Skip to main content

Medellin River Sanitation Program - Phase II

Purpose of the program: i) Improve the quality of fluvial waters of the river basin of the Medellín river; ii) Strengthening the institutional development of the company; with the following objectives: a) to use waters of the river for irrigation, recreation, fisheries and industrial uses; b) to diminish skin and intestinal diseases related to the water's contamination; iii) to diminish the odor problems in the areas near the river; and c) to consolidate the efficiency and sustainability of the company in the long term

Project Detail

Country

Colombia

Project Number

CO-L1034

Approval Date

February 25, 2009

Project Status

Closed

Project Type

Loan Operation

Sector

WATER AND SANITATION

Subsector

WATER AND SANITATION

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 581,500,000.00

Country Counterpart Financing

USD 131,500,000.00

Original Amount Approved

USD 450,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
2120/OC-CO Sovereign Guaranteed USD - United States Dollar Ordinary Capital Single Currency Facility
Operation Number 2120/OC-CO
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Single Currency Facility

Can’t find a document? Request information

Closed Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-59
Project Completion Report
PCR CO-L1034_final oct2020 a publicación revisado.pdf
Oct. 07, 2020
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-46
Electronic Links
PCR CO-L1034 EE3 PMR Final Ene-Dic 2019 final 3jul.xlsx
Oct. 06, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-39
Electronic Links
PCR CO-L1034 EE7 Indicadores de producto.docx
Oct. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-38
Electronic Links
PCR CO-L1034 EE2 Cambio Matriz.docx
Oct. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-37
Electronic Links
PCR CO-L1034 EE8 PMR Final Ene-Dic 2010 Start-up Plan.xlsx
Oct. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-33
Electronic Links
PCR CO-L1034 EE1 DEM.pdf
Oct. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-32
Electronic Links
PCR CO-L1034 Diálogo competitivo.pdf
Oct. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-28
Electronic Links
CO-L1034 Contrato modificatorio No 1.PDF
Oct. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-29
Electronic Links
CO-L1034 Contrato modificatorio No 2.PDF
Oct. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-30
Electronic Links
CO-L1034 Contrato modificatorio No 3.PDF
Oct. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-876518709-3300
Electronic Links
Ayuda_Memoria_Diciembre-2018.pdf
Oct. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1860206681-18
Electronic Links
CO-L1034_HighRisk_20181001_1802.pdf
Oct. 07, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-69
Financial Statements
Dictamen auditor independiente control interno [40371184].PDF
Aug. 09, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-67
PRM - Bidding Contract
CONVENIO No_ 006-2012 - Consorcio Aguas de Aburra HHA - COB0747 [40370273].PDF
Jun. 29, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-65
Mission for Operational Program Update
Ayuda de memoria Misión Supervisión BID agosto 14 y 15 de 2013 [38016414].PDF
Sep. 11, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-992087496-862
Discussion Papers
Methodology for Measuring the Fiscal Effect of Regional Expenditures in Colombia [35424052].PDF
Dec. 31, 1999
English
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-917194115-2
Annual Project Audited Financial Statement
Dictamen a los EFAs [40315556].PDF
Oct. 05, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-7
Project Monitoring Report ( Public version)
CO-L1034 First period Jan-Jun 2016-Public Report [40801256].PDF
Dec. 28, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-6
Project Monitoring Report ( Public version)
CO-L1034 Second period Jan-Dec 2015-Public Report [40363491].PDF
Jun. 24, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-49
Loan Proposal
Enlace Requerido 1 - Informe_de_Gestión_Ambiental_y_Social__IGAS (3) [40253025].PDF
Apr. 22, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-39079
Loan Proposal
Programa de Saneamiento del Río Medellín - Fase II [40252457].PDF
Apr. 25, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-39080
Loan Proposal
Medellín River Sanitation Program – Phase II” [40252458].PDF
Apr. 25, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-5
Project Monitoring Report ( Public version)
CO-L1034 First period Jan-Jun 2015-Public Report [40211797].PDF
Mar. 29, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-4
Project Monitoring Report ( Public version)
CO-L1034 Second period Jan-Dec 2014-Public Report [40209246].PDF
Mar. 28, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-3
Project Monitoring Report ( Public version)
CO-L1034 First period Jan-Jun 2014-Public Report [40193493].PDF
Mar. 21, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1994047892-2
Project Monitoring Report ( Public version)
CO-L1034 Second period Jan-Dec 2013-Public Report [40170818].PDF
Mar. 10, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-70
Annual Project Audited Financial Statement
Dictamen auditor independiente sobre EF [40371185].PDF
Aug. 09, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-68
Annual Project Audited Financial Statement
Notas de los EEFF 2015 - junio 2016 [40371183].PDF
Aug. 09, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-47
Loan Proposal
Enlace 1 - Plan de Adquisiciones [40045608].doc
Apr. 22, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-41
Loan Proposal
Enlace 1 - Anexo Técnico [40036105].docx
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-42
Loan Proposal
Enlace 3 - Estudio de factibilidad tratamiento de biosólidos [40036251].PDF
Apr. 22, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-43
Loan Proposal
Enlace 4 - Informe diseño preliminar secado término de biosólidos [40036255].PDF
Apr. 22, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-44
Loan Proposal
Enlace 5 - Análisis del Proceso Licitatorio [40036259].PDF
Apr. 22, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-45
Loan Proposal
Enlace 6 - Condiciones solicitud de oferta no vinculante [40036262].PDF
Apr. 22, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-46
Loan Proposal
Enlace 2 - Solicitud de financiación [40036268].PDF
Apr. 22, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-66
Procurement Plan
Plan de Adquisiciones actualizado Dic-2015 [40005111].PDF
Dec. 09, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-48
Loan Proposal
Enlace 8 - Ayuda Memoria Misión Supervisión BID febrero 23 y 24 de 2015 [40200830].PDF
Apr. 22, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-40
Project Monitoring Report ( Public version)
Report for Publication_PMR-_CO-L1034-2013-1º-Period [38267323].PDF
Mar. 06, 2014
English
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-37
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_CO-L1034-2013-1º-Período [38265329].PDF
Mar. 06, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-38
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_CO-L1034-2013-1º-Período [38265989].PDF
Mar. 06, 2014
French
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-39
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_CO-L1034-2013-1º-Periodo [38266647].PDF
Mar. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-2244
Loan Contract
Contrato Modificatorio No_ 2 - Programa de Saneamiento del Río Medellín - Segunda Etapa [38584836].PDF
Feb. 10, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-64
Procurement Plan
Plan de Adquisiciones [38014973].PDF
Sep. 11, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-63
Procurement Plan
Plan de Adquisiciones Julio 23 de 2013 [37924257].PDF
Jul. 24, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-33
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_CO-L1034-2012-2º-Período [37873113].PDF
Jul. 27, 2013
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-34
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_CO-L1034-2012-2º-Período [37873782].PDF
Jul. 27, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-35
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_CO-L1034-2012-2º-Periodo [37874436].PDF
Jul. 27, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-36
Project Monitoring Report ( Public version)
Report for Publication_PMR-_CO-L1034-2012-2º-Period [37875213].PDF
Jul. 27, 2013
English
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-30
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_CO-L1034-2012-1º-Período [37352651].PDF
Dec. 19, 2012
French
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-31
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_CO-L1034-2012-1º-Periodo [37353320].PDF
Jan. 21, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-32
Project Monitoring Report ( Public version)
Report for Publication_PMR-_CO-L1034-2012-1º-Period [37353980].PDF
Jan. 21, 2013
English
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-29
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_CO-L1034-2012-1º-Período [37352002].PDF
Dec. 19, 2012
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-25
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_CO-L1034-2011-2º-Período [36915615].PDF
Nov. 28, 2012
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-26
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_CO-L1034-2011-2º-Período [36921903].PDF
Nov. 28, 2012
French
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-27
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_CO-L1034-2011-2º-Periodo [36924486].PDF
Nov. 28, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-28
Project Monitoring Report ( Public version)
Report for Publication_PMR-_CO-L1034-2011-2º-Period [36927132].PDF
Nov. 28, 2012
English
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-21
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_CO-L1034-2011-1º-Período [36623905].PDF
Jan. 12, 2012
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-22
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_CO-L1034-2011-1º-Período [36624492].PDF
Jan. 12, 2012
French
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-23
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_CO-L1034-2011-1º-Periodo [36625046].PDF
Jan. 12, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-24
Project Monitoring Report ( Public version)
Report for Publication_PMR-_CO-L1034-2011-1º-Period [36625609].PDF
Jan. 12, 2012
English
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-20
Project Monitoring Report ( Public version)
Report for Publication_PMR-_CO-L1034-2010-2º-Period [36313199].PDF
Aug. 10, 2011
English
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-17
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_CO-L1034-2010-2º-Período [36310147].PDF
Aug. 10, 2011
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-18
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_CO-L1034-2010-2º-Período [36312040].PDF
Aug. 10, 2011
French
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-19
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_CO-L1034-2010-2º-Periodo [36312627].PDF
Aug. 10, 2011
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-16
Specific Procurement Notices
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES BELLO Water supply and sewerage [35599257].PDF
Dec. 31, 1999
English
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-62
Procurement Plan
Plan de Adquisiciones Aprobado_ Formato SEPA_ 19JUL10_ [11149960].XLS
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-15
Specific Procurement Notices
Diseño detallado y construcción del Interceptor Norte del río Medellín y obra [35248240].PDF
Dec. 31, 1999
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-2245
Loan Contract
Contrato Modificatorio No_ 1 - Programa de Saneamiento del Rio Medellin - Segunda Etapa [38585376].PDF
Feb. 10, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-39078
Loan Proposal
Loan Proposal [1895012].PDF
Dec. 31, 1899
English
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-39077
Loan Proposal
Propuesta de Préstamo [1895010].PDF
Dec. 31, 1899
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-6503
Loan Contract
Contrato Garantia - Proyecto de Saneamiento del Río Medellín - Segunda Etapa [1711287].pdf
Aug. 16, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-917194115-4923
Annual Project Audited Financial Statement
Informe Auditor EEFF 2018.pdf
Feb. 21, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-6504
Loan Contract
Contrato - Proyecto de Saneamiento del Río Medellín - Segunda Etapa [1711285].pdf
Aug. 16, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-136
Project Monitoring Report ( Public version)
CO-L1034 Second period Jan-Dec 2016-Public Report.pdf
Feb. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1854
Project Monitoring Report ( Public version)
CO-L1034 Second period Jan-Dec 2017-Public Report.pdf
Aug. 02, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31474
Project Monitoring Report ( Public version)
CO-L1034 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32194
Project Monitoring Report ( Public version)
CO-L1034 Second period Jan-Dec 2018-Public Report.pdf
Oct. 15, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-790
Project Monitoring Report ( Public version)
CO-L1034 First period Jan-Jun 2017-Public Report.pdf
Feb. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-917194115-4920
Annual Project Audited Financial Statement
Estados Financieros definitivos 2018.pdf
Feb. 21, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-5087
Loan Contract
Contrato Modificatorio No. 3 - Programa de Saneamiento del Río Medellín - Segunda Etapa.pdf
May. 02, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-917194115-4921
Annual Project Audited Financial Statement
Notas Informes financieros año 2018 definitivo.pdf
Feb. 21, 2019
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-58
Environmental Impact Assessments
Capitulo 6 - Plan de Manejo Ambiental [1624924].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-55
Environmental Impact Assessments
Capítulo 1 - Generalidades [1624910].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-56
Environmental Impact Assessments
Capítulo 3 - Caracterización del área de estudio del proyecto [1624914].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-57
Environmental Impact Assessments
Capitulo 5 - Zonificación Ambiental [1624920].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1860206681-2
Profile I
Perfil de Proyecto aprobado PIC [1405124].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-61
Environmental Impact Assessments
Tabla Links EIA [1626677].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-59
Environmental Impact Assessments
Capitulo 7 - Plan de monitoreo y seguimiento [1624932].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-60
Environmental Impact Assessments
Resumen Ejecutivo [1624935].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-11
Environmental Impact Assessments
Anexo 3_2 Caracterización del área de estudio del interceptor norte [1319680].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-12
Environmental Impact Assessments
Capítulo 2_ Descripción de las obras del programa de saneamiento del río Medellín - segunda etapa [1319682].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-13
Environmental Impact Assessments
Anexo 3_1 Caracterización del área de estudio de la planta de tratamiento de aguas residuales Bello [1319683].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-52
Environmental Impact Assessments
Capítulo 4_ Identificación y evaluación de impacto [1319678].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-14
Environmental Impact Assessments
Capítulo 9_ Diagnóstico ambiental-técnico-económico [1319691].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-53
Environmental Impact Assessments
Capítulo 8_ Análisis de riesgo y plan de contingencia [1319689].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-54
Environmental Impact Assessments
Información general sobre el proyecto [1319692].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-50
Project Outline
Programa de Saneamiento del Río Medellín - Segunda Etapa [1074575].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-993025226-51
Project Outline
Medellin River Sanitation Program - Fase II [1076034].PDF
Dec. 31, 1999
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top