGY INTEGRATION

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

Likely to cause minimal or no negative environmental and associated social impacts

Total Cost

USD 480,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 480,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/MR-14190-RG Sovereign Guaranteed USD - United States Dollar Regional Infrastructure Integration Mult Nonreimbursable
Operation Number ATN/MR-14190-RG
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Regional Infrastructure Integration Mult
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1806629576-13
Approved TC document
TC Document [38834523].PDF
Jun. 03, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1806629576-11
Approved TC document
Plan de Adquisiciones [38172764].DOCX
Jun. 03, 2014
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-1806629576-12
TC Abstract
RG-T2352 - TC Abstract (publicación) [38586174].PDF
Feb. 10, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1068806781-5
Monografía Interconexiones.pdf
Jan. 12, 2018
https://www.iadb.org/document.cfm?id=EZSHARE-2078212163-11
CIER_Aviso_de_Adjudicacion_del_Contrato_FINAL.pdf
Oct. 30, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-89727934-16
Publication
integracion-electrica-regional-oportunidades-y-retos-que-enfrentan-los-paises-de-america-latina-y-el-caribe.pdf
Jan. 13, 2020
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top