Skip to main content
Support for the Design of the Strengthening of Customs Infrastructure Program
The objective of this Technical Cooperation (TC) is to provide technical support and prepare conditions for the start-up of Project GU-L1174, aimed to modernize the customs infrastructure of Pedro Alvarado boarder crossing, by financing pre-investment studies, designs architectural and equipment, and including financial, environmental, social and legal analysis.

Project Detail

Country

Guatemala

Project Number

GU-T1308

Approval Date

September 23, 2020

Project Status

Closed

Project Type

Technical Cooperation

Sector

TRADE

Subsector

TRADE FACILITATION, TRADE LOGISTICS AND CUSTOMS

Lending Instrument

-

Lending Instrument Code

-

Modality

-

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 300,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 300,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
ATN/OC-18227-GU Sovereign Guaranteed USD - United States Dollar Ordinary Capital Nonreimbursable
Operation Number ATN/OC-18227-GU
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Nonreimbursable

Can’t find a document? Request information

Closed Phase
https://www.iadb.org/document.cfm?id=EZIDB0000275-384533542-25
TCM Final Report
GU-T1308 - TCM Final Donor Report.pdf
Feb. 16, 2024
English
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-384533542-18
Electronic Links
Plan de Adquisiciones_97357.pdf
Sep. 29, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-384533542-16
Electronic Links
Matriz de Resultados_90094.pdf
Sep. 29, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-384533542-17
Electronic Links
Términos de Referencia_91982.pdf
Sep. 29, 2020
English
https://www.iadb.org/document.cfm?id=EZSHARE-384533542-15
Electronic Links
Solicitud del Cliente_7262.pdf
Sep. 29, 2020
English
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-384533542-19
TC Document
Documento de CT - Divulgación_63807.pdf
Sep. 29, 2020
English
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-384533542-2
TC Abstract
TC Abstract GU-T1308.pdf
May. 21, 2020
English

Have an Environmental or Social issue related to IDB projects? File a Complaint

Jump back to top