Skip to main content
Renovation of the Francisco Morazán Hydropower Plant to Facilitate the Integration of Renewable Energy
The general objective of the program is to improve and recover the role of the Francisco Morazán hydroelectric power station (CHFM by its acronym in Spanish) as an effective asset to provide flexibility and integration of variable renewable energy (ERV) to the Honduran electricity system. The specific objectives are: (i) to improve the plant's operational reliability and efficiency as an asset to increase ERV's participation in the National Interconnected System (SNI) and its integration to the System Operator (OdS); (ii) have techincal studies to evaluate the increase in its generation capacity; and (iii) strengthen the local capacity and operative units of the plant.

Project Detail

Country

Honduras

Project Number

HO-L1203

Approval Date

October 14, 2020

Project Status

Implementation

Project Type

Loan Operation

Sector

ENERGY

Subsector

ENERGY EFFICIENCY AND RENEWABLE ENERGY IN END USE

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 36,879,828.00

Country Counterpart Financing

USD 18,879,828.00

Original Amount Approved

USD 18,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
5132/BL-HO Sovereign Guaranteed USD - United States Dollar Ordinary Capital Flexible Financing Facility and Concessional Financing
5133/TC-HO Sovereign Guaranteed USD - United States Dollar Clean Technology Fund Public Sector Trust Fund Lending
Operation Number 5132/BL-HO
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Flexible Financing Facility and Concessional Financing
Operation Number 5133/TC-HO
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Clean Technology Fund
  • Financial Instrument: Public Sector Trust Fund Lending

Can’t find a document? Request information

Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-37231
Specific Procurement Notices
HO-L1203_P2096143_1_SP.pdf
Mar. 19, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-37185
Specific Procurement Notices
HO-L1203_P2096143_SP.pdf
Mar. 12, 2024
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-44379
Project Monitoring Report ( Public version)
HO-L1203 First period Jan-Jun 2023 - Public Report.PDF
Jan. 29, 2024
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-36577
Specific Procurement Notices
HO-L1203_P2069590_2_SP.pdf
Dec. 01, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-36452
Specific Procurement Notices
HO-L1203_P2069590_1_SP.pdf
Nov. 10, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-36430
Specific Procurement Notices
HO-L1203_P2069590_SP.pdf
Nov. 08, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-36186
Notice of Contract Award (SG)
HO-L1203_C2060869_AW.pdf
Sep. 28, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000578-522669563-43929
Project Monitoring Report ( Public version)
HO-L1203 Second period Jan-Dec 2022 - Public Report.PDF
Jul. 20, 2023
English
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-35432
General Procurement Notices
HO-L1203_P1196998_GN.pdf
May. 23, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-35271
General Procurement Notices
HO-L1203_P1183906_GN.pdf
May. 12, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000171-1375635338-35254
General Procurement Notices
HO-L1203_P1183891_GN.pdf
May. 03, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000366-2056220512-9214
Loan Contract
Contrato de Préstamo No. 5133-TC-HO - Renovación de la Central Hidroeléctrica Francisco Morazán para Facilitar la Integración de Energías Renovable -
Feb. 22, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZIDB0000366-2056220512-9213
Loan Contract
Contrato de Préstamo No. 5132-BL-HO - Renovación de la Central Hidroeléctrica Francisco Morazán para Facilitar la Integración de Energías Renovable -
Feb. 22, 2023
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-42380
Project Monitoring Report ( Public version)
HO-L1203 First period Jan-Jun 2022 - Public Report.PDF
Feb. 07, 2023
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-41154
Project Monitoring Report ( Public version)
HO-L1203 Second period Jan-Dec 2021 - Public Report.PDF
Aug. 15, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35680
Project Monitoring Report ( Public version)
HO-L1203 First period Jan-Jun 2021 - Public Report.pdf
Feb. 20, 2022
English
https://www.iadb.org/document.cfm?id=EZSHARE-522669563-35124
Project Monitoring Report ( Public version)
HO-L1203 Second period Jan-Dec 2020 - Public Report.pdf
Jul. 20, 2021
English
https://www.iadb.org/document.cfm?id=EZSHARE-965128629-48939
Loan Contract
Renovation of Francisco Morazán Hydroelectric Power Plant to Facilitate the Integration of Renewable Energies - CTF.pdf
Oct. 26, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-965128629-48937
Loan Contract
Renovación de la Central Hidroeléctrica Francisco Morazán para Facilitar la Integración de Energías Renovables.pdf
Oct. 26, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-965128629-48938
Loan Contract
Renovation of Francisco Morazán Hydroelectric Power Plant to Facilitate the Integration of Renewable Energies.pdf
Oct. 26, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1038346716-83
Loan Proposal
Honduras. Loan proposal for the project Renovation of Francisco Morazán Hydroelectric Power Plant to Facilitate the Inte.pdf
Oct. 05, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-1038346716-82
Loan Proposal
Honduras. Propuesta de préstamo para el proyecto Renovación de la Central Hidroeléctrica Francisco Morazán para Facilitar la.pdf
Oct. 05, 2020
Spanish
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-1038346716-70
Electronic Links
Manual Operativo.docx
Oct. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1038346716-62
Electronic Links
HO-L1203_Analisis Tecnico.docx
Oct. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1038346716-52
Electronic Links
IGAS HO-L1203.docx
Oct. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1038346716-47
Electronic Links
POA.pdf
Oct. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1038346716-46
Electronic Links
Plan de Ejecución Plurianual.pdf
Oct. 05, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1038346716-45
Electronic Links
Plan General de Adquisiciones.xlsx
Oct. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1038346716-44
Electronic Links
Evaluación Económica.docx
Oct. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1038346716-39
Electronic Links
Análisis del Cumplimiento con la Politica de Serivicos Publicos Domicilarios_HO-L1203.docx
Oct. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1038346716-38
Electronic Links
Plan de Monitoreo y Evaluación.docx
Oct. 07, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1038346716-33
Electronic Links
HO-L1203_Anexo Personas con Discapacidad.docx
Oct. 07, 2020
Spanish
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-891470668-47
Environmental Impact Assessments
EIA_Anexos_julio 2020.pdf
Jul. 08, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-891470668-46
Environmental Impact Assessments
Informe Consulta_julio 2020.pdf
Jul. 08, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-891470668-41
Environmental Analyses
HO-L1203_SSF_20200516_1923.pdf
Oct. 09, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-891470668-40
Environmental Analyses
HO-L1203_SPF_20200516_1923.pdf
Oct. 09, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-891470668-33
Environmental Impact Assessments
EIAS y Anexos_mayo 2020_final.pdf
May. 15, 2020
Spanish
https://www.iadb.org/document.cfm?id=EZSHARE-1038346716-26
Project Profile
Perfil de Proyecto y Anexos para Publicación.pdf
Nov. 15, 2019
Spanish

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top