Skip to main content

Energy PBL

The program supports the development of a New Sustainable Energy Matrix (NUMES) based on a comprehensive approach to technical, economic, environmental and social issues, and consistently with the goals of development of Peru, in order to maximize the sustainable benefits derived from energy resources.

Project Detail

Country

Peru

Project Number

PE-L1054

Approval Date

July 13, 2011

Project Status

Closed

Project Type

Loan Operation

Sector

ENERGY

Subsector

ENERGY

Lending Instrument

Préstamo de Apoyo a Reformas de Política

Lending Instrument Code

PBL

Modality

PBP (Programmatic Policy Base Loan)

Facility Type

-

Environmental Classification

Uncategorized Directive B.13

Total Cost

USD 25,000,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 25,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
2544/OC-PE Sovereign Guaranteed USD - United States Dollar Ordinary Capital Single Currency Facility
Operation Number 2544/OC-PE
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Single Currency Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1974239295-169
Tranche Release Reports
Informe de Cumplimiento de Condiciones para el Desembolso [36622051].PDF
Jan. 10, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1974239295-146
Loan Proposal
Programa para el Desarrollo de una Nueva Matriz Energética Sostenible III [36321083].PDF
Aug. 17, 2011
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1974239295-147
Loan Proposal
Development of a New Sustainable Energy Matrix Program III [36321340].PDF
Aug. 17, 2011
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-7692
Loan Contract
Contrato - Programa para el Desarrollo de una Nueva Matriz Energética Sostenible III.pdf
Apr. 10, 2020
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top