Skip to main content

Port Security - Phase II

a) To implement a national training program, based on the guidelines proposed in Fase I of the TC; b) to support the implementation of the second phase of the Port Protection Plan concerning ISPS, in Paita and Ilo terminals; c) to assess the port protection system in such terminals and to identify potential investment needs; d) to analyze potential impacts and benefits derived from processes reengineering in the logistic chains of containers and dangerous goods (lead) aimed at adopting protection measures proposed for El Callao port in the Fase I of the TC.

Project Detail

Country

Peru

Project Number

PE-T1032

Approval Date

October 31, 2007

Project Status

Closed

Project Type

Technical Cooperation

Sector

TRANSPORT

Subsector

TRANSPORT

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

Likely to cause minimal or no negative environmental and associated social impacts

Total Cost

USD 205,020.00

Country Counterpart Financing

USD 11,200.00

Original Amount Approved

USD 193,820.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/FC-10653-PE Sovereign Guaranteed USD - United States Dollar French Technical Cooperation Fund for Co Nonreimbursable
Operation Number ATN/FC-10653-PE
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: French Technical Cooperation Fund for Co
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-686533642-59
TC Brief
Seguridad Portuaria - Fase II [1218237].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-686533642-11
Profile I
Seguridad portuaria y logística en Perú Fase II [804580].PDF
Dec. 31, 1999
Spanish
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-7721
Technical Cooperation Agreement
Convenio - Programa de Seguridad Portuaria - Fase II.pdf
May. 08, 2020
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top