Skip to main content

Violence Prevention Strategy Comprehensive Support Program

To contribute to youth crime prevention by: (i) improving the coordination of prevention services by the MJSP at the national level; (ii) increasing social and workforce integration of youth at risk in the beneficiary municipios; and (iii) reducing juvenile recidivism.

Project Detail

Country

El Salvador

Project Number

ES-L1025

Approval Date

December 5, 2012

Project Status

Closed

Project Type

Loan Operation

Sector

SOCIAL INVESTMENT

Subsector

CITIZEN SAFETY

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 45,000,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 45,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
2881/OC-ES Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 2881/OC-ES
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Closed Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1623492451-6
Project Completion Report
Informe de Terminación del Proyecto (PCR). ES-L1025 - Programa de Apoyo Integral a la Estrategia de Prevencion de la Violencia.pdf
Aug. 23, 2022
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-1989814087-62
Electronic Links
ES-L1025. Enlace PCR - Cambios a la matriz de resultados.pdf
Aug. 23, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989814087-61
Electronic Links
ES-L1025. Enlace PCR - DEM.pdf
Aug. 23, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989814087-56
Electronic Links
ES-L1025. Enlace PCR - Analisis Economico ex post.pdf
Aug. 23, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989814087-58
Electronic Links
ES-L1025. Enlace PCR - Version Final de Reporte de Progreso del Monitoreo -PMR.xlsx
Aug. 23, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1989814087-59
Electronic Links
ES-L1025. Enlace PCR - Informe Final de la Evaluacion del Programa.pdf
Aug. 23, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989814087-60
Electronic Links
ES-L1025. Enlace PCR - Nota Tecnica. Seguridad Publica y Ciudadana asumida como un Pacto de Estado. 2009.pdf
Aug. 23, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-8271
Amendment
Contrato Modificatorio No. 1 - República de El Salvador.pdf
Aug. 10, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-620
Procurement
ES-L1025 [40824863].PDF
Jan. 27, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-621
Procurement
ES-L1025 [40824864].PDF
Jan. 27, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-617
Procurement
ES-L1025 [40820036].PDF
Jan. 23, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-618
Procurement
ES-L1025 [40820042].PDF
Jan. 23, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-619
Procurement
ES-L1025 [40820064].PDF
Jan. 23, 2017
Spanish
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35541
Project Monitoring Report ( Public version)
ES-L1025 First period Jan-Jun 2021 - Public Report.pdf
Feb. 20, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-507320163-195
Annual Project Audited Financial Statement
2881-OC-ES_ES-L1025-Estados Financieros Finales.pdf
Dec. 08, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34886
Project Monitoring Report ( Public version)
ES-L1025 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 20, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34196
Project Monitoring Report ( Public version)
ES-L1025 First period Jan-Jun 2020 - Public Report.pdf
Mar. 09, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33566
Project Monitoring Report ( Public version)
ES-L1025 Second period Jan-Dec 2019-Public Report.pdf
Aug. 24, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-507320163-122
Annual Project Audited Financial Statement
Auditoría Externa 2019.pdf
Dec. 09, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989814087-7
Project Monitoring Report ( Public version)
ES-L1025 First period Jan-Jun 2016-Public Report [40797398].PDF
Dec. 23, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-36
Specific Procurement Notices
ES-L1025 [40765468].PDF
Nov. 30, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-35
Specific Procurement Notices
ES-L1025 [40704311].PDF
Oct. 12, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-34
Specific Procurement Notices
ES-L1025 [40698045].PDF
Oct. 06, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-32
Specific Procurement Notices
ES-L1025 [40682083].PDF
Sep. 26, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-33
Specific Procurement Notices
ES-L1025 [40682099].PDF
Sep. 26, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-31
Specific Procurement Notices
ES-L1025 [40393325].PDF
Jul. 15, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989814087-6
Project Monitoring Report ( Public version)
ES-L1025 Second period Jan-Dec 2015-Public Report [40367539].PDF
Jun. 29, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1989814087-5
Project Monitoring Report ( Public version)
ES-L1025 First period Jan-Jun 2015-Public Report [40192711].PDF
Mar. 21, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989814087-4
Project Monitoring Report ( Public version)
ES-L1025 Segundo período enero-diciembre 2014-Public Report [40190358].PDF
Mar. 18, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989814087-2
Project Monitoring Report ( Public version)
ES-L1025 Segundo período enero-diciembre 2013-Public Report [40184501].PDF
Mar. 16, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989814087-3
Project Monitoring Report ( Public version)
ES-L1025 Primer período enero-junio 2014-Public Report [40185019].PDF
Mar. 17, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-29
Specific Procurement Notices
ES-L1025 [40142592].PDF
Feb. 29, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-30
Specific Procurement Notices
ES-L1025 [40142648].PDF
Feb. 29, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-28
Specific Procurement Notices
ES-L1025 [40110561].PDF
Feb. 09, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-27
Specific Procurement Notices
ES-L1025 [40085523].PDF
Jan. 25, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-26
Specific Procurement Notices
ES-L1025 [40084358].PDF
Jan. 22, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-25
Specific Procurement Notices
ES-L1025 [40044998].PDF
Dec. 31, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-24
Specific Procurement Notices
ES-L1025 [39979151].PDF
Nov. 20, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-23
General Procurement Notices
ES-L1025 [39935297].PDF
Oct. 30, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-721
Loan Contract
Contrato - Programa de Apoyo Integral a la Estrategia de Prevención de la Violencia [39646561].PDF
May. 26, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-19
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_ES-L1025-2013-1º-Período [38265417].PDF
Mar. 06, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-20
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_ES-L1025-2013-1º-Período [38266077].PDF
Mar. 06, 2014
French
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-21
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_ES-L1025-2013-1º-Periodo [38266743].PDF
Mar. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-22
Project Monitoring Report ( Public version)
Report for Publication_PMR-_ES-L1025-2013-1º-Period [38267417].PDF
Mar. 06, 2014
English
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-15
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_ES-L1025-2012-2º-Período [37873196].PDF
Jul. 27, 2013
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-16
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_ES-L1025-2012-2º-Período [37873863].PDF
Jul. 27, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-17
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_ES-L1025-2012-2º-Periodo [37874517].PDF
Jul. 27, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-18
Project Monitoring Report ( Public version)
Report for Publication_PMR-_ES-L1025-2012-2º-Period [37875314].PDF
Jul. 27, 2013
English
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-14
Loan Proposal
Programa de Apoyo Integral a la Estrategia de Prevención de la Violencia_ Salvaguardias [37324723].PDF
Dec. 20, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-12
Loan Proposal
Programa de Apoyo Integral a la Estrategia de Prevención de la Violencia_ Propuesta de Préstamo [37324687].PDF
Dec. 20, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-13
Loan Proposal
Violence Prevention Strategy Comprehensive Support Program_ Loan Proposal [37324718].PDF
Dec. 20, 2012
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-162
Project Monitoring Report ( Public version)
ES-L1025 Second period Jan-Dec 2016-Public Report.pdf
Feb. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1965
Project Monitoring Report ( Public version)
ES-L1025 Second period Jan-Dec 2017-Public Report.pdf
Aug. 02, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31585
Project Monitoring Report ( Public version)
ES-L1025 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32285
Project Monitoring Report ( Public version)
ES-L1025 Second period Jan-Dec 2018-Public Report.pdf
Oct. 17, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32924
Project Monitoring Report ( Public version)
ES-L1025 First period Jan-Jun 2019-Public Report.pdf
Feb. 13, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-23160
Specific Procurement Notices
ES-L1025 916.pdf
Jul. 29, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-816
Project Monitoring Report ( Public version)
ES-L1025 First period Jan-Jun 2017-Public Report.pdf
Feb. 14, 2018
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1989206796-11
Project Profile
Programa de Fortalecimiento del Ejercicio de la Acción Penal [36592142].PDF
Dec. 20, 2011
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top