Skip to main content
Investment and Coorporate Transformation Program for ETESA - Phase I
To support the suficiency, confiability and quality of transmission services in electricity sector of Panama, and to contribute with the sustainable development of the sector by means of the coorporative transformation of ETESA.

Project Detail

Country

Panama

Project Number

PN-L1031

Approval Date

October 8, 2008

Project Status

Closed

Project Type

Loan Operation

Sector

ENERGY

Subsector

NEW POWER DISTRIBUTION & TRANSMISSION PROJECTS

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 25,000,000.00

Country Counterpart Financing

USD 12,500,000.00

Original Amount Approved

USD 12,500,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
2024/OC-PN Sovereign Guaranteed USD - United States Dollar Ordinary Capital Single Currency Facility
Operation Number 2024/OC-PN
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Single Currency Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-8101
PN-L1031 Second period Jan-Dec 2013-Public Report [40169516].PDF
Published Mar. 08, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-7427
Rapport pour Publication_PMR-_PN-L1031-2013-1º-Período [38266296].PDF
Published Mar. 06, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-7706
Informe para Publicación_PMR-_PN-L1031-2013-1º-Periodo [38266961].PDF
Published Mar. 06, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-7985
Report for Publication_PMR-_PN-L1031-2013-1º-Period [38267634].PDF
Published Mar. 06, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-7148
Relatório para publicação_PMR-_PN-L1031-2013-1º-Período [38265632].PDF
Published Mar. 06, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-6278
Rapport pour Publication_PMR-_PN-L1031-2012-2º-Período [37874081].PDF
Published Jul. 27, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-5975
Relatório para publicação_PMR-_PN-L1031-2012-2º-Período [37873412].PDF
Published Jul. 27, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-6581
Informe para Publicación_PMR-_PN-L1031-2012-2º-Periodo [37874767].PDF
Published Jul. 27, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-6912
Report for Publication_PMR-_PN-L1031-2012-2º-Period [37875579].PDF
Published Jul. 27, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-4660
Relatório para publicação_PMR-_PN-L1031-2012-1º-Período [37352304].PDF
Published Dec. 19, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-4994
Rapport pour Publication_PMR-_PN-L1031-2012-1º-Período [37352968].PDF
Published Jan. 21, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-5662
Report for Publication_PMR-_PN-L1031-2012-1º-Period [37354291].PDF
Published Jan. 21, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-6104
Informe para Publicación_PMR-_PN-L1031-2012-1º-Periodo [37353626].PDF
Published Jan. 21, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-4366
Report for Publication_PMR-_PN-L1031-2011-2º-Period [37298444].PDF
Published Nov. 28, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-3982
Relatório para publicação_PMR-_PN-L1031-2011-2º-Período [37297862].PDF
Published Nov. 28, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-4110
Rapport pour Publication_PMR-_PN-L1031-2011-2º-Período [37298053].PDF
Published Nov. 28, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-4238
Informe para Publicación_PMR-_PN-L1031-2011-2º-Periodo [37298245].PDF
Published Nov. 28, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-888375931-483
PN-L1031 [36673614].PDF
Published Feb. 08, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-888375931-472
PN-L1031 [36595614].PDF
Published Dec. 20, 2011
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-1891
Relatório para publicação_PMR-_PN-L1031-2011-1º-Período [36624163].PDF
Published Jan. 12, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-2245
Rapport pour Publication_PMR-_PN-L1031-2011-1º-Período [36624746].PDF
Published Jan. 12, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-2599
Informe para Publicación_PMR-_PN-L1031-2011-1º-Periodo [36625301].PDF
Published Jan. 12, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-2970
Report for Publication_PMR-_PN-L1031-2011-1º-Period [36625861].PDF
Published Jan. 12, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-1128
Informe para Publicación_PMR-_PN-L1031-2010-2º-Periodo [36312895].PDF
Published Aug. 10, 2011
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-1523
Report for Publication_PMR-_PN-L1031-2010-2º-Period [36313470].PDF
Published Aug. 10, 2011
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-338
Relatório para publicação_PMR-_PN-L1031-2010-2º-Período [36311733].PDF
Published Aug. 10, 2011
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1856068004-738
Rapport pour Publication_PMR-_PN-L1031-2010-2º-Período [36312311].PDF
Published Aug. 10, 2011
Download
https://www.iadb.org/document.cfm?id=EZSHARE-888375931-417
CONSTRUCCIÓN DE LAS AMPLIACIONES DE LAS SUBESTACIONES Y DE LAS LÍNEAS DE TRANSMISIÓN Power [36195855].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-888375931-379
CONSTRUCCIÓN DE LAS AMPLIACIONES DE LAS SUBESTACIONES Y DE LAS LÍNEAS DE TRANSMISIÓN [35844433].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-888375931-266
CONSTRUCCIÓN DE LÍNEAS DE TRANSMISIÓN H [35318619].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-888375931-238
PLAN DE ADQUISICIONES Febrero 2010 (FARROCHA) [26078829].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-888375931-255
PLAN DE ADQUISICIONES Febrero 2010 (FARROCHA) [35219760].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-888375931-83
Programa de Inversión y Transformación Corporartiva de la Empresa de Transmisión Eléctrica (ETESA) [1807460].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-888375931-84
Investment and Corporate Transformation Program for Empresa de Transmisión (ETESA) [1807461].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-7775
Contrato - Programa de Inversión y Transformación Corporativa de la Empresa de Transmisión Eléctrica (ETESA).pdf
Published May. 08, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-7776
Contrato de Garantía - Programa de Inversión y Transformación Corporativa de la Empresa de Transmisión Eléctrica (ETESA).pdf
Published May. 08, 2020
Download
Closed Phase
https://www.iadb.org/document.cfm?id=EZSHARE-888375931-665
PANAMA_ Programa de Inversión y Transformación Corporativa de la Empresa de Transmisión Eléctrica, S_A_ (PCR) [39220616].PDF
Published Dec. 29, 2014
Download
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-888375931-82
Informe de Gestión Ambiental y Social (Jul 2008) [1781368].PDF
Published Dec. 31, 1999
Download
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-888375931-37
PANAMA_ Programa de Inversión y Transformación Corporativa de la Empresa de Transmisión Eléctrica (ETESA) - Etapa [1415302].PDF
Published Apr. 29, 2008
Download

Have an Environmental or Social issue related to IDB projects? File a Complaint

Publications
Published 2021
El laberinto de las estadísticas de inversión extranjera en América Latina
Durante las últimas décadas, la atracción de inversión extranjera directa (IED) se ha destacado en las prioridades de política de los países América Latina y el Caribe (ALC), sin embargo, las importantes limitaciones en la disponibilidad de datos de este tipo de inversión dificultan la toma de decisiones. Esta nota, es la segunda de una serie de publicaciones centradas en el rol y el impacto de la IED en la región que lanzó del BID-INTAL y busca relevar el estado de situación de las estadísticas de IED en ALC, transparentar las diferencias metodológicas existentes, facilitar el acceso a dicha información e identificar posibles acciones tendientes a una mayor armonización de la presentación de datos a escala regional.
Publications
Published 2021
Soluciones basadas en la naturaleza en América Latina y el Caribe: apoyo del Banco Interamericano de Desarrollo
Los gobiernos de América Latina y el Caribe se enfrentan al reto de ampliar y mantener las infraestructuras para atender a sus poblaciones, especialmente a medida que el cambio climático y la degradación de los ecosistemas ponen en peligro a las comunidades y a los activos de infraestructuras de toda la región. Para ayudar a afrontar estos retos, el Banco Interamericano de Desarrollo (BID) aspira incrementar su apoyo a las soluciones basadas en la naturaleza (SBN) de acuerdo con el Plan de Acción de Sostenibilidad Ambiental y Social 2020 del banco. Este resumen sirve para dos funciones. En primer lugar, se describe el creciente interés del BID en las SBN y ofrece un recorrido por las principales ofertas del BID en materia de apoyo a proyectos e inversiones en SBN. En segundo lugar, sirve como línea base de las actividades de BID en relación a SBN, a partir de la cual el banco y sus socios pueden seguir avanzando. En adelante, el BID intensificará su apoyo a los clientes para que incorporen las consideraciones de las SBN y el análisis de oportunidades en los acuerdos con los países y en todas las etapas de preparación de los proyectos, desde la identificación de la inversión hasta su ejecución.
Blogs
Published 2022
Após reunir 5 mil participantes em megaevento no Brasil, BID reitera compromisso com investimentos no país
A quinta edição do Brasil Investment Forum (BIF 2022) teve, mais uma vez, um alcance expressivo, ao reunir cerca de 5 mil participantes e investidores de 100 países. E nós, do Grupo BID, reafirmamos no evento o nosso compromisso em apoiar os investimentos no país, segundo o próprio presidente Mauricio Claver-Carone. “O potencial do Brasil
Blogs
Published 2023
Corrida contra o tempo: o potencial da filantropia e do blended finance para escalar o investimento sustentável
O cenário atual de recessão global vem resultando em uma enorme pressão fiscal e pede urgência para repensar como devemos combinar soluções financeiras públicas e privadas para alavancar investimentos necessários para responder à crise climática e ambiental e à transição para um desenvolvimento mais sustentável. O Fórum Econômico Mundial estimou que o custo de transição
Blogs
Published 2023
Colaboración y alianzas para la financiación de la lucha contra el cambio climático
Durante más de diez años, el BID ha forjado alianzas estratégicas con fuentes externas de financiación para invertir en un desarrollo bajo en carbono y resiliente al clima. En 2022, el Directorio del BID aprobó más de 500 millones de dólares de fondos externos procedentes de los Climate Investment Funds (CIF, por sus siglas en inglés), el Fondo Verde para el Clima (GCF, por sus siglas en inglés) y el NDC Pipeline Accelerator (ACL). Esta cifra puede parecer bastante significativa, sin embargo, la Agencia Internacional de la Energía establece que 4 billones de dólares anuales será el coste para llegar a cero emisiones netas en 2050.
Blogs
Published 2023
¿Por qué los fondos inmobiliarios son una buena alternativa para financiar proyectos de renovación urbana?
Reflejo de agua en una calle de america latina
Blogs
Published 2023
Skills: The New Push to Attract Investment 
Skills and talent as a brand is a strong driver to investment
Blogs
Published 2023
Desarrollo sostenible e inclusivo en América Latina y el Caribe: el papel vital de las políticas de ciencia, tecnología e innovación
El seminario LALICS 2023 realizado en Paraguay, reunió a más de 100 investigadores y expertos locales e internacionales dedicados al estudio de la innovación y su vinculación con el desarrollo de la región. El tema central de debate fue el desarrollo sostenible en América Latina y el Caribe (ALC) y el rol de las políticas
Blogs
Published 2023
¿Deberían los países de América Latina y el Caribe reducir los impuestos a la renta corporativa para estimular la inversión y el crecimiento?
América Latina y el Caribe (ALC) presenta de tasas de inversión crónicamente bajas, lo que perjudica el crecimiento económico. Considerando que los altos impuestos a la renta corporativa desincentivan la inversión de las empresas, una cuestión importante de política pública es si la región debería reducir estos impuestos. Un primer paso para responder a esta
Courses
Published 2024
Padrão de Desempenho Ambiental e Social 7- Povos Indígenas
O curso Padrão 7 de Desempenho Ambiental e Social: Povos Indígenas (ESPS 7) é uma oportunidade para conhecer o novo Padrão 7 de desempenho sobre povos indígenas. Por meio de leituras, material audiovisual e testes, você compreenderá a importância de garantir que os projetos do BID respeitem os direitos humanos, a dignidade, as aspirações e a cultura dos povos indígenas; a evitar, minimizar ou compensar impactos adversos neste contexto; e a promover oportunidades de desenvolvimento sustentável condizentes com a cultura destes povos.
Powered by FindIT
Jump back to top