Mexican Facility for Integration Infrastructure in Mesoamerica and the Caribbean (MEXINFINT)
The general objective of this facility is to deepen the productive integration of Mesoamerican and Caribbean countries through the strengthening of integration infrastructure, cross-border connectivity and regional integration corridors. This includes roads, ports, airports, border crossings and their multimodal logistics interconnectivity, and energy and telecommunications connectivity, among others. The specific objectives are: i) To facilitate the mobilization and leverage of more IDB resources committed to investment in strategic integration infrastructure projects for Mesoamerican and Caribbean countries through IDB loans and grants with support from borrowing member countries and donors; ii) Strengthen regulatory and procedural frameworks and harmonize them among countries so that integration infrastructure projects can function seamlessly among them and realize the full potential of their economic and social returns; Strengthen the institutional capacities of public- and private-sector operators of integration infrastructure.

Project Detail

Country

Regional

Project Number

RG-O1665

Approval Date

-

Project Status

Preparation

Project Type

Container

Sector

REGIONAL INTEGRATION

Subsector

REGIONAL AND CROSS-BORDER COOPERATION

Lending Instrument

-

Lending Instrument Code

-

Modality

Facility

Facility Type

FFG (Facility Financing for Grants)

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 3,000,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 3,000,000.00

Financial Information

Can’t find a document? Request information

Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-5253
General Agreement
Acuerdo de Línea de Crédito Condicional - Chile -Programa de Construcción del Túnel Internacional Paso de Agua Negra.pdf
May. 30, 2018
Spanish