Line 2 and 4, Lima Metro
The project consists of the construction of the Line 2 Lima Metro (East-West) and a segment of the line 4 to the International Airport. The project will be executed through a cofinanced concession

Project Detail

Country

Peru

Project Number

PE-L1147

Approval Date

December 3, 2014

Project Status

Closed

Project Type

Loan Operation

Sector

TRANSPORT

Subsector

PUBLIC TRANSPORT (BUS / TRAIN / CABLE). INFRASTRUCTURE AND EQUIPMENT

Lending Instrument

Investment Loan

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental Classification

Likely to cause significant negative impacts, or have profound implications affecting natural resources

Total Cost

USD 4,185,510,000.00

Country Counterpart Financing

USD 3,885,510,000.00

Original Amount Approved

USD 300,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
3373/OC-PE Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 3373/OC-PE
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Closed Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1173613785-5
Project Completion Report
PE-L1147 PCR Metro de Lima - Final.pdf
Jan. 27, 2023
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-163366841-13
Electronic Links
EEO_1 Productos ejecutados PE-L1147.docx
Jan. 24, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-163366841-11
Anexo Check List PCR Metro Lima - 10-22.xlsx
Jan. 24, 2023
https://www.iadb.org/document.cfm?id=EZSHARE-163366841-12
Electronic Links
PE-L1147 - Justificacion cambios MdR en Convergencia.docx
Jan. 24, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-163366841-10
Electronic Links
EER_1 Resumen de la Matriz de Efectividad del Desarrollo (DEM).pdf
Jan. 24, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-163366841-9
Electronic Links
EER_2 Version Final del Reporte de Monitoreo del Programa (PMR).pdf
Jan. 24, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-22
EEO_7 - CONTRATO CONCESION [38996465].ZIP
Nov. 17, 2014
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-41166
Project Monitoring Report ( Public version)
PE-L1147 Second period Jan-Dec 2021 - Public Report.PDF
Aug. 15, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-261879077-140
Annual Project Audited Financial Statement
Informe de Estados Financieros Auditados Linea 2.pdf
Sep. 28, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35676
Project Monitoring Report ( Public version)
PE-L1147 First period Jan-Jun 2021 - Public Report.pdf
Feb. 22, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35001
Project Monitoring Report ( Public version)
PE-L1147 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 20, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-261879077-75
Annual Project Audited Financial Statement
2021-06-30 Informe de Auditoria a los Estados Financieros al 31 de diciembre de 2020.pdf
Jul. 05, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34316
Project Monitoring Report ( Public version)
PE-L1147 First period Jan-Jun 2020 - Public Report.pdf
Mar. 09, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-261879077-46
Annual Project Audited Financial Statement
Estados Financieros Auditados 2019.pdf
Dec. 02, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33726
Project Monitoring Report ( Public version)
PE-L1147 Second period Jan-Dec 2019-Public Report.pdf
Aug. 25, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-163366841-5
Project Monitoring Report ( Public version)
PE-L1147 First period Jan-Jun 2016-Public Report [40801423].PDF
Dec. 28, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-163366841-4
Project Monitoring Report ( Public version)
PE-L1147 Second period Jan-Dec 2015-Public Report [40359778].PDF
Jun. 23, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-163366841-3
Project Monitoring Report ( Public version)
PE-L1147 First period Jan-Jun 2015-Public Report [40209575].PDF
Mar. 28, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-163366841-2
Project Monitoring Report ( Public version)
PE-L1147 Second period Jan-Dec 2014-Public Report [40176486].PDF
Mar. 11, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-723
Loan Contract
Contrato - Construcción de la Línea 2 y Ramal Avenida Faucett – Gambetta de la Red Básica del Metro de Lima y Ca [39647494].PDF
May. 26, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-25847
Loan Proposal
PERU_ Construction of Line 2 and the Av_ Faucett Gambeta Section of the Lima and Callao Metro Basic Network Prov [39242732].PDF
Feb. 17, 2015
English
https://www.iadb.org/document.cfm?id=EZSHARE-1173613785-3
Loan Proposal
Perú_ Línea 2 y Tramo de la Línea 4 del Metro de Lima y Callao (PE-T1147)_ [39228694].PDF
Nov. 17, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-28
Loan Proposal
EEO_1 - Mapa [39036006].PDF
Nov. 17, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-29
Loan Proposal
EEO_3 - Costos Adicionales e Impacto Fiscal [39036007].DOCX
Nov. 17, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-27
Loan Proposal
EER_4 - IGAS [39030579].docx
Nov. 17, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-25
Loan Proposal
EEO_2 - Evaluacion Economica [39022582].docx
Nov. 17, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-26
Loan Proposal
EEO_9 - Analisis Legal y Distribucion de Riesgos contrato concesion [39022697].docx
Nov. 17, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-23
Loan Proposal
EEO_11 - Parámetros de Evaluación - Dirección del Sistema Nacional de Inversión Pública - Anexo_SNIP_10 [39003644].PDF
Nov. 17, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-21
Loan Proposal
EER_3 - Plan de Seguimiento y Evaluación [38996345].doc
Nov. 17, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-14
Loan Proposal
EEO_5 Anexo Técnico Integración Regional [38992155].docx
Nov. 17, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-17
Loan Proposal
EEO_8 - Revisión proceso de contratación del concesionario Metro de Lima [38995669].PDF
Nov. 17, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-15
Loan Proposal
EER_5a - Evaluación de Riesgos [38993594].docx
Nov. 17, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-16
Loan Proposal
EEO_13 - Evaluación de Riesgos [38993601].xlsx
Nov. 17, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-20
Loan Proposal
EER_2 - Project Execution Plan [38995888].PDF
Nov. 17, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-30
Loan Proposal
EEO_10 evaluacion riesgo de demanda [39036008].PDF
Nov. 17, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-18
Loan Proposal
EEO_6 - Esudio de Factibilidad del Metro de Lima [38995714].docx
Nov. 17, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-24
Loan Proposal
EEO_12 - Actualizacion_TSD_Junio_2012 [39012240].PDF
Nov. 17, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-19
Loan Proposal
EEO_4 - Estudio de Demanda Metro de Lima [38995762].PDF
Nov. 17, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-463
Project Monitoring Report ( Public version)
PE-L1147 Second period Jan-Dec 2016-Public Report.pdf
Feb. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-759438097-125
Annual Project Audited Financial Statement
Informe de Auditoría de los Estados Financieros - Año Fiscal 2017 - 3373-OC-PE.pdf
Jul. 05, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-2151
Project Monitoring Report ( Public version)
PE-L1147 Second period Jan-Dec 2017-Public Report.pdf
Aug. 02, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1338375869-5124
Annual Project Audited Financial Statement
Estados Financieros Auditados 2018.pdf
Jul. 05, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31794
Project Monitoring Report ( Public version)
PE-L1147 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32466
Project Monitoring Report ( Public version)
PE-L1147 Second period Jan-Dec 2018-Public Report.pdf
Oct. 16, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33087
Project Monitoring Report ( Public version)
PE-L1147 First period Jan-Jun 2019-Public Report.pdf
Feb. 13, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1115
Project Monitoring Report ( Public version)
PE-L1147 First period Jan-Jun 2017-Public Report.pdf
Feb. 15, 2018
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-25846
Resettlement Plans
PACRI BID 1ERA 11 11 14 Final Logo [39256793].DOCX
Dec. 02, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-13
Environmental Impact Assessments
Análisis Complementario del EIAs del Metro de Lima PE-L1147 [38965966].PDF
Aug. 01, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-12
Environmental Impact Assessments
Estudio de Impacto Ambiental Semi detallado - Resumen Ejecutivo PE-L1147 [38960961].PDF
Jul. 31, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-11
Environmental Impact Assessments
Estudio de Impacto Ambiental - Metro de Lima PE-L1147 [38960959].PDF
Jul. 31, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1173613785-2
Project Profile
Perú_ Línea 2 y Tramo de la Línea 4 del Metro de Lima (PE-L1147)_PP [38853210].PDF
Jun. 11, 2014
Spanish