Skip to main content

Integrated Management Plan for Drainage and Flood Control in the Arroyo Medrano Basin (CAM)

This technical cooperation aims to support the preparation and proper execution of the Drainage Program for Vulnerable Municipalities ( AR- L1161 ), through the development of integrated management plans in vulnerable municipalities of Argentina, for the purpose of serving as a planning and framework for the implementation of preventive and corrective actions of the following causes : i) a structural nature associated with: the construction , expansion or rehabilitation of drainage infrastructure and flood control , and ii) nonstructural nature associated with: the design of institutions and adoption of financial/legal mechanisms and regulatory frameworks, required to mitigate risks of concentrated and high intensity rains.

Project Detail

Country

Argentina

Project Number

AR-T1158

Approval Date

December 5, 2016

Project Status

Closed

Project Type

Technical Cooperation

Sector

WATER AND SANITATION

Subsector

INTEGRAL MANAGEMENT OF WATER RESOURCES

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 600,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 600,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/LA-15934-AR Sovereign Guaranteed USD - United States Dollar AECID/LAF Fund Nonreimbursable
Operation Number ATN/LA-15934-AR
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: AECID/LAF Fund
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-907069276-170
Procurement Plan
Plan de Gestión Integral de Drenaje y Control de Inundaciones en la Cuenca del arroyo Medrano (CAM)_ Plan de Ad [40824318].XLSX
Jan. 27, 2017
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-907069276-11
Specific Procurement Notices
AR-T1158 [40666793].PDF
Sep. 14, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1246220487-79
BEO Procurement
AR-T1158 Aviso Adjudicacion.pdf
Jan. 26, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1706368420-51
Consultant/Firm Final Report
LineamientosEstrategicos-Planes de Drenaje Urbano.pdf
Sep. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1706368420-40
Consultant/Firm Final Report
PMDU Medrano - Tomo I PMDU Final.pdf
Sep. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1706368420-41
Consultant/Firm Final Report
PMDU Medrano-Tomo II Enfoque y Estudios Básicos Final.pdf
Sep. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1706368420-42
Consultant/Firm Final Report
PMDU Medrano-Tomo II Anexos.pdf
Sep. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1706368420-43
Consultant/Firm Final Report
PMDU Medrano-Tomo II Mapas.pdf
Sep. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1706368420-44
Consultant/Firm Final Report
PMDU Medrano-Tomo III Diagnóstico Integrado Final.pdf
Sep. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1706368420-45
Consultant/Firm Final Report
PMDU Medrano-Tomo III Anexos.pdf
Sep. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1706368420-46
Consultant/Firm Final Report
PMDU Medrano-Tomo IV Evaluaciones y Soluciones Final.pdf
Sep. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1706368420-47
Consultant/Firm Final Report
PMDU Medrano-Tomo IV Anexos.pdf
Sep. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1706368420-49
Consultant/Firm Final Report
PMDU Medrano - Tomo V Términos de Referencia.pdf
Sep. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1706368420-50
Consultant/Firm Final Report
PMDU Medrano - Tomo VI Manual de Drenaje.pdf
Sep. 12, 2019
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top