Hydroelectric Power Plant Porce II
HYDROELECTRIC PROJECT FORMS PART OF THE ELECTRIC POWER GENERATION PLAN THAT WILL ADD 392 MW AND AN ANNUAL AVERAGE PRODUCTION OF 1.980 GWH. PROJECT COMPONENTS ARE: 1) A WATER DAMM OF 118M. HIGH 2) UNDERGROUND POWER PLANT TO HOUSE 3 GENERATORS AND CORRESPONDING TRANSFORMERS; 3) INFRASTRUCTURE AND COMPLEMENTARY WORKS.

Project Detail

Country

Colombia

Project Number

CO0221

Approval Date

December 1, 1993

Project Status

Closed

Project Type

Loan Operation

Sector

ENERGY

Subsector

RURAL ELECTRIFICATION

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental Classification

-

Total Cost

USD 563,090,000.00

Country Counterpart Financing

USD 235,090,000.00

Original Amount Approved

USD 328,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
792/OC-CO Sovereign Guaranteed USD - United States Dollar Ordinary Capital Single Currency Facility
Operation Number 792/OC-CO
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Single Currency Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1171455216-132
Diseño, Fabr_, Suministro, Pruebas, Ensamble en Fabrica para las Válvulas de Adm [35236354].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1171455216-8843
Porce II Hydroelectric Power Plant Project [446070].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1171455216-8844
Central hidroeléctrica Porce II [446072].PDF
Published Dec. 31, 1999
Download
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-1171455216-11600
EC ED W 95003_19 [406312].JPG
Published Dec. 31, 1999
Download

Have an Environmental or Social issue related to IDB projects? File a Complaint

Blogs
Published 2023
El BID coorganiza en Salto Grande el foro internacional “Desafíos y Estrategias para la Renovación de Centrales Hidroeléctricas” junto a la represa de Salto Grande
El próximo 14 y 15 de septiembre, centrales hidroeléctricas de la región, empresas y organismos internacionales participarán de las jornadas del foro internacional “Desafíos y Estrategias para la Renovación de Centrales hidroeléctricas” en las instalaciones del Complejo Hidroeléctrico binacional Salto Grande. El objetivo del evento es itercambiar experiencias sobre los desafíos encontrados por los responsables
Blogs
Published 2022
Centrales hidroeléctricas reversibles: Un gigante dormido en Latinoamérica
. El Banco Interamericano de Desarrollo (BID), a través de su División de Energía, encargó el desarrollo de un estudio sobre centrales hidroeléctricas reversibles, con el objetivo de evaluar e identificar áreas de oportunidad para promover la inversión en esta tecnología en toda la región, y analizar el marco regulatorio en seis países con potencial de implementación de esta tecnología.
Blogs
Published 2020
Modernización de hidroeléctricas: ¿una oportunidad en la crisis COVID-19?
En 2019 la capacidad instalada hidroeléctrica alcanzó 1,308 GW a nivel mundial (17% de la capacidad total). Ese año se generaron 4,305 TWh, suficiente energía eléctrica para abastecer la demanda mundial por más de dos meses. Con esta participación, la energía hidráulica continúa siendo la mayor fuente de energía renovable. En nuestra región la hidroelectricidad
Blogs
Published 2019
El Proyecto hidroeléctrico más grande de Centroamérica, financiado por el grupo BID, galardonado con el Blue Planet Award
El Proyecto Hidroeléctrico Reventazón (Reventazón) es una de las infraestructuras más grandes y complejas construidas hasta la fecha en Centroamérica (es el proyecto de energía hidroeléctrica más grande de la región). Reventazón fue desarrollado por el Instituto Costarricense de Electricidad (ICE), principal empresa eléctrica de Costa Rica, y entró en pleno funcionamiento en septiembre de
Publications
Published 2022
First Regional Policy Dialogue on Cultural and Creative Industries with an Intersectoral Approach: The role of the cultural and creative industries in the economic reactivation of Latin America and the Caribbean
This document contains a report on the "First Regional Policy Dialogue" on cultural and creative industries with an inter-sectoral approach, with the aim of bringing together and sharing experiences and best practices from the public and private sectors. This first dialogue focused mainly on four lines of action: Urban and local development strategies through culture and creativity; Actions to strengthen the competitiveness of the creative sector through digitization; Opportunities for independent workers in the creative sectors; Financial mechanisms to promote the creative economy.
Blogs
Published 2020
Colombia prepara la ruta para el futuro del sector energético
Colombia busca asegurar un futuro energético seguro, sostenible, asequible y confiable. Es por eso que, a finales de enero pasado, se llevó a cabo la presentación del informe de la Misión de Transformación Energética: construyendo la hoja de ruta para la energía del futuro, que consolida propuestas planteadas por expertos nacionales e internacionales. La Misión
Publications
Published 2021
Se buscan empleos de calidad: políticas activas y pasivas de empleo en Colombia. Informe para la Misión de Empleo
Colombia sobresale a nivel internacional por sus grandes dificultades para generar empleos de calidad. Mitigar los riesgos asociados a la pérdida de empleo, a los que tantos ciudadanos están expuestos, difícilmente se puede hacer sin apoyo del Gobierno. En este documento se analiza la oferta en Colombia de dos tipos de políticas públicas: las políticas activas y pasivas. Se muestra que, a pesar de los esfuerzos que ha hecho Colombia para articular las políticas activas y pasivas alrededor de un sistema integrado y de los recursos que ha invertido, la oferta está fragmentada en programas sin una visión unificada y con resultados débiles en muchas dimensiones. La mayor parte de los trabajadores colombianos recibe una baja o nula protección durante los periodos de desempleo o cesantía. Se trata de un problema estructural y antiguo cuyas consecuencias saltaron a la vista de manera dramática ante la crisis que desencadenó la pandemia. Fortalecer las políticas activas y pasivas requiere de consensos políticos importantes, cambios regulatorios e inversiones para el fortalecimiento institucional. El documento presenta una serie de lineamientos de reforma, para mejorar el diseño e implementación de las políticas activas y pasivas y fortalecer la institucionalidad en la que operan. También se discute su complementariedad con la política social y la regulación laboral. Este documento fue escrito en el marco de la Misión de Empleo que convocó el Gobierno de Colombia en el año 2020.
Blogs
Published 2021
O caso de Maripá (PR): Sustentabilidade em primeiro lugar com geração de energia solar
Maior produtor de orquídeas e quinto maior criador de tilápias do Paraná, o município de Maripá, distante 577 quilômetros de Curitiba, investiu em geração de energia solar fotovoltaica para reduzir as despesas com a conta de eletricidade e aprovou o resultado. A Prefeitura instalou uma primeira micro usina para suprir a sua sede e agora
Blogs
Published 2022
Empowering Electricity Consumers through Demand Response: Why and How?
The energy transition challenge requires everybody’s involvement and action. Demand Response (DR), a key mechanism for promoting individual action and increasing system efficiency, enhances sustainability through better use of resources, reduces the electricity supply cost and, potentially, increases affordability. Through financial incentives, demand-side programs encourage consumer response and stimulate changes in their electricity consumption. Incentives
Blogs
Published 2023
Empresas digitales del futuro: nuevas fronteras en servicios compartidos de energía y telecomunicaciones
¿Te has preguntado alguna vez cómo se podrían combinar la energía eléctrica y las telecomunicaciones para mejorar la infraestructura en América Latina y el Caribe (ALC)? Ciertamente existe mucha sinergia en varios países de la región para ambos sectores. Por ello, el próximo 19 de abril a las 14:00 (ET) el BID, en colaboración con
Powered by FindIT
Jump back to top