Skip to main content

Master Plan for Rehabilitation and Management of the Trutier Site

The objective of the Project is to prepare a specific transitory and long term Strategy/Plan for solid waste collection and disposal system.

Project Detail

Country

Haiti

Project Number

HA-T1136

Approval Date

November 11, 2010

Project Status

Closed

Project Type

Technical Cooperation

Sector

WATER AND SANITATION

Subsector

WATER AND SANITATION

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 360,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 360,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/KP-12488-HA Sovereign Guaranteed USD - United States Dollar Korea Poverty Reduction Fund Nonreimbursable
Operation Number ATN/KP-12488-HA
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Korea Poverty Reduction Fund
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-2113223422-56843
Technical Cooperation Profile
Master Plan for the rehabilitation and management of the tritier site at Port-Au-Prince [35443416].PDF
Dec. 31, 1899
English
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-7439
Technical Cooperation Agreement
Contrat - Projet de Plan Directeur pour la Réhabilitation et la Gestion du Site Trutier à Port-Au-Prince.pdf
Mar. 25, 2020
French

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top