Skip to main content

Support for the Strategy of Strengthening Mass Public Transport of People by Bus

The purpose of this TC is to accompany and support the Ministry of Public Works and Transport (MOPT), in the technical preparation and implementation of: i) the strategy and action plan to face the impact of COVID 19 on public transport and infrastructure works in search of job creation in the sector, ii) technical support for the implementation of the public transport electrification project, bus modality, iii) the project of intelligent transport systems for passengers, such as the electronic payment system.

Project Detail

Country

Costa Rica

Project Number

CR-T1224

Approval Date

July 21, 2020

Project Status

Closed

Project Type

Technical Cooperation

Sector

TRANSPORT

Subsector

PUBLIC TRANSPORT (BUS / TRAIN / CABLE). INFRASTRUCTURE AND EQUIPMENT

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 450,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 450,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/AC-18126-CR Sovereign Guaranteed USD - United States Dollar NDC Pipeline Accelerator Multidonor Fund Nonreimbursable
ATN/OC-18125-CR Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/AC-18126-CR
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: NDC Pipeline Accelerator Multidonor Fund
  • Financial Instrument: Nonreimbursable
Operation Number ATN/OC-18125-CR
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-967353026-35
BEO Procurement
00. Solicitud Expresiones de Interes CR-T1224 P003 Pago Electronico.pdf
Nov. 29, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1828485441-22
TC Document
Documento de CT - Divulgación.pdf
Jul. 24, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1828485441-18
TC Document
Matriz de Resultados.pdf
Jul. 24, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1828485441-19
TC Document
Términos de Referencia_94819.pdf
Jul. 24, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1828485441-20
TC Document
Plan de Adquisiciones_CR-T1224.pdf
Jul. 24, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1828485441-17
TC Document
Solicitud del Cliente.pdf
Jul. 24, 2020
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1828485441-23
TC Abstract
CR-T1224 TC Abstract.pdf
Aug. 21, 2020
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top