Skip to main content

Coke Production and Integrated Cogeneration

Design, development, construction, operation and maintenance of an integrated heat recovery coke and cogeneration facility located in the City of Vitória, State of Espirito Santo in Brazil

Project Detail

Country

Brazil

Project Number

BR-L1017

Approval Date

November 21, 2006

Project Status

Cancelled

Project Type

Loan Operation

Sector

ENERGY

Subsector

NEW THERMAL POWER PLANTS

Lending Instrument

BID Invest

Lending Instrument Code

IIC

Modality

PSL (Private Sector Loan)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 400,000,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 50,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
1807A/OC-BR Non-Sovereign Guaranteed USD - United States Dollar Ordinary Capital Private Sector Financing
1807B/OC-BR Non-Sovereign Guaranteed USD - United States Dollar Ordinary Capital Participant Financing
Operation Number 1807A/OC-BR
  • Lending Type: Non-Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Private Sector Financing
Operation Number 1807B/OC-BR
  • Lending Type: Non-Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Participant Financing
Jump back to top