Support to Improve Maternal and Child Health
The operation will support among other activities: (i) quality improvements to maternal, neonatal, child, and reproductive health services at the primary as well as at the hospital level focusing on the areas with the highest concentrations of deaths: the focus here will also be on strengthening, among other strategies, Essential Neonatal Obstetrical Care (ENOC) and Emergency Obstetrical Neonatal Care (EONC); (ii) strengthening health service delivery capacity to increase coverage and use/demand for certain services and strengthen practices by the target population. Capacity building will also support the delivery of effective counseling services towards behavior change related to care-seeking for early prenatal and post-natal controls and attitudes towards institutional deliveries; and (iii) implementation of innovative financing schemes to overcome demand side barriers (such as transport related costs to access institutional delivery) faced by the targeted population and implementation of a reward system for improved performance by service providers

Project Detail

Country

Guyana

Project Number

GY-L1058

Approval Date

October 26, 2016

Project Status

Closed

Project Type

Loan Operation

Sector

HEALTH

Subsector

HEALTH SYSTEM STRENGTHENING

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 8,000,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 8,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
3779/BL-GY Sovereign Guaranteed USD - United States Dollar Ordinary Capital Single Currency Facility and Concessional Financing
Operation Number 3779/BL-GY
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Single Currency Facility and Concessional Financing

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-43648
GY-L1058 Second period Jan-Dec 2022 - Public Report.PDF
Published Jul. 20, 2023
Download
https://www.iadb.org/document.cfm?id=EZIDB0000289-1981211944-290
Final Audited Financial Statements for period ended December 21 2022 - 3779.pdf
Published May. 31, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-42363
GY-L1058 First period Jan-Jun 2022 - Public Report.PDF
Published Feb. 08, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-41396
GY-L1058 Second period Jan-Dec 2021 - Public Report.PDF
Published Aug. 12, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1981211944-106
Audited Financial Statements for year ended 2021 - 3779.pdf
Published Sep. 12, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-33273
GY-L1058_P972319_SP.pdf
Published May. 04, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1025397358-870
REQUEST_FOR_EXPRESSIONS_OF_INTEREST Supply Chain Assessment.pdf
Published Apr. 22, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32962
GY-L1058_P940952_SP.pdf
Published Mar. 15, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32961
GY-L1058_P940949_SP.pdf
Published Mar. 15, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35556
GY-L1058 First period Jan-Jun 2021 - Public Report.pdf
Published Feb. 20, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1981211944-101
Audited Financial Statements for year 2020 - 3779.pdf
Published Sep. 28, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1025397358-750
GY-L1058 - Procurement Plan 2021 Version 2021-7.xlsx
Published Oct. 18, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34895
GY-L1058 Second period Jan-Dec 2020 - Public Report.pdf
Published Jul. 20, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1025397358-719
GENERAL_PROCUREMENT_NOTICE-LO3779BLGY Rev. 1.pdf
Published Jul. 07, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1025397358-703
GY-L1058 - Procurement Plan 2021 Version 2021-6.xlsx
Published Jun. 23, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30699
GY-L1058_P695976_SP.pdf
Published Mar. 19, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34513
GY-L1058 First period Jan-Jun 2020 - Public Report.pdf
Published Mar. 09, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-8431
Amendatory Contract No. 1 - Support to Improve Maternal and Child Health.pdf
Published Feb. 10, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33587
GY-L1058 Second period Jan-Dec 2019-Public Report.pdf
Published Aug. 24, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25954
GY-L1058_P543690_SP.pdf
Published Aug. 17, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1981211944-63
GY-L1058 Audited Financial Statements for the year ended December 31, 2019.pdf
Published Dec. 09, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1492813642-11
Audited Financial Statements - Fiscal Year 2017 - 3779-BL-GY.pdf
Published Oct. 25, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1190183301-23
Apoyo para Mejorar la Salud Maternoinfantil [40710103].PDF
Published Oct. 17, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1190183301-15
Opt_ link_1 - Institutional Assessment of the Ministry of Public Health [40431889].doc
Published Oct. 17, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1190183301-16
Procurement Plan [40456552].xlsx
Published Oct. 17, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1190183301-17
Optional Link - Draft Operations Manual [40689223].PDF
Published Oct. 17, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1190183301-18
Optional link - ESR filters [40689560].PDF
Published Oct. 17, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1190183301-19
Annex III - Board [40689752].docx
Published Oct. 17, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1190183301-20
Annex II - Board [40689757].docx
Published Oct. 17, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1190183301-21
Annex I - Board [40691067].PDF
Published Oct. 17, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1190183301-22
Support to Improve Maternal and Child Health [40710090].PDF
Published Oct. 17, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1190183301-13
Req_ link - Environmental and Social Management Report [40410790].doc
Published Oct. 17, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1190183301-27
Req_ link - Monitoring and Evaluation Plan [40410817].doc
Published Jan. 26, 2017
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1190183301-14
Link-Ex Ante Economic Analysis [40413086].docx
Published Oct. 17, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1190183301-12
Req_ link - PEP [40408518].PDF
Published Oct. 17, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-5143
Contract - Support to Improve Maternal and Child Health.pdf
Published May. 09, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-665
GY-L1058 Second period Jan-Dec 2016-Public Report.pdf
Published Feb. 15, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1318
GY-L1058 First period Jan-Jun 2017-Public Report.pdf
Published Feb. 15, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1999
GY-L1058 Second period Jan-Dec 2017-Public Report.pdf
Published Aug. 02, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-17414
GY-L1058 1055.pdf
Published Aug. 28, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31617
GY-L1058 First period Jan-Jun 2018-Public Report.pdf
Published Dec. 14, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-22922
GY-L1058 693.pdf
Published Jun. 19, 2019
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32308
GY-L1058 Second period Jan-Dec 2018-Public Report.pdf
Published Oct. 15, 2019
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-23207
GY-L1058 966.pdf
Published Aug. 20, 2019
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32946
GY-L1058 First period Jan-Jun 2019-Public Report.pdf
Published Feb. 12, 2020
Download
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-1190183301-28
Environmental and Social Analysis Report [40521863].PDF
Published Feb. 06, 2017
Download
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1190183301-11
Environmental and Social Analysis Report [40363139].PDF
Published Jun. 24, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1413765212-2
Support to Improve Maternal and Child Health [40285828].PDF
Published May. 18, 2016
Download

Have an Environmental or Social issue related to IDB projects? File a Complaint

Publications
Published 2024
Programa Maior Cuidado: An Integrated Community-Based Intervention on Care for Older People
This report presents an overview of a novel community-based intervention for older people living in deprived neighbourhoods in the Brazilian city of Belo Horizonte: Programa Maior Cuidado (PMC). Since 2011 PMC has been jointly run by the municipal Departments of Health and Social Assistance to support dependent older people living in vulnerable families. These families receive up to 20 hours of support a week from professional family care support workers. Health centres and social assistance posts hold joint monthly case reviews and work closely with family care support workers to anticipate and respond to new problems. Between 2011 and December 2022, 3,062 families had received support or were continuing to do so. Drawing on a set of qualitative and quantitative evaluations, we show that PMC operates effectively and appears to generate a range of positive effects. These effects include enhanced health and wellbeing of older people, reducing the stress and burden of family carers and improving the efficiency of outpatient and inpatient health service use. PMC also provides a valuable livelihood opportunity for the caregivers it employs. A cost analysis estimates that the monthly per capita cost of PMC in April 2023 was 916.2 reais (US$173), which is substantially less than alternative interventions. These positive evaluations have led Belo Horizonte municipality to extend the scheme and the Federal Ministry of Health to support similar pilots in new cities. Future evaluations of these pilot schemes will add to the available evidence about PMC and its potential suitability for other parts of Brazil and similar countries.
Publications
Published 2024
Nicaragua: generando impacto para mejorar vidas: resultados recientes en proyectos de acceso a salud y energia de poblaciones vulnerables financiados por el grupo BID
Las zonas más apartadas y vulnerables de Nicaragua han sido particularmente afectadas por la falta de acceso a servicios de salud y al suministro de energía eléctrica. Ambos son desafíos en los que se ha venido trabajando, con apoyo del Grupo BID, para ofrecer mejores condiciones de vida a las personas. Este documento recoge, de manera breve, algunos de los datos más destacados al respecto, desde la mejor cobertura en materia de atención médica y una importante reducción en las muertes materno-infantiles, hasta el aumento en la cobertura eléctrica a partir de fuentes renovables de energía.
Publications
Published 2024
BIDeconomics Panamá: panorama de oportunidades
Panamá es un referente de crecimiento para América Latina y el Caribe. Cerca de 6 por ciento ha sido el incremento promedio anual de su PIB entre 2000 y 2019. Incluso, pese a los desafíos postpandemia, el aumento promedio ha sido de 4 por ciento hasta 2023. Si bien este progreso ha acercado al país a los niveles de ingreso de economías más avanzadas, persisten retos significativos como los desequilibrios territoriales, el reducido espacio fiscal e insuficiencias en el gasto social, lo que ha conllevado a fuertes disparidades en el nivel de vida de la gente. En tal contexto, es esencial implementar una serie de medidas que reduzcan la desigualdad, faciliten la diversificación productiva y promuevan un manejo eficiente y sostenible de los recursos tanto financieros como naturales, especialmente el agua. Resulta clave apoyar a los sectores que han impulsado el crecimiento previo, a la vez que se eleva la calidad de vida de los panameños. Consolidarse como una economía de ingresos altos, de manera inclusiva y sostenible, es a la vez un reto inmenso y una oportunidad grandiosa. Este documento del Grupo BID, justamente, identifica oportunidades en tres pilares temáticos desarrollo humano, bases para la productividad y modernización institucional que pueden contribuir al cumplimiento definitivo de ese gran objetivo.
Powered by FindIT
Jump back to top