Skip to main content
Comprehensive Citizen Security and Violence Prevention Program for the Inclusion of Vulnerable Migrant Groups
The general development objective of of this operation, as in the associated operation, Citizen Security and Violence Prevention Program (4871/OC-CR), is to contribute to reducing the levels of homicides and assaults in Costa Rica. The specific development objectives of this project is to reduce the vulnerability of the migrant population to violence, marginalization and discrimination

Project Detail

Country

Costa Rica

Project Number

CR-J0002

Approval Date

August 10, 2023

Project Status

Implementation

Project Type

Grant Financing Product

Sector

REFORM / MODERNIZATION OF THE STATE

Subsector

REFORM AND PUBLIC SECTOR SUPPORT

Lending Instrument

Préstamo de Inversión

Lending Instrument Code

INV

Modality

ESP (Specific Investment Operation)

Facility Type

-

Environmental Classification

Likely to cause mostly local and short-term negative environmental and associated social impacts and for which effective mitigation measures are readily available

Total Cost

USD 20,000,000.00

Country Counterpart Financing

USD 0.00

Original Amount Approved

USD 20,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
5777/GR-CR Sovereign Guaranteed USD - United States Dollar IDB Grant Facility Account IDB Grant Facility
Operation Number 5777/GR-CR
  • Lending Type: Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: IDB Grant Facility Account
  • Financial Instrument: IDB Grant Facility

Can’t find a document? Request information

Other Documents
https://www.iadb.org/document.cfm?id=EZIDB0000191-883508192-43
CR-J0002. EEO7. Filtro de Politica de Salvaguardias (SPF) y Formulario de Evaluacion de Salvaguardia (SSF).pdf
Published Jul. 27, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-883508192-23
CR-J0002. EEO5. Manual Operativo del Programa (MOP).docx
Published Jul. 27, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-883508192-29
CR-J0002. EEO6. Gobernanza y Marco Institucional del Sector Migración en Costa Rica.docx
Published Jul. 27, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-883508192-1
CR-J0002. EEO2. Anexo de Migracion.docx
Published Jul. 27, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-890453143-31
CR-J0002. Enlace 4 Presentaciones. Informe de consultas significativas.pdf
Published Sep. 27, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-883508192-12
CR-J0002. EEO1. Analisis Economico del Programa.docx
Published Jul. 27, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-883508192-13
CR-J0002. EEO3. Analisis de Infraestructura y Cambio Climatico.docx
Published Jul. 28, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-883508192-14
CR-J0002. EER1. Plan de Ejecución Plurianual (PEP) Plan Operativo Anual (POA).xlsx
Published Jul. 27, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-890453143-27
CR-J0002. Enlace 1 Plan de Consultas Facilidad. Informe de consultas significativas.pdf
Published Sep. 27, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-883508192-15
CR-J0002. EER2. Plan de Monitoreo y Evaluacion (PME).docx
Published Jul. 27, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-890453143-29
CR-J0002. Enlace 2 Guia de acceso a la Informacion.pdf
Published Sep. 27, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-883508192-16
CR-J0002. EER3. Plan de Adquisiciones (PA).xlsx
Published Jul. 27, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-890453143-30
CR-J0002. Enlace 3 Resumenes AAS y PGAS.pdf
Published Sep. 27, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-883508192-20
CR-J0002. EEO1A Analisis Costo Beneficio. Hoja de Calculo.xlsx
Published Jul. 27, 2023
Download
https://www.iadb.org/document.cfm?id=EZSHARE-883508192-21
CR-J0002. EER4. Informe de Gestion Ambiental y Social (IGAS).docx
Published Jul. 27, 2023
Download
Implementation Phase
https://www.iadb.org/document.cfm?id=EZIDB0000191-883508192-54
Costa Rica. Propuesta. Programa Integral de Seg Ciudadana y Prevencion de la Violencia para la Inclusion de Grupos Migrantes Vulnerables.pdf
Published Jul. 26, 2023
Download
https://www.iadb.org/document.cfm?id=EZIDB0000191-883508192-55
Costa Rica. Proposal. Comprehensive Citizen Security and Violence Prevention Program for the Inclusion of Vulnerable Migrant Groups.pdf
Published Jul. 26, 2023
Download
https://www.iadb.org/document.cfm?id=EZIDB0000366-965128629-49888
Nonreimbursable Investment Financing 5777 GR-CR to the Republic of Costa Rica Comprehensive Citizen Security and Violence Prevention Program for the
Published Aug. 17, 2023
Download
https://www.iadb.org/document.cfm?id=EZIDB0000366-965128629-49889
Financiamiento No Reembolsable para Inversión 5777 GR-CR a la República de Costa Rica Programa Integral de Seguridad Ciudadana y Prevención de la Vio
Published Aug. 17, 2023
Download
Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-883508192-7
COSTA RICA Programa Integral de Seguridad Ciudadana y Prevención de Violencia para la inclusión de grupos migrantes vulnerables (CR-J002).PDF
Published May. 20, 2021
Download
https://www.iadb.org/document.cfm?id=EZSHARE-890453143-37
CR-J0002 Informe Final de Consulta Significativa.pdf
Published Sep. 27, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-890453143-22
CR-J0002 AAS PGAS FFD.docx
Published Apr. 13, 2022
Download
https://www.iadb.org/document.cfm?id=EZSHARE-890453143-38
CR-J0002. Análisis Ambiental y Social (AAS) Y Plan de Gestión Ambiental y Social (PGAS). Final.pdf
Published Sep. 27, 2022
Download
Jump back to top