Productive and Tourism Infrastructure Program for the Province of Río Negro
The Project's goals are to consolidate the productive and tourism sectors development, through the strengthening and expansion of the public economic infrastructure and the good practices applied in their management.

Project Detail

Country

Argentina

Project Number

AR-L1106

Approval Date

December 14, 2010

Project Status

Closed

Project Type

Loan Operation

Sector

TRANSPORT

Subsector

TRANSPORT

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

GOM (Global of Multiple Works Operation)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 37,500,000.00

Country Counterpart Financing

USD 7,500,000.00

Original Amount Approved

USD 30,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
2491/OC-AR Sovereign Guaranteed USD - United States Dollar Ordinary Capital Single Currency Facility
Operation Number 2491/OC-AR
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Single Currency Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-8617
Loan Contract
Préstamos a la Provincia de Río Negro con tasa de interés basada en LIBOR - Cambio de la base de cálculo de intereses.pdf
Aug. 19, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33935
Project Monitoring Report ( Public version)
AR-L1106 First period Jan-Jun 2020 - Public Report.pdf
Mar. 08, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33266
Project Monitoring Report ( Public version)
AR-L1106 Second period Jan-Dec 2019-Public Report.pdf
Aug. 24, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1782374501-28
Annual Project Audited Financial Statement
Estados financieros auditados - Ejercicio irregular enero 2019 - julio 2020.pdf
Nov. 17, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1807381240-7
Project Monitoring Report ( Public version)
AR-L1106 First period Jan-Jun 2016-Public Report [40797195].PDF
Dec. 23, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1807381240-6
Project Monitoring Report ( Public version)
AR-L1106 Second period Jan-Dec 2015-Public Report [40360700].PDF
Jun. 23, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1807381240-5
Project Monitoring Report ( Public version)
AR-L1106 First period Jan-Jun 2015-Public Report [40181699].PDF
Mar. 15, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1807381240-4
Project Monitoring Report ( Public version)
AR-L1106 Second period Jan-Dec 2014-Public Report [40178555].PDF
Mar. 14, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1807381240-3
Project Monitoring Report ( Public version)
AR-L1106 First period Jan-Jun 2014-Public Report [40175949].PDF
Mar. 11, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-1807381240-2
Project Monitoring Report ( Public version)
AR-L1106 Second period Jan-Dec 2013-Public Report [40172742].PDF
Mar. 10, 2016
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-969
Loan Contract
Contrato Modificatorio Nº1 - Programa de Infraestructura Productiva y Turística para la Provincia de Río Negro [40186514].PDF
Mar. 17, 2016
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-45
Specific Procurement Notices
AR-L1106 [39923784].PDF
Oct. 26, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-44
Specific Procurement Notices
AR-L1106 [39907972].PDF
Oct. 15, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-43
Specific Procurement Notices
AR-L1106 [39888639].PDF
Oct. 02, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-42
Specific Procurement Notices
AR-L1106 [39834209].PDF
Sep. 03, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-41
Specific Procurement Notices
AR-L1106 [39673984].PDF
Jun. 16, 2015
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-40
Specific Procurement Notices
AR-L1106 [38935487].PDF
Jul. 21, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-39
Specific Procurement Notices
AR-L1106 [38932438].PDF
Jul. 21, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-35
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_AR-L1106-2013-1º-Período [38265123].PDF
Mar. 06, 2014
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-36
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_AR-L1106-2013-1º-Período [38265783].PDF
Mar. 06, 2014
French
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-37
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_AR-L1106-2013-1º-Periodo [38266443].PDF
Mar. 06, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-38
Project Monitoring Report ( Public version)
Report for Publication_PMR-_AR-L1106-2013-1º-Period [38267108].PDF
Mar. 06, 2014
English
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-31
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_AR-L1106-2012-2º-Período [37872910].PDF
Jul. 27, 2013
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-32
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_AR-L1106-2012-2º-Período [37873578].PDF
Jul. 27, 2013
French
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-33
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_AR-L1106-2012-2º-Periodo [37874231].PDF
Jul. 27, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-34
Project Monitoring Report ( Public version)
Report for Publication_PMR-_AR-L1106-2012-2º-Period [37874968].PDF
Jul. 27, 2013
English
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-27
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_AR-L1106-2012-1º-Período [37351815].PDF
Dec. 19, 2012
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-28
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_AR-L1106-2012-1º-Período [37352458].PDF
Dec. 19, 2012
French
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-29
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_AR-L1106-2012-1º-Periodo [37353132].PDF
Jan. 21, 2013
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-30
Project Monitoring Report ( Public version)
Report for Publication_PMR-_AR-L1106-2012-1º-Period [37353789].PDF
Jan. 21, 2013
English
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-23
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_AR-L1106-2011-2º-Período [37297709].PDF
Nov. 28, 2012
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-24
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_AR-L1106-2011-2º-Período [37297900].PDF
Nov. 28, 2012
French
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-25
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_AR-L1106-2011-2º-Periodo [37298092].PDF
Nov. 28, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-26
Project Monitoring Report ( Public version)
Report for Publication_PMR-_AR-L1106-2011-2º-Period [37298283].PDF
Nov. 28, 2012
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-3090
Loan Contract
Contrato Garantia Programa de Infraestructura Productiva y Turística para la Provincia de Río Negro [35412271].PDF
Jul. 10, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-3232
Loan Contract
Programa de Infraestructura Productiva y Turística para la Provincia de Río Negro [39948937].PDF
Dec. 31, 1899
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-22
Project Monitoring Report ( Public version)
Report for Publication_PMR-_AR-L1106-2011-1º-Period [36625443].PDF
Jan. 12, 2012
English
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-19
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_AR-L1106-2011-1º-Período [36623626].PDF
Jan. 12, 2012
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-20
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_AR-L1106-2011-1º-Período [36624294].PDF
Jan. 12, 2012
French
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-21
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_AR-L1106-2011-1º-Periodo [36624875].PDF
Jan. 12, 2012
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-15
Project Monitoring Report ( Public version)
Relatório para publicação_PMR-_AR-L1106-2010-2º-Período [36309976].PDF
Aug. 10, 2011
Portuguese
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-16
Project Monitoring Report ( Public version)
Rapport pour Publication_PMR-_AR-L1106-2010-2º-Período [36311861].PDF
Aug. 10, 2011
French
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-17
Project Monitoring Report ( Public version)
Informe para Publicación_PMR-_AR-L1106-2010-2º-Periodo [36312445].PDF
Aug. 10, 2011
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-18
Project Monitoring Report ( Public version)
Report for Publication_PMR-_AR-L1106-2010-2º-Period [36313022].PDF
Aug. 10, 2011
English
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-13
Loan Proposal
Programa de Infraestructurs Productiva y Turística para la Provincia de Río Negro_ [35525089].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-14
Loan Proposal
Productive and Tourism Infrastructure Program for the Province of Río Negro_ [35525091].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-12
General Procurement Notices
ANUNCIO GENERAL DE ADQUISICIONES misc [35514608].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1126
Project Monitoring Report ( Public version)
AR-L1106 First period Jan-Jun 2017-Public Report.pdf
Feb. 15, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-1436
Project Monitoring Report ( Public version)
AR-L1106 Second period Jan-Dec 2017-Public Report.pdf
Aug. 01, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-30923
Project Monitoring Report ( Public version)
AR-L1106 First period Jan-Jun 2018-Public Report.pdf
Dec. 14, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-31949
Project Monitoring Report ( Public version)
AR-L1106 Second period Jan-Dec 2018-Public Report.pdf
Oct. 15, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32632
Project Monitoring Report ( Public version)
AR-L1106 First period Jan-Jun 2019-Public Report.pdf
Feb. 12, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-475
Project Monitoring Report ( Public version)
AR-L1106 Second period Jan-Dec 2016-Public Report.pdf
Feb. 14, 2018
English
Closed Phase
https://www.iadb.org/document.cfm?id=EZSHARE-548404799-7
Project Completion Report
Informe Terminacion Proyecto (PCR) AR-L1106.pdf
Aug. 17, 2021
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-1807381240-1150
Electronic Links
Cambios en la Matriz de Resultados.docx
Aug. 17, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1807381240-1149
Electronic Links
Versión Final del Reporte de Monitoreo del Programa (PMR).pdf
Aug. 17, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1807381240-1145
Electronic Links
LP Anexo I Resumen Dem.PDF
Aug. 17, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1807381240-1144
Electronic Links
Información detallada sobre Productos ejecutados.docx
Aug. 17, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1807381240-1143
Electronic Links
Cálculos de Indicadores de Resultado.docx
Aug. 17, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1807381240-1142
Electronic Links
Anexo 3 PCR Checklist.xlsx
Aug. 17, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1807381240-1141
Electronic Links
Evaluacion Eco Ex Post - Rio Negro - Abril 2021.pdf
Aug. 17, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1807381240-1138
Electronic Links
Ayuda memoria - Taller de cierre del 31 de agosto de 2020.pdf
Aug. 17, 2021
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-11
Project Profile
Programa de Infraestructura Productiva y Turística para laProvincia de Río Negro_ [35366592].PDF
Dec. 31, 1999
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1195963465-2743
Environmental Analyses
AR-L1106_IGAS [35378710].doc
Apr. 03, 2019
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint