Skip to main content

Strengthening Chile’s Climate Change Agenda and Support for the Organization of COP25

The objective of this Technical Cooperation (TC) is to assist Chile in the logistics and advancement of COP expected outcomes, including at the domestic, regional, and international scales, as the country assumes the presidency of the twenty-fifth Conference of the Parties (COP25) to the United Nations Framework Convention on Climate Change (UNFCCC.). Activities in preparation of COP25 will also include some coordinated interventions with the government of Costa Rica, which will host the pre-COP summit. COP25 will take place between December 03 and 12th, 2019. The pre-COP is expected to occur in October – November 2019.

Project Detail

Country

Chile

Project Number

CH-T1223

Approval Date

August 5, 2019

Project Status

Closed

Project Type

Technical Cooperation

Sector

ENVIRONMENT AND NATURAL DISASTERS

Subsector

CLIMATE CHANGE MITIGATION POLICY

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

Likely to cause minimal or no negative environmental and associated social impacts

Total Cost

USD 600,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 600,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-17504-CH Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-17504-CH
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Closed Phase
https://www.iadb.org/document.cfm?id=EZIDB0000162-1810235683-21
TCM Final Report
Technical Cooperation Monitoring Final Report.pdf
Apr. 10, 2024
English
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1810235683-7
TC Document
Results Matrix.xlsx
Mar. 23, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1810235683-8
TC Document
Request from the Client.pdf
Nov. 12, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1810235683-9
TC Document
Technical Cooperation Document.docx
Aug. 05, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-60909760-2
TC Document
Safeguard Policy Filter.pdf
Aug. 10, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-60909760-3
TC Document
Safeguard Screening Form.pdf
Aug. 06, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-1810235683-5
TC Document
Terms of Reference.pdf
Mar. 23, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1810235683-6
TC Document
Procurement Plan.xlsx
Nov. 12, 2019
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1810235683-3
TC Abstract
CH-T1223 - TC Abstract.pdf
Apr. 25, 2019
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top