Skip to main content
Intelligent Road Asset Management and Digital Transformation of the Transport Sector in Honduras
The Objective of this Technical Cooperation (TC) is to support the Secretariat of Infrastructure and Transport of Honduras (SIT) to improve the performance of the transport infrastructure in the country, through the application of information technology and digital tools, for the management of transport services, the maintenance of road assets and the improvement of road safety, among others. The Specific Objectives of the TC include: (i) Design a digital transformation strategy for the transportation sector in Honduras (Intelligent Infrastructure or Infratech); (ii) provide the SIT with a catalog of technological options to apply to transportation services and the country's road infrastructure, promoting the concept of intelligent infrastructure; and (iii) Design and launch an action plan for the implementation of an Intelligent Road Asset Management System (SGAV).

Project Detail

Country

Honduras

Project Number

HO-T1355

Approval Date

June 10, 2022

Project Status

Implementation

Project Type

Technical Cooperation

Sector

TRANSPORT

Subsector

DEMAND MANAGEMENT AND CONTROL OF URBAN TRANSPORT SYSTEMS

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

Likely to cause minimal or no negative environmental and associated social impacts

Total Cost

USD 250,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 250,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-19282-HO Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-19282-HO
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000329-1135586112-7
Annual Procurement Plan (for BEO only)
Solicitud Expresiones de Interes SGAV con TDR.pdf
Mar. 07, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000329-1135586112-8
BEO Procurement
Solicitud Expresiones de Interes Transformación Digital con TDR.pdf
Mar. 07, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1135586112-4
BEO Procurement
Solicitud Expresiones de Interes Transformacion Digital.pdf
Mar. 03, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1135586112-5
BEO Procurement
Solicitud Expresiones de Interes SGAV.pdf
Mar. 03, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1135586112-3
BEO Procurement
Solicitud Expresiones de Interes TransformacionDigital.pdf
Mar. 03, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-264354194-21
TC Document
Plan de Adquisiciones_99032.pdf
Jun. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-264354194-22
TC Document
Documento de CT - Divulgacion_68204.pdf
Jun. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-264354194-19
TC Document
Matriz de Resultados_37023.pdf
Jun. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-264354194-20
TC Document
Terminos de Referencia_15577.pdf
Jun. 13, 2022
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-264354194-18
TC Document
Solicitud del Cliente_16922.pdf
Jun. 13, 2022
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-264354194-4
TC Abstract
TC Abstract - HO-T1355.pdf
May. 13, 2022
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top