Sustainable Rural Electrification Program in Panama
The overall objective of the program is to improve the quality of life of the rural population of Panama by increasing access to sustainable electricity services in rural areas through an efficient use of public resources in the subsector of rural electrification. The specific objectives are: i) promote public-private efforts to finance investment incentives in off the grid extension projects and isolated systems that allow the incorporation of rural populations without electrification, and ii) improve the capacity of the OER for formulation and implementation of rural electrification projects.

Project Detail

Country

Panama

Project Number

PN-L1095

Approval Date

April 16, 2014

Project Status

Closed

Project Type

Loan Operation

Sector

ENERGY

Subsector

RURAL ELECTRIFICATION

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental Classification

Likely to cause minimal or no negative environmental and associated social impacts

Total Cost

USD 22,250,000.00

Country Counterpart Financing

USD 2,250,000.00

Original Amount Approved

USD 20,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
3165/OC-PN Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
3166/CH-PN Sovereign Guaranteed USD - United States Dollar China Co-Financing Fund for Latin Americ Public Sector Trust Fund Lending
Operation Number 3165/OC-PN
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility
Operation Number 3166/CH-PN
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: China Co-Financing Fund for Latin Americ
  • Financial Instrument: Public Sector Trust Fund Lending

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000366-2056220512-9310
Contrato Modificatorio No. 1 - Programa de Electrificación Rural Sostenible - II - OC.pdf
Published Apr. 17, 2023
Download
https://www.iadb.org/document.cfm?id=EZIDB0000366-2056220512-9311
Contrato Modificatorio No. 1 - Programa de Electrificación Rural Sostenible - II - CH.pdf
Published Apr. 17, 2023
Download
https://www.iadb.org/document.cfm?id=EZIDB0000366-2056220512-9298
Contrato Modificatorio No. 1 - 3165-OC-PN - Programa de Electrificación Rural Sostenible II.pdf
Published Apr. 05, 2023
Download
https://www.iadb.org/document.cfm?id=EZIDB0000366-2056220512-9299
Contrato Modificatorio No. 1 - 3166-CH-PN - Programa de Electrificación Rural Sostenible II.pdf
Published Apr. 05, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-41428
PN-L1095 Second period Jan-Dec 2021 - Public Report.PDF
Published Aug. 15, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35842
PN-L1095 First period Jan-Jun 2021 - Public Report.pdf
Published Mar. 01, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-962341861-4187
2022-01-04 Informe de Auditoria a los Estados Financieros al 26 de agosto de 2021.pdf
Published Jan. 13, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35034
PN-L1095 Second period Jan-Dec 2020 - Public Report.pdf
Published Jul. 21, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-105207348-99
2021-04-28 Informe de Auditoria a los Estados Financieros al 31 de diciembre 2020.pdf
Published May. 05, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34121
PN-L1095 First period Jan-Jun 2020 - Public Report.pdf
Published Mar. 09, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33753
PN-L1095 Second period Jan-Dec 2019-Public Report.pdf
Published Aug. 25, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-962341861-4075
2020-05-27 Informe de Estados Financieros PERSII No.pdf
Published Dec. 11, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-76669266-6
PN-L1095 First period Jan-Jun 2016-Public Report [40799450].PDF
Published Dec. 27, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1653349118-23
PN-L1095 [40388008].PDF
Published Jul. 12, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1653349118-22
PN-L1095 [40382334].PDF
Published Jul. 07, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-76669266-5
PN-L1095 Second period Jan-Dec 2015-Public Report [40359858].PDF
Published Jun. 23, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-76669266-4
PN-L1095 First period Jan-Jun 2015-Public Report [40209598].PDF
Published Mar. 28, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-76669266-3
PN-L1095 Second period Jan-Dec 2014-Public Report [40176510].PDF
Published Mar. 11, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-76669266-2
PN-L1095 First period Jan-Jun 2014-Public Report [40174306].PDF
Published Mar. 10, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1653349118-21
PN-L1095 [39887407].PDF
Published Oct. 02, 2015
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1653349118-20
PN-L1095 [39180215].PDF
Published Oct. 24, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-402
Contrato - Programa de Electrificación Rural Sostenible - II [39182197].PDF
Published Oct. 27, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-403
Contrato - Programa de Electrificación Rural Sostenible - II [39182220].PDF
Published Oct. 27, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-332637299-3
Programa de Electrificación Rural Sostenible II - Propuesta de Préstamo al Directorio [38682584].PDF
Published Mar. 19, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1653349118-19
Panama - Loan Proposal - Sustainable_Rural_Electrification_Program_-_II [38736056].PDF
Published Apr. 14, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1653349118-17
Ignacio_Coral_Informe_Evaluación_Económica [38633376].PDF
Published Apr. 14, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1653349118-18
Filtro_y_Formulario_de_Análisis_de_Salvaguardias [38633636].PDF
Published Apr. 14, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1653349118-14
Plan_de_Adquisiciones_Completo_OER [38633370].PDF
Published Apr. 14, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1653349118-15
Plan_de_Seguimiento_y_Evaluación (PSE) [38633372].PDF
Published Apr. 14, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1653349118-16
Borrador_Manual_de_Operaciones_del_Programa [38633375].PDF
Published Apr. 14, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1653349118-13
PN-L1095 Análisis de Cumplimiento Política de Servicios Públicos Dominciliarios [38566043].doc
Published Nov. 04, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1653349118-11
PN-L1095 -POA 2014-OER [38386180].PDF
Published Apr. 14, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-962218551-10
MIF_ Project Status Report ATN_ME-11940-CO [36435905].PDF
Published Sep. 28, 2011
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1397
PN-L1095 First period Jan-Jun 2017-Public Report.pdf
Published Feb. 15, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-2175
PN-L1095 Second period Jan-Dec 2017-Public Report.pdf
Published Aug. 03, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31815
PN-L1095 First period Jan-Jun 2018-Public Report.pdf
Published Dec. 14, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1374531426-4488
PN-L1095_Análisis_de_Cumplimiento_Política_de_Servicios_Públicos_Dominciliarios_[38566043]_doc.doc
Published Mar. 12, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32490
PN-L1095 Second period Jan-Dec 2018-Public Report.pdf
Published Oct. 16, 2019
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33109
PN-L1095 First period Jan-Jun 2019-Public Report.pdf
Published Feb. 12, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-351
PN-L1095 Second period Jan-Dec 2016-Public Report.pdf
Published Feb. 15, 2018
Download
Closed Phase
https://www.iadb.org/document.cfm?id=EZSHARE-332637299-26
PN-L1095 - PCR - Version final.pdf
Published Aug. 11, 2022
Download
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-332637299-18
PN_L1095_Specific Development Objectives.pdf
Published Apr. 14, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-332637299-13
Annex 1 - PCR Checklist PN-L1095 20220517.xlsx
Published Apr. 14, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-332637299-14
PCR Presentacion Panama 20220205.pptx
Published Apr. 14, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-332637299-15
PCR PN-L1095 Minutas Taller de Terminacion de Proyecto.docx
Published Apr. 14, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-332637299-16
PCR PN-L1095 Resumen DEM.pdf
Published Apr. 14, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-332637299-17
PRODUCTO 2 - PN-L1095 Evaluacion Costo Benefico Ex post.docx
Published Apr. 14, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-962341861-2
Estados Financieros 2014 - Programa de Electrificación Rural Sostenible II [40262806].PDF
Published Aug. 05, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1653349118-12
PN-L1095 - Informe Final Jornada Taller - Evaluación de Riesgos [38391702].PDF
Published Apr. 14, 2014
Download
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-332637299-2
PN-L1095 - PP (publicación) [38277970].PDF
Published Dec. 03, 2013
Download

Have an Environmental or Social issue related to IDB projects? File a Complaint

Publications
Published 2021
NDC Invest: Supporting Transformational Climate Policy and Finance
El Grupo Intergubernamental de Expertos sobre el Cambio Climático (IPCC por sus siglas en inglés) indica que para cumplir con el objetivo del Acuerdo de París de limitar el aumento de la temperatura global con respecto a los niveles preindustriales a entre 1,5 C y 2 C se requiere alcanzar cero emisiones netas de dióxido de carbono (CO2), así como profundas reducciones en las emisiones de otros gases de efecto invernadero (GEI) hacia mediados de siglo (IPCC 2018). Al mismo tiempo, los países deben construir resiliencia climática para hacer frente a los impactos inevitables. NDC Invest se creó como la ventanilla única del Grupo BID que proporciona apoyo técnico y financiero a los países de América Latina y el Caribe en sus esfuerzos por alcanzar los objetivos climáticos del Acuerdo de París, buscando la transición a cero emisiones netas de carbono y vías de desarrollo resilientes y sostenibles que mejoren la calidad de vida y la prosperidad en América Latina y el Caribe. Al aprender y comprender estos desafíos y al poner a prueba soluciones, hemos desarrollado una caja de herramientas de apoyo. Este documento describe los tres productos de NDC Invest a través de los cuales apoyamos a los gobiernos para encarar estos desafíos y ampliar acciones para afrontar el cambio climático y el desarrollo sostenible: i) el diseño de Estrategias a Largo Plazo (LTS por sus siglas en inglés) para cero emisiones netas y resiliencia climática; ii) diseño de Contribuciones Determinadas a Nivel Nacional (NDCs) ambiciosas, alineadas con las LTS; y iii) diseño de planes de inversión y estrategias financieras. Nuestros tres productos no son una receta fija, sino más bien una caja de herramientas para ofrecer soluciones flexibles y pertinentes adaptadas a las necesidades y el contexto de los países, y a las diferentes etapas de diseño e implementación de sus objetivos climáticos.
Blogs
Published 2022
Give Credit Where It Is Due: Firm Financing in a Post-Pandemic Caribbean
Joint research from the IDB’s Caribbean Department, IDB Invest, and the Complete Caribbean Partnership uses enterprise survey data to highlight that firms from across the Caribbean face challenges when it comes to access to finance, particularly given the depth and development of credit and capital markets. Findings suggest that the most pressing barriers to finance
Blogs
Published 2022
The Impact of War on External Financing in Latin America and the Caribbean
Since March of 2022, the war between Russia and Ukraine has significantly impacted the global economy, affecting recovery from the COVID-19 pandemic and reducing or halting growth in most of the world’s regions. By disrupting the supply of agricultural and energy commodities, it has also fuelled inflation, which was already running hot before the war
Datasets
Published 2023
IDB Project Procurement Contract Awards Data
This database compiles information on contract awards related to IDB financed, sovereign-guaranteed operations in Latin America and the Caribbean. This database spans information since 2010. Data can also be viewed at https://projectprocurement.iadb.org/en/awarded-contracts
Blogs
Published 2023
Ministerios de economía y finanzas frente al cambio climático: 7 avances en la agenda fiscal verde
En este blog resumimos los principales avances sobre la agenda fiscal verde , que está siendo impulsada por la Plataforma Regional de Cambio Climático de los Ministerios de Hacienda, Economía y Finanzas de América Latina, una red de trabajo integrada por los 26 países miembros prestatarios del BID
Blogs
Published 2022
Transporte inclusivo en áreas rurales: un catalizador para la reducción de pobreza y desarrollo rural
Pobreza rural y transporte rural en América Latina y el Caribe América Latina y el Caribe es la región en desarrollo más urbanizada del mundo, con 8 de cada 10 personas que ahora viven en ciudades, las áreas rurales aún albergan el 18,5% de la población de la región, un estimado de 120,6 millones en 2020.
Publications
Published 2021
The IDB Group in the Central American Isthmus and the Dominican Republic: Activities Report 2020
2020 was an unprecedented year for Central America and the Dominican Republic. The effect of the global COVID-19 pandemic, exacerbated by the impact of Hurricanes Eta and Iota in some countries, caused the greatest economic contraction the region has undergone in its recent history - surpassing the debt crisis of the 1980s and the international financial crisis of 2009. In 2020, the IDB Group helped the countries in the region respond to these emergencies through approvals that exceeded US$ 4,900 million and disbursements of more than US$ 4,327 million, both reaching historical records. This report highlights the Groups main activities in Central America and the Dominican Republic in 2020 at the regional and country level.
Blogs
Published 2021
Día Internacional del Patrimonio Mundial: El papel del Grupo BID en la revitalización del Centro Histórico de Panamá
La Ciudad de Panamá alberga una joya del patrimonio mundial: su Centro Histórico, el cual es Patrimonio de la Humanidad desde 1997. Pese a ser el punto turístico más visitado del país, con los años, ha sufrido un grave estado de degradación. Con motivo del Día Internacional del Patrimonio Mundial, queremos concientizar sobre la importancia
Blogs
Published 2021
Mejorar el desarrollo infantil a partir de las visitas domiciliarias
Los programas de visitas domiciliarias que buscan mejorar el desarrollo infantil muestran resultados positivos y se pueden replicar. Lee más aquí
Blogs
Published 2023
¿Cómo superar los retos de la vivienda rural en América Latina y el Caribe?
Un hombre de américa latina y el caribe está en frente a su casa de un pueblo rural
Powered by FindIT
Jump back to top