Medellin River Sanitation Program - Phase II
Purpose of the program: i) Improve the quality of fluvial waters of the river basin of the Medellín river; ii) Strengthening the institutional development of the company; with the following objectives: a) to use waters of the river for irrigation, recreation, fisheries and industrial uses; b) to diminish skin and intestinal diseases related to the water's contamination; iii) to diminish the odor problems in the areas near the river; and c) to consolidate the efficiency and sustainability of the company in the long term

Project Detail

Country

Colombia

Project Number

CO-L1034

Approval Date

February 25, 2009

Project Status

Closed

Project Type

Loan Operation

Sector

WATER AND SANITATION

Subsector

WATER AND SANITATION

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 581,500,000.00

Country Counterpart Financing

USD 131,500,000.00

Original Amount Approved

USD 450,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
2120/OC-CO Sovereign Guaranteed USD - United States Dollar Ordinary Capital Single Currency Facility
Operation Number 2120/OC-CO
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Single Currency Facility

Can’t find a document? Request information

Closed Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-59
PCR CO-L1034_final oct2020 a publicación revisado.pdf
Published Oct. 07, 2020
Download
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-46
PCR CO-L1034 EE3 PMR Final Ene-Dic 2019 final 3jul.xlsx
Published Oct. 06, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-39
PCR CO-L1034 EE7 Indicadores de producto.docx
Published Oct. 07, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-38
PCR CO-L1034 EE2 Cambio Matriz.docx
Published Oct. 07, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-37
PCR CO-L1034 EE8 PMR Final Ene-Dic 2010 Start-up Plan.xlsx
Published Oct. 07, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-33
PCR CO-L1034 EE1 DEM.pdf
Published Oct. 07, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-32
PCR CO-L1034 Diálogo competitivo.pdf
Published Oct. 07, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-28
CO-L1034 Contrato modificatorio No 1.PDF
Published Oct. 07, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-29
CO-L1034 Contrato modificatorio No 2.PDF
Published Oct. 07, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-30
CO-L1034 Contrato modificatorio No 3.PDF
Published Oct. 07, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-876518709-3300
Ayuda_Memoria_Diciembre-2018.pdf
Published Oct. 07, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1860206681-18
CO-L1034_HighRisk_20181001_1802.pdf
Published Oct. 07, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-69
Dictamen auditor independiente control interno [40371184].PDF
Published Aug. 09, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-67
CONVENIO No_ 006-2012 - Consorcio Aguas de Aburra HHA - COB0747 [40370273].PDF
Published Jun. 29, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-65
Ayuda de memoria Misión Supervisión BID agosto 14 y 15 de 2013 [38016414].PDF
Published Sep. 11, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-992087496-862
Methodology for Measuring the Fiscal Effect of Regional Expenditures in Colombia [35424052].PDF
Published Dec. 31, 1999
Download
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-917194115-2
Dictamen a los EFAs [40315556].PDF
Published Oct. 05, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-7
CO-L1034 First period Jan-Jun 2016-Public Report [40801256].PDF
Published Dec. 28, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-6
CO-L1034 Second period Jan-Dec 2015-Public Report [40363491].PDF
Published Jun. 24, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-49
Enlace Requerido 1 - Informe_de_Gestión_Ambiental_y_Social__IGAS (3) [40253025].PDF
Published Apr. 22, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-39079
Programa de Saneamiento del Río Medellín - Fase II [40252457].PDF
Published Apr. 25, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-39080
Medellín River Sanitation Program – Phase II” [40252458].PDF
Published Apr. 25, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-5
CO-L1034 First period Jan-Jun 2015-Public Report [40211797].PDF
Published Mar. 29, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-4
CO-L1034 Second period Jan-Dec 2014-Public Report [40209246].PDF
Published Mar. 28, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-3
CO-L1034 First period Jan-Jun 2014-Public Report [40193493].PDF
Published Mar. 21, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-2
CO-L1034 Second period Jan-Dec 2013-Public Report [40170818].PDF
Published Mar. 10, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-68
Notas de los EEFF 2015 - junio 2016 [40371183].PDF
Published Aug. 09, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-70
Dictamen auditor independiente sobre EF [40371185].PDF
Published Aug. 09, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-47
Enlace 1 - Plan de Adquisiciones [40045608].doc
Published Apr. 22, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-45
Enlace 6 - Condiciones solicitud de oferta no vinculante [40036262].PDF
Published Apr. 22, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-46
Enlace 2 - Solicitud de financiación [40036268].PDF
Published Apr. 22, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-41
Enlace 1 - Anexo Técnico [40036105].docx
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-42
Enlace 3 - Estudio de factibilidad tratamiento de biosólidos [40036251].PDF
Published Apr. 22, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-43
Enlace 4 - Informe diseño preliminar secado término de biosólidos [40036255].PDF
Published Apr. 22, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-44
Enlace 5 - Análisis del Proceso Licitatorio [40036259].PDF
Published Apr. 22, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-66
Plan de Adquisiciones actualizado Dic-2015 [40005111].PDF
Published Dec. 09, 2015
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-48
Enlace 8 - Ayuda Memoria Misión Supervisión BID febrero 23 y 24 de 2015 [40200830].PDF
Published Apr. 22, 2016
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-38
Rapport pour Publication_PMR-_CO-L1034-2013-1º-Período [38265989].PDF
Published Mar. 06, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-39
Informe para Publicación_PMR-_CO-L1034-2013-1º-Periodo [38266647].PDF
Published Mar. 06, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-40
Report for Publication_PMR-_CO-L1034-2013-1º-Period [38267323].PDF
Published Mar. 06, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-37
Relatório para publicação_PMR-_CO-L1034-2013-1º-Período [38265329].PDF
Published Mar. 06, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-2244
Contrato Modificatorio No_ 2 - Programa de Saneamiento del Río Medellín - Segunda Etapa [38584836].PDF
Published Feb. 10, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-64
Plan de Adquisiciones [38014973].PDF
Published Sep. 11, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-63
Plan de Adquisiciones Julio 23 de 2013 [37924257].PDF
Published Jul. 24, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-33
Relatório para publicação_PMR-_CO-L1034-2012-2º-Período [37873113].PDF
Published Jul. 27, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-34
Rapport pour Publication_PMR-_CO-L1034-2012-2º-Período [37873782].PDF
Published Jul. 27, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-35
Informe para Publicación_PMR-_CO-L1034-2012-2º-Periodo [37874436].PDF
Published Jul. 27, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-36
Report for Publication_PMR-_CO-L1034-2012-2º-Period [37875213].PDF
Published Jul. 27, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-29
Relatório para publicação_PMR-_CO-L1034-2012-1º-Período [37352002].PDF
Published Dec. 19, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-30
Rapport pour Publication_PMR-_CO-L1034-2012-1º-Período [37352651].PDF
Published Dec. 19, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-31
Informe para Publicación_PMR-_CO-L1034-2012-1º-Periodo [37353320].PDF
Published Jan. 21, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-32
Report for Publication_PMR-_CO-L1034-2012-1º-Period [37353980].PDF
Published Jan. 21, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-28
Report for Publication_PMR-_CO-L1034-2011-2º-Period [36927132].PDF
Published Nov. 28, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-25
Relatório para publicação_PMR-_CO-L1034-2011-2º-Período [36915615].PDF
Published Nov. 28, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-26
Rapport pour Publication_PMR-_CO-L1034-2011-2º-Período [36921903].PDF
Published Nov. 28, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-27
Informe para Publicación_PMR-_CO-L1034-2011-2º-Periodo [36924486].PDF
Published Nov. 28, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-21
Relatório para publicação_PMR-_CO-L1034-2011-1º-Período [36623905].PDF
Published Jan. 12, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-22
Rapport pour Publication_PMR-_CO-L1034-2011-1º-Período [36624492].PDF
Published Jan. 12, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-23
Informe para Publicación_PMR-_CO-L1034-2011-1º-Periodo [36625046].PDF
Published Jan. 12, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-24
Report for Publication_PMR-_CO-L1034-2011-1º-Period [36625609].PDF
Published Jan. 12, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-17
Relatório para publicação_PMR-_CO-L1034-2010-2º-Período [36310147].PDF
Published Aug. 10, 2011
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-18
Rapport pour Publication_PMR-_CO-L1034-2010-2º-Período [36312040].PDF
Published Aug. 10, 2011
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-19
Informe para Publicación_PMR-_CO-L1034-2010-2º-Periodo [36312627].PDF
Published Aug. 10, 2011
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-20
Report for Publication_PMR-_CO-L1034-2010-2º-Period [36313199].PDF
Published Aug. 10, 2011
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-16
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES BELLO Water supply and sewerage [35599257].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-62
Plan de Adquisiciones Aprobado_ Formato SEPA_ 19JUL10_ [11149960].XLS
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-15
Diseño detallado y construcción del Interceptor Norte del río Medellín y obra [35248240].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-2245
Contrato Modificatorio No_ 1 - Programa de Saneamiento del Rio Medellin - Segunda Etapa [38585376].PDF
Published Feb. 10, 2014
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-39077
Propuesta de Préstamo [1895010].PDF
Published Dec. 31, 1899
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-39078
Loan Proposal [1895012].PDF
Published Dec. 31, 1899
Download
https://www.iadb.org/document.cfm?id=EZSHARE-917194115-4920
Estados Financieros definitivos 2018.pdf
Published Feb. 21, 2019
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-5087
Contrato Modificatorio No. 3 - Programa de Saneamiento del Río Medellín - Segunda Etapa.pdf
Published May. 02, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-917194115-4921
Notas Informes financieros año 2018 definitivo.pdf
Published Feb. 21, 2019
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-6503
Contrato Garantia - Proyecto de Saneamiento del Río Medellín - Segunda Etapa [1711287].pdf
Published Aug. 16, 2019
Download
https://www.iadb.org/document.cfm?id=EZSHARE-917194115-4923
Informe Auditor EEFF 2018.pdf
Published Feb. 21, 2019
Download
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-6504
Contrato - Proyecto de Saneamiento del Río Medellín - Segunda Etapa [1711285].pdf
Published Aug. 16, 2019
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-136
CO-L1034 Second period Jan-Dec 2016-Public Report.pdf
Published Feb. 14, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1854
CO-L1034 Second period Jan-Dec 2017-Public Report.pdf
Published Aug. 02, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31474
CO-L1034 First period Jan-Jun 2018-Public Report.pdf
Published Dec. 14, 2018
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32194
CO-L1034 Second period Jan-Dec 2018-Public Report.pdf
Published Oct. 15, 2019
Download
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-790
CO-L1034 First period Jan-Jun 2017-Public Report.pdf
Published Feb. 14, 2018
Download
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-56
Capítulo 3 - Caracterización del área de estudio del proyecto [1624914].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-57
Capitulo 5 - Zonificación Ambiental [1624920].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-58
Capitulo 6 - Plan de Manejo Ambiental [1624924].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-55
Capítulo 1 - Generalidades [1624910].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1860206681-2
Perfil de Proyecto aprobado PIC [1405124].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-61
Tabla Links EIA [1626677].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-59
Capitulo 7 - Plan de monitoreo y seguimiento [1624932].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-60
Resumen Ejecutivo [1624935].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-11
Anexo 3_2 Caracterización del área de estudio del interceptor norte [1319680].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-12
Capítulo 2_ Descripción de las obras del programa de saneamiento del río Medellín - segunda etapa [1319682].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-13
Anexo 3_1 Caracterización del área de estudio de la planta de tratamiento de aguas residuales Bello [1319683].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-52
Capítulo 4_ Identificación y evaluación de impacto [1319678].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-14
Capítulo 9_ Diagnóstico ambiental-técnico-económico [1319691].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-53
Capítulo 8_ Análisis de riesgo y plan de contingencia [1319689].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-54
Información general sobre el proyecto [1319692].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-50
Programa de Saneamiento del Río Medellín - Segunda Etapa [1074575].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-51
Medellin River Sanitation Program - Fase II [1076034].PDF
Published Dec. 31, 1999
Download

Have an Environmental or Social issue related to IDB projects? File a Complaint

Blogs
Published 2024
¿Tienes sed de soluciones innovadoras? La inteligencia artificial transforma el sector de agua y el saneamiento
Escrito por Alejandro Minatta y Marcello Basani La inteligencia artificial (IA) está revolucionando el sector de agua, saneamiento y residuos sólidos (AyS) en América Latina y el Caribe (ALC). En este blog presentamos sus principales conceptos, sus beneficios y una guía para implementar la IA para los prestadores de servicios de AyS. ¿Qué es? Si
Blogs
Published 2023
El diálogo como motor de la transformación
Del 26 al 28 de septiembre, Washington D.C. fue sede de la Semana de Conocimiento sobre Agua, Saneamiento y Residuos, organizada por el Banco Interamericano de Desarrollo (BID). Reunió a representantes del banco, gobiernos y empresas de agua y saneamiento, para compartir experiencias y abordar desafíos regionales Cumplir con el Objetivos de Desarrollo Sostenible (ODS)
Blogs
Published 2022
Saneamiento óptimo: la apuesta para el acceso universal a agua y saneamiento
Por: Andrea Ortega En el mundo todavía hay 360.000 millones de personas sin acceso a saneamiento seguro y para alcanzar todas las metas de saneamiento en 2030 se necesita una inversión de US$23 billones. En el Día Mundial del Saneamiento, destacamos cómo la iniciativa de saneamiento óptimo puede entregar una solución integral para América Latina
Blogs
Published 2024
Impulsando el saneamiento sostenible en América Latina
Escrito por María Fernanda Delfino Acelerar las soluciones de negocio es una gran parte de la solución para afrontar la crisis del saneamiento. Según la Organización Mundial de la Salud (OMS) y el Fondo de las Naciones Unidas para la Infancia (UNICEF), 3.500 millones de personas en el mundo carecen de saneamiento seguro, por lo
Blogs
Published 2023
Ideas en Acción 2023 apoya con innovación a operadoras de agua, saneamiento y/o energía
Millones de personas de América Latina y el Caribe carecen de acceso al agua potable, saneamiento seguro y servicios de energía, esenciales para el desarrollo humano y el bienestar de la comunidad. Son muchas las personas que enfrentan desafíos significativos en términos de acceso a servicios básicos, como el agua potable y saneamiento, lo que
Blogs
Published 2023
Ideas en Acción por la innovación: Intercambio de aprendizajes entre operadores de agua de la región
Xoán Fernández, Coordinador de Operaciones y Estratégico de Fuente de Innovación Desde hace años, el premio Ideas en Acción reconoce a las empresas de servicios de agua, saneamiento y residuos con las iniciativas más innovadoras, aquellas que cambian la forma de entender los servicios en América Latina y el Caribe. Los finalistas de la edición
Blogs
Published 2023
Acelerar el cambio impulsando la economía del saneamiento
En el Día Mundial del Retrete te presentamos una de las claves para acelerar el cambio y garantizar el saneamiento universal: impulsar la economía del saneamiento Un retrete y un colibrí podrían no tener mucho en común. Sin embargo, ambos son muy poderosos pese a ser pequeños y tienen el potencial de impactar a todo
Blogs
Published 2023
Una Revolución Azul para Servicios Inclusivos de Agua y Saneamiento: Transformando Vidas en América Latina y el Caribe
Mientras el mundo se enfrenta a numerosas crisis ambientales y sociales, el acceso a agua para todos sigue representando un desafío silencioso pero extremadamente presente en todo el mundo.. El acceso a agua limpia, saneamiento e higiene (ASH) es crucial para la reducción de la pobreza, la igualdad y la salud. Garantizar el acceso universal
Blogs
Published 2023
Premio BID-FEMSA: Innovación y emprendimiento en busca de soluciones para el saneamiento
Por María Augusta Olmedo Velasco* El Premio BID-FEMSA es uno de los reconocimientos más importantes en América Latina y el Caribe en el sector de agua y saneamiento. Organizado por el Banco Interamericano de Desarrollo (BID), en alianza con Fundación FEMSA, este premio impulsa la innovación y el emprendimiento en busca de soluciones a los
Blogs
Published 2023
Uruguay: Innovaciones en Agua, Saneamiento y Residuos Sólidos
“Cuando me conecté al saneamiento, me sentí integrada”, nos dijo Shirley, residente del Cerro en Montevideo. Como muchos, ella anhela un futuro mejor para su única hija —la primera en la familia en acceder a educación terciaria— y para sus futuros nietos. La historia de Shirley refleja la experiencia de muchas personas cuyas vidas se
Powered by FindIT
Jump back to top