Skip to main content
Water Security for the coastal area of ​​the Department of Canelones
The objective of this TC is to develop studies to ensure the provision of potable water services with excellence and efficiency to 2045 on the Gold Coast, meeting the emerging needs of the expected population growth during that period. Within this framework, this TC will identify interventions to optimize the provision of services, which will positively impact the area in the short term. It's of fundamental importance to design a long-term Strategic Action Plan in view of the magnitude of the challenges that the supply of drinking water represents for the Balnearia de Canelones area and Uruguay. In this regard, the TC will support the preparation of studies of the Costa de Oro area on: system demand, alternatives for purification, studies to improve the efficiency of the supply system, basic studies for the dam, and preliminary projects of dam and purification plant, in accordance with technical guidelines that address prospective analysis of future scenarios, based on a correct diagnosis of the current status of the systems.

Project Detail

Country

Uruguay

Project Number

UR-T1220

Approval Date

September 16, 2019

Project Status

Closed

Project Type

Technical Cooperation

Sector

WATER AND SANITATION

Subsector

INTEGRAL MANAGEMENT OF WATER RESOURCES

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

Likely to cause minimal or no negative environmental and associated social impacts

Total Cost

USD 190,000.00

Country Counterpart Financing

USD 40,000.00

Original Amount Approved

USD 150,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-17567-UR Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-17567-UR
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1487437346-13
Annual Project Audited Financial Statement
Estados Financieros Auditados Finales.pdf
Nov. 23, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25894
Specific Procurement Notices
UR-T1220_6167_2_SP.pdf
Aug. 03, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25738
Specific Procurement Notices
UR-T1220_P536167_SP.pdf
Jul. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-6832
Technical Cooperation Agreement
Proyecto Seguridad Hídrica para la Zona costera del Departamento de Canelones.pdf
Feb. 13, 2020
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1244322433-10
TC Abstract
Abstracto de CT- UR-T1220.docx
Jul. 16, 2019
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top