Skip to main content
Preinvestment Studies San Pedro Sula Highway Infrastructure Program
The objective of the TC is to conduct the preinvestment studies necessary for the preparation of the program HO-L1018, and in particular for the structuring of the project of the roads peripheric ring of SPS.

Project Detail

Country

Honduras

Project Number

HO-T1100

Approval Date

June 11, 2008

Project Status

Closed

Project Type

Technical Cooperation

Sector

TRANSPORT

Subsector

TRANSPORT

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 800,000.00

Country Counterpart Financing

USD 160,000.00

Original Amount Approved

USD 640,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-11025-HO Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-11025-HO
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1668164540-32
Plan de Adquisiciones Feb 11-Feb 12 [36331237].PDF
Published Sep. 14, 2011
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1122228078-309
Plan Adquisiciones (feb-10 a feb_11) - ATN_OC-11025-HO [35824256].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1122228078-310
HO-T1100B_pdf [35873109].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1122228078-270
ESTUDIO DE PREINVERSIÓN CORREDOR LOGÍSTICO DE SAN PEDRO SULA [35238492].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1122228078-106
PLAN DE ADQUISICIONES A FEBRERO 2010 [2195463].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1122228078-269
ESTUDIO DE PREINVERSIÓN CORREDOR LOGÍSTICO DE SAN PEDRO SULA [35238008].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1122228078-268
ANÁLISIS DE ALTERNATIVAS Y ELABORACIÓN DE PROYECTO EJECUTIVO [35237976].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-7477
Convenio - Programa sobre Estudios de Preinversión Corredor Logístico San Pedro Sula.pdf
Published Apr. 07, 2020
Download
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1122228078-98
Estudios de Preinversión Corredor Logístico San Pedro Sula [1483408].PDF
Published Dec. 31, 1999
Download

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top