Skip to main content
Modernization of the Salto Grande Binational Hydropower Complex
The overall objective is to help ensure the availability of the Salto Grande Hydropower Complex(SGHC), enhancing the reliability and efficiency of the interconnection between Argentina and Uruguay. The specific objective is to assist in extending the useful life of the SGHC by modernizing its infrastructure and equipment

Project Detail

Country

Regional

Project Number

RG-L1124

Approval Date

November 28, 2018

Project Status

Implementation

Project Type

Loan Operation

Sector

ENERGY

Subsector

ENERGY INTEGRATION

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 80,000,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 80,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
4694/OC-RG Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
4695/OC-RG Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility
Operation Number 4694/OC-RG
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility
Operation Number 4695/OC-RG
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-44622
Project Monitoring Report ( Public version)
RG-L1124 First period Jan-Jun 2023 - Public Report.PDF
Jan. 29, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-43793
Project Monitoring Report ( Public version)
RG-L1124 Second period Jan-Dec 2022 - Public Report.PDF
Jul. 21, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000470-15255986-280
Annual Project Audited Financial Statement
Estados Financieros Auditados 2022.pdf
May. 30, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-42527
Project Monitoring Report ( Public version)
RG-L1124 First period Jan-Jun 2022 - Public Report.PDF
Feb. 09, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-41287
Project Monitoring Report ( Public version)
RG-L1124 Second period Jan-Dec 2021 - Public Report.PDF
Aug. 15, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-33507
Specific Procurement Notices
RG-L1124_P991155_SP.pdf
Jun. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-33508
Specific Procurement Notices
RG-L1124_P991167_SP.pdf
Jun. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-33444
Specific Procurement Notices
RG-L1124_P984032_SP.pdf
Jun. 01, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-33442
Specific Procurement Notices
RG-L1124_P984026_SP.pdf
Jun. 01, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-33443
Specific Procurement Notices
RG-L1124_P984020_SP.pdf
Jun. 01, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-33441
Specific Procurement Notices
RG-L1124_P984029_SP.pdf
Jun. 01, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-15255986-257
Annual Project Audited Financial Statement
Estados financieros auditados - ejercicio 2021.pdf
Jun. 24, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-15255986-254
Annual Project Audited Financial Statement
Estados Financieros Auditados 2021 4695_OC_RG.pdf
May. 31, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32876
Specific Procurement Notices
RG-L1124_8728_5_SP.pdf
Mar. 01, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35733
Project Monitoring Report ( Public version)
RG-L1124 First period Jan-Jun 2021 - Public Report.pdf
Feb. 28, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32717
Specific Procurement Notices
RG-L1124_8728_4_SP.pdf
Jan. 31, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32677
Specific Procurement Notices
RG-L1124_8728_3_SP.pdf
Jan. 24, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32609
Specific Procurement Notices
RG-L1124_8728_2_SP.pdf
Jan. 11, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32502
Specific Procurement Notices
RG-L1124_8728_1_SP.pdf
Dec. 17, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-32196
Specific Procurement Notices
RG-L1124_P858728_SP.pdf
Nov. 03, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31783
Specific Procurement Notices
RG-L1124_2829_9_SP.pdf
Aug. 24, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31742
Specific Procurement Notices
RG-L1124_2829_8_SP.pdf
Aug. 18, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31697
Specific Procurement Notices
RG-L1124_2829_7_SP.pdf
Aug. 10, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31588
Specific Procurement Notices
RG-L1124_2829_6_SP.pdf
Jul. 22, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35068
Project Monitoring Report ( Public version)
RG-L1124 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 20, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31544
Specific Procurement Notices
RG-L1124_2829_5_SP.pdf
Jul. 16, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-15255986-135
Annual Project Audited Financial Statement
EFA 2020 4695-OC-RG.pdf
Jul. 23, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31532
Notice of Contract Award (SG)
RG-L1124_C778426_AW.pdf
Jul. 14, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31526
Specific Procurement Notices
RG-L1124_2829_4_SP.pdf
Jul. 13, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31510
Specific Procurement Notices
RG-L1124_2829_3_SP.pdf
Jul. 08, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31449
Specific Procurement Notices
RG-L1124_2829_2_SP.pdf
Jun. 30, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31307
Specific Procurement Notices
RG-L1124_2829_1_SP.pdf
Jun. 08, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31270
Notice of Contract Award (SG)
RG-L1124_C749666_AW.pdf
Jun. 03, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-15255986-122
Annual Project Audited Financial Statement
Estados financieros auditados - ejercicio 2020.pdf
Jul. 19, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31199
Notice of Contract Award (SG)
RG-L1124_C744902_AW.pdf
May. 26, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31194
Notice of Contract Award (SG)
RG-L1124_C744992_AW.pdf
May. 26, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31122
Specific Procurement Notices
RG-L1124_6445_5_SP.pdf
May. 12, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31050
Specific Procurement Notices
RG-L1124_2388_15_SP.pdf
May. 05, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31032
Specific Procurement Notices
RG-L1124_5207_1_SP.pdf
Apr. 30, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31020
Specific Procurement Notices
RG-L1124_6445_4_SP.pdf
Apr. 27, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30989
Specific Procurement Notices
RG-L1124_2388_14_SP.pdf
Apr. 22, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30949
Specific Procurement Notices
RG-L1124_6445_3_SP.pdf
Apr. 16, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30923
Specific Procurement Notices
RG-L1124-2388_13_SP.pdf
Apr. 14, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30922
Specific Procurement Notices
RG-L1124_0073_11_SP.pdf
Apr. 14, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30908
Specific Procurement Notices
RG-L1124_6445_2_SP.pdf
Apr. 12, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30873
Specific Procurement Notices
RG-L1124_2388_12_SP.pdf
Apr. 09, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30871
Specific Procurement Notices
RG-L1124_6445_1_SP.pdf
Apr. 09, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30727
Specific Procurement Notices
RG-L1124_2388_11_SP.pdf
Mar. 22, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30654
Specific Procurement Notices
RG-L1124_2388_10_SP.pdf
Mar. 12, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30653
Specific Procurement Notices
RG-L1124_0073_10_SP.pdf
Mar. 12, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30640
Specific Procurement Notices
RG-L1124_P685207_SP.pdf
Mar. 11, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-34250
Project Monitoring Report ( Public version)
RG-L1124 First period Jan-Jun 2020 - Public Report.pdf
Mar. 09, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-30600
Specific Procurement Notices
RG-L1124_2388_9_SP.pdf
Mar. 02, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-27721
Specific Procurement Notices
RG-L1124_P656445_SP.pdf
Feb. 04, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26779
Specific Procurement Notices
RG-L1124_P650073_SP.pdf
Jan. 27, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26702
Specific Procurement Notices
RG-L1124_P515378_8_SP.pdf
Jan. 05, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26679
Specific Procurement Notices
RG-L1124_P632388_SP.pdf
Jan. 04, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26677
Specific Procurement Notices
RG-L1124_8649_7_SP.pdf
Jan. 04, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26676
Specific Procurement Notices
RG-L1124_6293_6_SP.pdf
Jan. 04, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26657
Specific Procurement Notices
RG-L1124_8651_5_SP.pdf
Dec. 22, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26619
Specific Procurement Notices
RG-L1124_6293_4_SP.pdf
Dec. 15, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26603
Specific Procurement Notices
RG-L1124_8651_4_SP.pdf
Dec. 11, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26569
Specific Procurement Notices
RG-L1124_6293_3_SP.pdf
Jun. 04, 2021
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26568
Specific Procurement Notices
RG-L1124_5378_9_SP.pdf
Dec. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26551
Specific Procurement Notices
RG-L1124_P610968_SP.pdf
Dec. 02, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26504
Specific Procurement Notices
RG-L1124_5378_8_SP.pdf
Nov. 23, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26482
Specific Procurement Notices
RG-L1124_8651_2_SP.pdf
Nov. 17, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26429
Specific Procurement Notices
RG-L1124_8649_3_SP.pdf
Nov. 09, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26364
Specific Procurement Notices
RG-L1124_P578651_SP.pdf
Oct. 26, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26244
Specific Procurement Notices
RG-L1124_P566293_SP.pdf
Oct. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26156
Specific Procurement Notices
RG-L1124_P559231_SP.pdf
Sep. 24, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26150
Specific Procurement Notices
RG-L1124_5378_6_SP.pdf
Sep. 23, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-26143
Specific Procurement Notices
RG-L1124_P558649_SP.pdf
Sep. 23, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33824
Project Monitoring Report ( Public version)
RG-L1124 Second period Jan-Dec 2019-Public Report.pdf
Aug. 25, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25726
Specific Procurement Notices
RG-L1124_5378_3_SP.pdf
Jun. 30, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25699
Specific Procurement Notices
RG-L1124_3499_2_SP.pdf
Jun. 25, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-23047
Specific Procurement Notices
RG-L1124 696_1.pdf
Jul. 15, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-213375885-64
Loan Proposal
EER#03. Informe de Gestión Ambiental y Social (IGAS).pdf
Apr. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1470197173-48230
Loan Contract
República Oriental del Uruguay - Modernización del Complejo Hidroeléctrico Binacional Salto Grande.pdf
Dec. 07, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-213375885-36
Loan Proposal
EEO#05. Anexo Cambio Climático (CC).docx
Apr. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-23060
General Procurement Notices
RG-L1124 810.pdf
Jul. 15, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-213375885-65
Loan Proposal
EEO#10. Índices Hydroamp.pdf
Apr. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1470197173-48231
Loan Contract
Republic of Uruguay - Modernization of the Salto Grande Binational Hydropower Complex.pdf
Dec. 07, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-24722
Specific Procurement Notices
RG-L1124 4694.pdf
Dec. 26, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-939930464-2
Loan Proposal
RG-L1124_SPF_20180710_1557.pdf
Nov. 28, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-24828
Notice of Contract Award (SG)
RG-L1124 0893.pdf
Jan. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-213375885-86
Loan Proposal
RG-L1124-Regional. Proposal for a loan for the project Modernization of the Salto Grande Binational Hydropower Complex”.pdf
Apr. 12, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-939930464-3
Loan Proposal
RG-L1124_SSF_20180710_1557.pdf
Nov. 28, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-213375885-38
Loan Proposal
EEO#04. Cumplimiento de la Política de Servicios Públicos (PUP) (GN-2716-6).doc
Apr. 15, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-24840
Specific Procurement Notices
RG-L1124 2699.pdf
Jan. 10, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-213375885-87
Loan Proposal
RG-L1124-Regional. Propuesta de préstamo para el proyecto Modernización del Complejo Hidroeléctrico Binacional Salto Grande”.pdf
Apr. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-213375885-40
Loan Proposal
EER#04. Plan de Adquisiciones (PA).xlsx
Apr. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-24851
Specific Procurement Notices
RG-L1124 2699-2.pdf
Jan. 13, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-32554
Project Monitoring Report ( Public version)
RG-L1124 Second period Jan-Dec 2018-Public Report.pdf
Oct. 16, 2019
English
https://www.iadb.org/document.cfm?id=EZSHARE-213375885-41
Loan Proposal
EER#01. Plan de Ejecución del Programa (PEP).pdf
Apr. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-10
Specific Procurement Notices
RG-L1124_P452699_SP.pdf
Jan. 15, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-33173
Project Monitoring Report ( Public version)
RG-L1124 First period Jan-Jun 2019-Public Report.pdf
Feb. 12, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-6450
Loan Contract
Contrato - Modernización del Complejo Hidroeléctrico Binacional Salto Grande (AR).pdf
Jul. 29, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-213375885-49
Loan Proposal
EEO#02 - Estudios para el Diagnóstico de Modernización de la CHSG.pdf
Apr. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25199
Specific Procurement Notices
RG-L1124_3555_3_SP.pdf
Mar. 03, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-2056220512-6577
Loan Contract
Contrato - Modernización del Complejo Hidroeléctrico Binacional Salto Grande (UR).pdf
Oct. 02, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-213375885-53
Loan Proposal
EEO#08. Reglamento Operativo del Programa (ROP).docx
Apr. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25305
Specific Procurement Notices
RG-L1124_P515378_SP.pdf
Mar. 27, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-22345
Specific Procurement Notices
RG-L1124 205.pdf
Mar. 04, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-213375885-54
Loan Proposal
EER#01. Plan Operativo Anual (POA).xlsx
Apr. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25406
Specific Procurement Notices
RG-L1124_5378_2_SP.pdf
Apr. 17, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1470197173-48228
Loan Contract
República Argentina - Modernización del Complejo Hidroeléctrico Binacional Salto Grande.pdf
Dec. 07, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-213375885-29
Loan Proposal
EER#02. Plan de Monitoreo y Evaluación.docx
Apr. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-22923
Specific Procurement Notices
RG-L1124 696.pdf
Jun. 26, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-213375885-56
Loan Proposal
EEO#07. Análisis de Seguridad de Presas.pdf
Apr. 12, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-25474
Specific Procurement Notices
RG-L1124_P523499_SP.pdf
May. 05, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1470197173-48229
Loan Contract
Argentine Republic - Modernization of the Salto Grande Binational Hydropower Complex.pdf
Dec. 07, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-213375885-31
Loan Proposal
EEO#01. Análisis Económico Financiero.docx
Apr. 12, 2019
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-1375635338-31099
RG-L1124_P732829_SP.pdf
May. 10, 2021
https://www.iadb.org/document.cfm?id=EZSHARE-580532928-6
Results Matrix
HO-L1203-PP-Anexo I DEM.xlsx
Jan. 29, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-213375885-48
Results Matrix
Anexo I y EER#01 - DEM.xlsx
Jan. 29, 2014
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-213375885-8
Results Matrix
Anexo I. DEM.xlsx
May. 10, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1132444900-22299
General Agreement
RG-L1124 141.pdf
Feb. 19, 2019
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-213375885-19
EEO#06. Anexo Integración Regional.docx
Apr. 12, 2019
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-213375885-74
Project Profile
Perfil de Proyecto para Publicacion.pdf
Oct. 23, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-939930464-4
Environmental and Social Analyses
Estudio Ambiental y Social Preliminar RG-L1124.pdf
Aug. 14, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-939930464-6
Environmental and Social Analyses
EEO010 - Estudio Ambiental y Social (Final).pdf
Sep. 28, 2018
English
https://www.iadb.org/document.cfm?id=EZSHARE-939930464-5
Environmental and Social Management Plan
Revisión PADE Preliminar RG-L1124.pdf
Aug. 14, 2018
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-939930464-7
Environmental and Social Analyses
EEO08 - Anexo Técnico-Análisis de Seguridad de Presas.pdf
Sep. 27, 2018
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Blogs
Published 2024
SIESUR celebra octava mesa de diálogo en Paraguay
La ciudad de Asunción, Paraguay, fue el escenario de la Octava Mesa de Diálogo del Sistema de Integración Energética de los Países del Sur (SIESUR), realizada el 27 de febrero de 2024 bajo la Coordinación Pro Tempore de este sistema, representada por el Viceministerio de Minas y Energía de Paraguay y con el apoyo de
Blogs
Published 2023
Iniciativa SINEA: hacia la integración eléctrica de la región andina
El próximo 9 de mayo se llevará a cabo en la ciudad de Quito, Ecuador, la cumbre de ministros del Sistema de Interconexión Eléctrica Andina (SINEA). A partir de esta cumbre, los países miembros buscan reafirmar su voluntad de avanzar en la creación de un Mercado Andino Eléctrico Regional (MAER) a través de la firma
Blogs
Published 2021
Centroamérica consolida la integración del Mercado Eléctrico Regional
En este mes celebramos 25 años de la firma del Tratado Marco del Mercado Eléctrico Regional entre los seis países de América Central. Este Tratado fundamenta el desarrollo del Mercado Eléctrico Regional (MER), y la construcción de la infraestructura del Sistema de Interconexión Eléctrica de los Países de América Central (SIEPAC). Son 25 años desde el
Blogs
Published 2022
Infraestrutura sustentável na recuperação econômica da América Latina e do Caribe
A infraestrutura desempenha um papel irrefutável no desenvolvimento e na atividade econômica dos países. Uma infraestrutura melhor impulsiona a atividade econômica, possibilita o intercâmbio de mercadorias, aumenta a qualidade de vida da população e facilita a mobilidade social. A infraestrutura é necessária para levar serviços básicos para a população, como acesso a água potável, serviços
Blogs
Published 2023
Modernizar la infraestructura física para impulsar el desarrollo económico
La transformación digital se ha convertido en un factor clave para el desarrollo y la eficiencia en todos los sectores, incluida la infraestructura física. La adopción de soluciones digitales ofrece una amplia gama de beneficios, desde mejorar la calidad de los servicios, hasta optimizar los recursos y promover la sostenibilidad. Hoy día, la infraestructura en
Blogs
Published 2022
Interconexión eléctrica: grandes avances para la integración energética regional
La interconexión eléctrica entre Ecuador y Perú representa un viejo anhelo de ambos países. Su desarrollo consolidará el arranque del ambicioso proyecto de Integración Eléctrica Andina SINEA, el cual pretende crear un mercado regional desde Colombia hasta Chile con el objetivo de mejorar la seguridad energética de forma eficiente. La integración energética en la región
Blogs
Published 2024
Por qué es importante evaluar riesgos contextuales: De qué forma la comprensión del contexto contribuye a la eficacia de las operaciones
En el ámbito de las intervenciones de desarrollo, donde los esfuerzos apuntan a abordar desafíos multifacéticos como el alivio de la pobreza y el desarrollo de infraestructura, el Banco Interamericano de Desarrollo (BID) desempeña un papel fundamental.Recientemente, el BID actualizó su Marco de Política Ambiental y Social, enfatizando la importancia de fomentar sociedades inclusivas y prósperas en América Latina y el Caribe (ALC), destacando la intrincada conexión entre el desarrollo económico y la sostenibilidad ambiental y social.
Blogs
Published 2021
¿Cómo recuperar la infraestructura patrimonial?
Tal como se mencionó en el primer blog de esta serie, el Programa de Revitalización de Barrios e Infraestructura Patrimonial Emblemática (PRBIPE), también conocido como REVIVE BARRIOS, es una iniciativa del gobierno de Chile destinada a la revalorización de inmuebles y entornos urbanos con gran valor patrimonial que se encuentran en estado de deterioro. El
Blogs
Published 2023
Construyendo infraestructura con impacto social
Invertir en la calidad y la adecuada cobertura de servicios de infraestructura es un componente esencial para alcanzar el desarrollo económico sostenible de América Latina y el Caribe (ALC). El rol de la infraestructura es fundamental en este esfuerzo, al reducir los costos de producción, generar empleo, incrementar el acceso a servicios básicos de calidad,
Blogs
Published 2024
Conexiones inteligentes para la transición energética en América Latina y el Caribe
Durante las últimas dos décadas se ha presentado un crecimiento significativo de las energías renovables en nuestra región. Esta revolución fue liderada inicialmente por Brasil, Chile y México, que en su momento se beneficiaron de economías de escala cuando el costo de la electricidad de estas fuentes disminuyo, algo que se replicó posteriormente en otros
Powered by FindIT
Jump back to top