Skip to main content

São Paulo Intercity Train Pre-Feasibility Studies

The objective of this operation is to prepare preliminary studies to define the pre-feasibility for the intercity train between São Paulo and Americana in the State of São Paulo. the studies will include preliminary financial analysis, pre-identification of legal aspects , preliminar environmental and social analysis, and legal and institutional collaboration framework on a municipal, state and federal level.

Project Detail

Country

Brazil

Project Number

BR-T1398

Approval Date

January 19, 2018

Project Status

Closed

Project Type

Technical Cooperation

Sector

TRANSPORT

Subsector

RAILWAYS

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

Likely to cause minimal or no negative environmental and associated social impacts

Total Cost

USD 337,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 337,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/GI-16634-BR Sovereign Guaranteed USD - United States Dollar Global Infrastructure Facility Nonreimbursable
Operation Number ATN/GI-16634-BR
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Global Infrastructure Facility
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-771840113-6
Approved TC document
TC Document BRT1398.pdf
Feb. 28, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-444859799-3
Approved TC document
Anexo II Matriz de Resultados.pdf
Mar. 06, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-444859799-6
Approved TC document
Anexo III Terms of Reference CL.pdf
Mar. 06, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-444859799-8
Approved TC document
Anexo I no objeción ABC.pdf
Mar. 06, 2018
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top