Skip to main content
Line 2 and 4, Lima Metro
The project consists of the construction of the Line 2 Lima Metro (East-West) and a segment of the line 4 to the International Airport. The project will be executed through a cofinanced concession

Project Detail

Country

Peru

Project Number

PE-L1147

Approval Date

December 3, 2014

Project Status

Closed

Project Type

Loan Operation

Sector

TRANSPORT

Subsector

PUBLIC TRANSPORT (BUS / TRAIN / CABLE). INFRASTRUCTURE AND EQUIPMENT

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental Classification

Likely to cause significant negative impacts, or have profound implications affecting natural resources

Total Cost

USD 4,185,510,000.00

Country Counterpart Financing

USD 3,885,510,000.00

Original Amount Approved

USD 300,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
3373/OC-PE Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 3373/OC-PE
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Closed Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1173613785-5
PE-L1147 PCR Metro de Lima - Final.pdf
Published Jan. 27, 2023
Download
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-163366841-13
EEO_1 Productos ejecutados PE-L1147.docx
Published Jan. 24, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-163366841-11
Anexo Check List PCR Metro Lima - 10-22.xlsx
Published Jan. 24, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-163366841-12
PE-L1147 - Justificacion cambios MdR en Convergencia.docx
Published Jan. 24, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-163366841-10
EER_1 Resumen de la Matriz de Efectividad del Desarrollo (DEM).pdf
Published Jan. 24, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-163366841-9
EER_2 Version Final del Reporte de Monitoreo del Programa (PMR).pdf
Published Jan. 24, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-22
EEO_7 - CONTRATO CONCESION [38996465].ZIP
Published Nov. 17, 2014
Download
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-41166
PE-L1147 Second period Jan-Dec 2021 - Public Report.PDF
Published Aug. 15, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-261879077-140
Informe de Estados Financieros Auditados Linea 2.pdf
Published Sep. 28, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35676
PE-L1147 First period Jan-Jun 2021 - Public Report.pdf
Published Feb. 22, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35001
PE-L1147 Second period Jan-Dec 2020 - Public Report.pdf
Published Jul. 20, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-261879077-75
2021-06-30 Informe de Auditoria a los Estados Financieros al 31 de diciembre de 2020.pdf
Published Jul. 05, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34316
PE-L1147 First period Jan-Jun 2020 - Public Report.pdf
Published Mar. 09, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-261879077-46
Estados Financieros Auditados 2019.pdf
Published Dec. 02, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33726
PE-L1147 Second period Jan-Dec 2019-Public Report.pdf
Published Aug. 25, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-163366841-5
PE-L1147 First period Jan-Jun 2016-Public Report [40801423].PDF
Published Dec. 28, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-163366841-4
PE-L1147 Second period Jan-Dec 2015-Public Report [40359778].PDF
Published Jun. 23, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-163366841-3
PE-L1147 First period Jan-Jun 2015-Public Report [40209575].PDF
Published Mar. 28, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-163366841-2
PE-L1147 Second period Jan-Dec 2014-Public Report [40176486].PDF
Published Mar. 11, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-723
Contrato - Construcción de la Línea 2 y Ramal Avenida Faucett – Gambetta de la Red Básica del Metro de Lima y Ca [39647494].PDF
Published May. 26, 2015
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-25847
PERU_ Construction of Line 2 and the Av_ Faucett Gambeta Section of the Lima and Callao Metro Basic Network Prov [39242732].PDF
Published Feb. 17, 2015
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1173613785-3
Perú_ Línea 2 y Tramo de la Línea 4 del Metro de Lima y Callao (PE-T1147)_ [39228694].PDF
Published Nov. 17, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-28
EEO_1 - Mapa [39036006].PDF
Published Nov. 17, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-29
EEO_3 - Costos Adicionales e Impacto Fiscal [39036007].DOCX
Published Nov. 17, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-27
EER_4 - IGAS [39030579].docx
Published Nov. 17, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-25
EEO_2 - Evaluacion Economica [39022582].docx
Published Nov. 17, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-26
EEO_9 - Analisis Legal y Distribucion de Riesgos contrato concesion [39022697].docx
Published Nov. 17, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-23
EEO_11 - Parámetros de Evaluación - Dirección del Sistema Nacional de Inversión Pública - Anexo_SNIP_10 [39003644].PDF
Published Nov. 17, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-21
EER_3 - Plan de Seguimiento y Evaluación [38996345].doc
Published Nov. 17, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-14
EEO_5 Anexo Técnico Integración Regional [38992155].docx
Published Nov. 17, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-17
EEO_8 - Revisión proceso de contratación del concesionario Metro de Lima [38995669].PDF
Published Nov. 17, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-15
EER_5a - Evaluación de Riesgos [38993594].docx
Published Nov. 17, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-16
EEO_13 - Evaluación de Riesgos [38993601].xlsx
Published Nov. 17, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-20
EER_2 - Project Execution Plan [38995888].PDF
Published Nov. 17, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-30
EEO_10 evaluacion riesgo de demanda [39036008].PDF
Published Nov. 17, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-18
EEO_6 - Esudio de Factibilidad del Metro de Lima [38995714].docx
Published Nov. 17, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-24
EEO_12 - Actualizacion_TSD_Junio_2012 [39012240].PDF
Published Nov. 17, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-19
EEO_4 - Estudio de Demanda Metro de Lima [38995762].PDF
Published Nov. 17, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-463
PE-L1147 Second period Jan-Dec 2016-Public Report.pdf
Published Feb. 14, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-759438097-125
Informe de Auditoría de los Estados Financieros - Año Fiscal 2017 - 3373-OC-PE.pdf
Published Jul. 05, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-2151
PE-L1147 Second period Jan-Dec 2017-Public Report.pdf
Published Aug. 02, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1338375869-5124
Estados Financieros Auditados 2018.pdf
Published Jul. 05, 2019
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31794
PE-L1147 First period Jan-Jun 2018-Public Report.pdf
Published Dec. 14, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32466
PE-L1147 Second period Jan-Dec 2018-Public Report.pdf
Published Oct. 16, 2019
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33087
PE-L1147 First period Jan-Jun 2019-Public Report.pdf
Published Feb. 13, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1115
PE-L1147 First period Jan-Jun 2017-Public Report.pdf
Published Feb. 15, 2018
Download
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-25846
PACRI BID 1ERA 11 11 14 Final Logo [39256793].DOCX
Published Dec. 02, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-13
Análisis Complementario del EIAs del Metro de Lima PE-L1147 [38965966].PDF
Published Aug. 01, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-12
Estudio de Impacto Ambiental Semi detallado - Resumen Ejecutivo PE-L1147 [38960961].PDF
Published Jul. 31, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1782849275-11
Estudio de Impacto Ambiental - Metro de Lima PE-L1147 [38960959].PDF
Published Jul. 31, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1173613785-2
Perú_ Línea 2 y Tramo de la Línea 4 del Metro de Lima (PE-L1147)_PP [38853210].PDF
Published Jun. 11, 2014
Download

Have an Environmental or Social issue related to IDB projects? File a Complaint

Blogs
Published 2023
Un sueño hecho realidad: El Metro de Quito
Los beneficios sociales del proyecto Inicia la operación del Metro de Quito, el megaproyecto más importante de infraestructura urbana en la historia de Ecuador. Este sistema de transporte público masivo mejorará la movilidad de la ciudad en su eje principal norte-sur con capacidad adecuada para satisfacer la demanda actual y futura. Fue financiado por el
Blogs
Published 2022
Metro de Bogotá: ¿Cómo se maneja la fauna y la flora?
Gaby es el nombre del gavilán maromero recién nacido que se convirtió en el símbolo del compromiso medioambiental del proyecto de la Primera Línea del Metro de Bogotá (PLMB). El nido de esta ave fue detectado en el terreno donde inicia la vía, y para proteger el ambiente no fue retirado hasta que realizó su
Blogs
Published 2020
El viaje debe continuar. Lecciones del Metro de Medellín para la movilidad segura en tiempos de COVID-19
La Cultura Metro es un concepto que hemos vivido y apreciado todos los que en algún momento hemos tenido la oportunidad de usar el Metro de Medellín. Es aquella estrategia que esta hermosa ciudad colombiana empezó a construir y a involucrar en la vida y comportamiento de los paisas (como se conoce a los habitantes
Blogs
Published 2024
Identificación facial: ¿están protegidos nuestros datos biométricos faciales?
En un mundo donde la tecnología de reconocimiento facial (FRT, por sus siglas en inglés) se expande rápidamente, sus aplicaciones en contextos cotidianos también lo hacen. Por ejemplo, al acceder a una cuenta bancaria a través de un dispositivo móvil, al registrar la asistencia a la oficina o al autenticar nuestra identidad en un aeropuerto.
Blogs
Published 2022
¿Cómo el transporte público promueve cultura ciudadana?
En el primer semestre de 2022, casi 3.700 niñas, niños y adolescentes de colegios públicos participaron en el programa “Recorriendo nuestro metro”. Una iniciativa organizada por la Empresa Metro de Bogotá (EMB) para socializar el proyecto de la Primera Línea de Metro (PLMB) de la ciudad a través de juegos, animaciones y, recientemente, un espectáculo
Publications
Published 2021
Los arándanos en el Perú
El boom de los arándanos peruanos es una indudable historia de éxito. El país pasó de exportar virtualmente nada en el 2014 a exportar USD1000 millones, y ser el mayor exportador mundial de arándanos, solo 5 años después. Ese fenómeno se dio gracias a condiciones excepcionales para la producción de arándanos (alta productividad, períodos de crecimiento extremadamente cortos, amplias extensiones de tierra disponibles), a un sector privado muy profesional y a un conjunto de buenas políticas públicas (el buen funcionamiento del SENASA, los TC los proyectos de irrigación, la ley de promoción agraria, etc.). En este documento estudiamos tres empresas determinantes en este éxito. Camposol es la empresa pionera, una de las dos mayores exportadoras del cultivo y la primera multilatina agroexportadora del Perú. Inkas Berries es un empresa mediana, con fortaleza en genética, que trajo los arándanos al Perú y sigue desarrollando nuevas variedades. Hortifrut es una empresa chileno-peruana que tempranamente decidió que el Perú iba a ser un jugador importante a nivel mundial e invirtió fuertemente en el país.
Publications
Published 2021
Mecanismos públicos para viabilizar proyectos socioeconómicamente rentables y para garantizar su bancabilidad
Con el apoyo de Gobiernos e instituciones de investigación de América Latina y el Caribe, desde el BID desarrollamos en 2020 la Red de Análisis y Buenas Prácticas en Asociaciones Público-Privadas (Red APP), con el objetivo de mejorar el desarrollo de infraestructura en la región en términos de calidad, sostenibilidad, competitividad, y eficiencia. La Red APP nace con el objetivo de A) conectar las demandas públicas de conocimiento con la investigación aplicada desarrollada (en otras palabras, que los trabajos analíticos en materia de APPs respondan a lo que los desarrolladores de políticas y proyectos quieren saber sobre qué funciona y qué no); B) sistematizar la información: mediante la generación de información sistematizada para el análisis de proyectos, desde las decisiones de inversión hasta las de financiamiento; C) generar y coordinar la evidencia existente: mediante el desarrollo de trabajos analíticos a partir de información pública disponible generada por la red, así como conectar la investigación aplicada regional para potenciar sinergias en la generación de conocimiento. A comienzos de 2020, y partir de una Consulta Pública a Gobiernos de la región, se determinaron una serie de temas de interés comunes en el desarrollo de infraestructura mediante APP en torno a cinco grandes áreas: Regulación e Institucionalidad, Factibilidad y Estructuración de Proyectos Sostenibles, Financiamiento de Proyectos, Gestión de Riesgos y Monitoreo, y Evaluación, Desempeño e Impacto. El presente trabajo “Mecanismos Públicos para Viabilizar Proyectos Socioeconómicamente Rentables y para Garantizar su Bancabilidad” responde a dicha demanda y ha sido seleccionado a través de una convocatoria competitiva de propuestas.
Publications
Published 2021
Experiencia internacional en el reciclaje de activos de infraestructura pública: estudios de caso, impactos y lecciones aprendidas
A nivel internacional, pocos países han iniciado formalmente programas de reciclaje de activos de infraestructura pública, es decir, la monetización de activos de infraestructura pública existentes a través del sector privado y la reinversión en nueva infraestructura de los recursos financieros así obtenidos. Un reciente artículo de Muñoz et al. (2021) muestra teóricamente, a través de un modelo de generaciones traslapadas, que el reciclaje de activos puede generar crecimiento económico y abrir espacio fiscal. Con el objetivo de complementar la modelización teórica del reciclaje de activos públicos, este trabajo analiza algunas de las más relevantes experiencias internacionales en reciclaje. Así, se procura sistematizar lecciones aprendidas en el diseño de los procesos, la forma en la que se materializa el reciclaje, la tipología de los proyectos, las fuentes y los usos del reciclaje, la arquitectura institucional de los programas y sus impactos en la economía y la estabilidad fiscal. A tal efecto, se examinan los casos de Australia, México y Chile como posibles modelos de referencia para países que estudien esta iniciativa de política pública con potenciales beneficios fiscales y de crecimiento.
Blogs
Published 2023
Cómo la tecnología digital puede ofrecer servicios gubernamentales de forma más costo-efectiva
Los gobiernos de América Latina y el Caribe gestionan entre cinco y veinte servicios de transacciones por persona al año, los cuales van desde la expedición de permisos y documentos de identidad hasta la concesión de subsidios y la recaudación de impuestos. Estos servicios suelen ser lentos y engorrosos, lo que obliga a los ciudadanos
Blogs
Published 2019
A Rapid Transit System That Boosts Productivity
Confronted with sprawling development and paralyzing traffic, cities throughout Latin America and the Caribbean have moved to built rapid transit systems, ranging from subways to bus rapid transit systems (BRTs). New rapid transit, government officials hope, will get people out of their cars,  improve the environment and boost wellbeing and productivity. But demonstrating the effectiveness
Powered by FindIT
Jump back to top