Skip to main content
Program for the Reconstruction of Electricity Infrastructure in Areas Affected by the Earthquake in Ecuador
The overall objective is to improve electricity service by rebuilding electricity infrastructure in the
earthquake-affected provinces of Esmeraldas, Manabí, and Santo Domingo, incorporating earthquake-resistant features. The specific
objectives are as follows: (i) to help reestablish electricity supply in the subtransmission systems of electricity distribution companies
affected by the earthquake; and (ii) to facilitate the reliable supply of electricity service to end users by implementing distribution projects.

Project Detail

Country

Ecuador

Project Number

EC-L1219

Approval Date

January 25, 2017

Project Status

Implementation

Project Type

Loan Operation

Sector

ENERGY

Subsector

ENERGY SECTOR REHABILITATION AND EFFICIENCY

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

GOM (Global of Multiple Works Operation)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 69,234,000.00

Country Counterpart Financing

USD 9,234,000.00

Original Amount Approved

USD 60,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
3906/OC-EC Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 3906/OC-EC
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-44230
Project Monitoring Report ( Public version)
EC-L1219 First period Jan-Jun 2023 - Public Report.PDF
Jan. 26, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-43585
Project Monitoring Report ( Public version)
EC-L1219 Second period Jan-Dec 2022 - Public Report.PDF
Jul. 20, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-42296
Project Monitoring Report ( Public version)
EC-L1219 First period Jan-Jun 2022 - Public Report.PDF
Feb. 08, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-41055
Project Monitoring Report ( Public version)
EC-L1219 Second period Jan-Dec 2021 - Public Report.PDF
Aug. 12, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1360012368-257
Annual Project Audited Financial Statement
PRIZA - Informe financiero 2021.pdf
Sep. 09, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35425
Project Monitoring Report ( Public version)
EC-L1219 First period Jan-Jun 2021 - Public Report.pdf
Feb. 20, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34859
Project Monitoring Report ( Public version)
EC-L1219 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 20, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1360012368-116
Annual Project Audited Financial Statement
2021 EFAS 3906 OC-EC EF.pdf
May. 18, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34166
Project Monitoring Report ( Public version)
EC-L1219 First period Jan-Jun 2020 - Public Report.pdf
Mar. 09, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26630
Notice of Contract Award (SG)
EC-L1219_P620154_AW.pdf
Dec. 16, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33547
Project Monitoring Report ( Public version)
EC-L1219 Second period Jan-Dec 2019-Public Report.pdf
Aug. 24, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25961
Specific Procurement Notices
EC-L1219_9845_9_SP.pdf
Aug. 17, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25882
Specific Procurement Notices
EC-L1219_9845_8_SP.pdf
Jul. 30, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25727
Specific Procurement Notices
EC-L1219_9845_7_SP.pdf
Jun. 30, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1360012368-100
Annual Project Audited Financial Statement
3906-OC-EC PRIZA - EFAS 2019.pdf
Nov. 25, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-565228075-139
Loan Proposal
Programa de Reconstruccion de Infraestructura Electrica de las Zonas Afectadas por el Sismo en Ecuador [40804922].PDF
Jan. 04, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-565228075-140
Loan Proposal
Program for the Reconstruction of Electricity Infraestructure in Areas Affected by the Earthquake in Ecuador [40804923].PDF
Jan. 04, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-565228075-20
Loan Proposal
Plan de Evaluacion y Monitoreo EC-L1219 [40704080].docx
Jan. 04, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-565228075-23
Loan Proposal
Filtros de Política de Salvaguardias [40771183].PDF
Jan. 04, 2017
English
https://www.iadb.org/document.cfm?id=EZSHARE-565228075-21
Loan Proposal
LINK_ Reconocimiento Retroactivo de Gastos del Programa [40706960].docx
Jan. 04, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-565228075-19
Loan Proposal
ANÁLISIS ECONÓMICO FINANCIERO [40701874].DOCX
Jan. 04, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-565228075-16
Loan Proposal
PLAN DE EJECUCIÓN PLURIANUAL [40701665].PDF
Jan. 04, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-565228075-17
Loan Proposal
POA 2017 [40701696].PDF
Jan. 04, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-565228075-18
Loan Proposal
ESTUDIO DE ESTÁNDARES DE DISEÑO Y CONSTRUCCIÓN DE INFRAESTRUCTURA RESILIENTE [40701779].DOCX
Jan. 04, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-565228075-13
Loan Proposal
INFORME DE VIABILIDAD TÉCNICA [40696258].doc
Jan. 04, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-565228075-81
Loan Proposal
EC-L1219 Justificacion del Programa con la PSP GN-2716-6 [40696259].doc
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-565228075-11
Loan Proposal
Evaluacio´n-de-los-Costos-de-Reconstruccio´n-Resumen-Ejecutivo_pdf [40675004].PDF
Jan. 04, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25562
Specific Procurement Notices
EC-L1219_9845_5_SP.pdf
May. 28, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31577
Project Monitoring Report ( Public version)
EC-L1219 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25576
Specific Procurement Notices
EC-L1219_9845_6_SP.pdf
Jun. 02, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32273
Project Monitoring Report ( Public version)
EC-L1219 Second period Jan-Dec 2018-Public Report.pdf
Oct. 15, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32908
Project Monitoring Report ( Public version)
EC-L1219 First period Jan-Jun 2019-Public Report.pdf
Feb. 12, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1360012368-9
Annual Project Audited Financial Statement
3906-OC-EC Informe EFAs 2017.pdf
Sep. 18, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25184
Specific Procurement Notices
EC-L1219_P499845_SP.pdf
Mar. 02, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25297
Specific Procurement Notices
EC-L1219_9845_2_SP.pdf
Mar. 25, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25460
Specific Procurement Notices
EC-L1219_9845_3_SP.pdf
Apr. 29, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1331
Project Monitoring Report ( Public version)
EC-L1219 First period Jan-Jun 2017-Public Report.pdf
Feb. 15, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25543
Specific Procurement Notices
EC-L1219_9845_4_SP.pdf
May. 21, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1959
Project Monitoring Report ( Public version)
EC-L1219 Second period Jan-Dec 2017-Public Report.pdf
Aug. 17, 2018
English
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-394129275-49
LINK__Reconocimiento_Retroactivo_de_Gastos_del_Programa_[40706960]_docx.docx
Jan. 04, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-394129275-36
Plan_de_Evaluacion_y_Monitoreo_EC-L1219_[40704080]_docx.docx
Jan. 04, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-394129275-42
ANALISIS_AMBIENTAL_Y_SOCIAL_[40701398]_docx.docx
Jan. 04, 2017
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-565228075-22
Environmental Analyses
Anexos Análisis Ambiental y Social [40728878].PDF
Oct. 31, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-891399296-2
Project Profile
PP_ Perfil de Proyecto y Anexos [40680300].PDF
Oct. 13, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-565228075-12
Environmental Analyses
Análisis Ambiental y Social EC-L1219 [40691550].docx
Oct. 05, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-562134839-10907
Environmental and Social Execution
EC-L1219 PRIZA Levantamiento GEOL-GEOT-KM11-VIA JAMA.pdf
May. 15, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-562134839-10908
Environmental and Social Execution
Estudio Técnico Completo con Desenergización Junio 2019.pdf
Jun. 10, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-562134839-10909
Environmental and Social Execution
Estudios Técnicos sin Desenergización Julio 2019.pdf
Jun. 11, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-562134839-10903
Environmental and Social Execution
EC-L1219 Priza Términos de Referencia EIAS --- Línea San Vicente - Jama.pdf
Jun. 25, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-562134839-10904
Environmental Impact Assessments
EIAS LineaSubTransmisión - San Vicente Jama 05Sep2018.pdf
Sep. 24, 2018
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top