Skip to main content

Water Treatment & Energy Infrastructure for Petroquímica Suape

The specific objectives of this Technical Cooperation: are (i) to prepare a technical study that determines how to water infrastructure will be developed to reduce the consumption of water in the PTA plant; (ii) to prepare a technical study that determines how the energy infrastructure will be built to recycle sludge and convert methane gas into energy, promoting energy efficiencies in the PTA plant.

Project Detail

Country

Brazil

Project Number

BR-T1057

Approval Date

June 14, 2007

Project Status

Closed

Project Type

Technical Cooperation

Sector

WATER AND SANITATION

Subsector

WATER AND SANITATION

Lending Instrument

BID Invest

Lending Instrument Code

IIC

Modality

-

Facility Type

-

Environmental Classification

-

Total Cost

USD 150,000.00

Country Counterpart Financing

USD 50,000.00

Original Amount Approved

USD 100,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-10423-BR Non-Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-10423-BR
  • Lending Type: Non-Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable
Jump back to top