Skip to main content

Support to a Drinking Water Treatment Pilot Project in the South of La Guajira

The objective of this technical cooperation (TC) is to optimize the water system, provide support for the installation of a water treatment module with Korean technology and ensure the sustainability of the service in the rural communities of San Juan del Cesar in La Guajira department.

Project Detail

Country

Colombia

Project Number

CO-T1623

Approval Date

July 30, 2021

Project Status

Implementation

Project Type

Technical Cooperation

Sector

WATER AND SANITATION

Subsector

WATER SUPPLY RURAL AND PERI-URBAN

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

Likely to cause minimal or no negative environmental and associated social impacts

Total Cost

USD 750,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 750,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/KP-18725-CO Sovereign Guaranteed USD - United States Dollar Korea Poverty Reduction Fund Nonreimbursable
Operation Number ATN/KP-18725-CO
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Korea Poverty Reduction Fund
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-9088
Technical Cooperation Agreement
Convenio Modificatorio No.1 - Proyecto Piloto de Tratamiento de Agua Potable en el Sur de la Guajira.pdf
Oct. 03, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-8908
Loan Contract
Convenio - Apoyo a Proyecto Piloto de Tratamiento de Agua Potable en el Sur de La Guajira.pdf
May. 12, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-555387014-30
TC Document
CO-T1623 Documento de CT.pdf
Aug. 17, 2021
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-555387014-29
Electronic Links
CO-T1623 Plan de Adquisiciones.pdf
Aug. 17, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-555387014-28
Electronic Links
CO-T1623 Terminos de Referencia.pdf
Aug. 17, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-555387014-27
Electronic Links
CO-T1623 Matriz de Resultados.pdf
Aug. 17, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-555387014-26
Electronic Links
CO-T1623 Solicitud del Cliente.pdf
Aug. 17, 2021
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-555387014-25
TC Abstract
CO-T1623 Abstracto de CT.pdf
Aug. 16, 2021
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top