Alto Maipo Hydroelectric Power Project
The objective of the Project is to provide long term project financing for the design, construction, operation and maintenance of two run-of-the-river hydroelectric plants (in hydraulic series) for a total of 531MW, to be located in the Maipo River Basin (¿MRB¿), 50 km southeast of Santiago

Project Detail

Country

Chile

Project Number

CH-L1067

Approval Date

October 16, 2013

Project Status

Closed

Project Type

Loan Operation

Sector

ENERGY

Subsector

NEW HYDROPOWER PROJECTS

Lending Instrument

BID Invest

Lending Instrument Code

IIC

Modality

PSL (Private Sector Loan)

Facility Type

-

Environmental Classification

-

Total Cost

USD 2,053,300,000.00

Country Counterpart Financing

USD 1,783,300,000.00

Original Amount Approved

USD 200,000,000.00

Financial Information
Operation Number Lending Type Reporting Currency Reporting Date Signed Date Fund Financial Instrument
3008A/OC-CH Non-Sovereign Guaranteed USD - United States Dollar Ordinary Capital Private Sector Financing
3008A/OC-CH-1 Non-Sovereign Guaranteed USD - United States Dollar Ordinary Capital Private Sector Financing
3008B/OC-CH Non-Sovereign Guaranteed USD - United States Dollar Ordinary Capital Participant Financing
Operation Number 3008A/OC-CH
  • Lending Type: Non-Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Private Sector Financing
Operation Number 3008A/OC-CH-1
  • Lending Type: Non-Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Private Sector Financing
Operation Number 3008B/OC-CH
  • Lending Type: Non-Sovereign Guaranteed
  • Reporting Currency: USD - United States Dollar
  • Reporting Date:
  • Signed Date:
  • Fund: Ordinary Capital
  • Financial Instrument: Participant Financing

Can’t find a document? Request information

Preparation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-10897
Proyecto Hidroeléctrica Alto Maipo_ Estimación de emisiones_ [40881512].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29050
PHAN BASE 1 [37958079].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-10904
Proyecto Hidroeléctrica Alto Maipo_ Memoria de Cálculo GEI [40881770].XLSX
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29042
AA Informe CPG2 Sitios protegidos [38151611].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29030
PHAM COMP 10 [37958136].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-10898
Proyecto Hidroeléctrica Alto Maipo_ Estimaciones de gasto sólido [40881516].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29051
PHAM BASE 6 [37958130].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-10905
Proyecto Hidroeléctrica Alto Maipo_Trichomycterus areolatus_V0 [40881772].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29043
Informe CPG1 Usos y Usuarios de Agua [38156586].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29035
PHAM Efectos Acumulativos [37958013].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-10899
Proyecto Hidroeléctrica Alto Maipo_ Gasto Sólido en suspensión [40881517].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-216683772-294
Electronic links to the Environmental Impact Assessment_ Alto Maipo [37058033].PDF
Published Aug. 22, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-10906
Proyecto Hidroeléctrica Alto Maipo_ Spalacopus cyanus [40881773].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29044
Resumen CG7 Alternative Analysis [37957997].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29036
Resumen CG6 Cumulative Impact [37958020].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-10900
Proyecto Hidroeléctrica Alto Maipo_ Programa de Monitoreo de biota acuática [40881518].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-216683772-295
Alto Maipo- Estudio Evaluación Idoneidad para Rafting.pdf
Published Jun. 25, 2020
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-10907
Proyecto Hidroeléctrica Alto Maipo_ Alsodes nodosus [40881775].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29045
Analisis de Alternativas [37957989].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29037
AA Informe CPG5 Sitios protegidos [38162105].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-10901
Proyecto Hidroeléctrico Alto Maipo_ Evaluación de Efectos Acumulativos [40881520].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-10908
Proyecto Hidroeléctrica Alto Maipo_ Memoria de Calculo Emisiones PHAM [40881776].XLSX
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29029
Cambio Climatico y su Impacto en la disponibilidad de Recursos Hidricos [37958008].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29038
PHAM BASE 2 [37958088].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29019
Alto Maipo_ Impactos Acumulativos [37057986].PDF
Published Aug. 22, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-10909
Proyecto Hidroeléctrica Alto Maipo Consolidado_ Trichomycterus areolatus [40881777].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29031
Alto Maipo_Informe Tecnico [38040835].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29039
Informe Tecnico-Anexo B (Alto Maipo) [38041370].pdf
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29020
Alto Maipo_ Analisis de Alternativas [37057991].PDF
Published Aug. 22, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-10910
Proyecto Hidroeléctrica Alto Maipo_ Pristidactylus volcanensis [40881778].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29046
Informe Tecnico Anexo A-Alto Maipo_ pdf [38041313].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29023
Alto Maipo Project Abstract [36773463].PDF
Published Apr. 04, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29032
Alto Maipo Informe CPG4 Servidumbres y Tierras [38156391].PDF
Published Oct. 09, 2013
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29047
Alto Maipo Chile ESS [36773469].PDF
Published Apr. 04, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29024
Alto Maipo ESMR [38143246].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29028
PHAM BASE 4 [37958116].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29033
CPG5 Sitios protegidos-ANEXOS [38162244].RAR
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-10902
Proyecto Hidroeléctrica Alto Maipo_ Inventario de gases Efecto Invernadero [40881768].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29040
PHAM BASE 3 [37958098].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29026
PHAM BASE 5 [37958122].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29034
Alternative, Climate Change Impact and Cumulative Impact Assessment [37958172].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29049
Informe Tecnico Anexo C-Alto Maipo [38041344].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-10903
Proyecto Hidroeléctrica Alto Maipo_ Memoria de Calculo Emisiones PHAM_Final [40881769].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29041
AM Transmission RCA N° 443 [36778062].PDF
Published May. 10, 2012
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29027
Alto Maipo AA Informe CPG2 Sediments [38151167].PDF
Published Dec. 31, 1999
Download
Other Documents
https://www.iadb.org/document.cfm?id=EZSHARE-1800453186-3503
Alto Maipo - Meeting with Coordinadora Ciudadana Ríos del Maipo_ September 2015 [39854096].PPT
Published Dec. 31, 1999
Download
Implementation Phase
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29021
Alto Maipo_ Encuentro con Coordinadora Ciudadana Ríos del Maipo_ Septiembre 2015 [39859613].PDF
Published Dec. 31, 1999
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29025
Chile_ Préstamo 3008A_OC-CH a Alto Maipo SpA [38058620].PDF
Published Jan. 21, 2015
Download
https://www.iadb.org/document.cfm?id=EZSHARE-1936386623-29048
Chile_ Loan 3008A_OC-CH to Alto Maipo SpA [38058602].PDF
Published Jan. 21, 2015
Download
Blogs
Published 2023
El BID coorganiza en Salto Grande el foro internacional “Desafíos y Estrategias para la Renovación de Centrales Hidroeléctricas” junto a la represa de Salto Grande
El próximo 14 y 15 de septiembre, centrales hidroeléctricas de la región, empresas y organismos internacionales participarán de las jornadas del foro internacional “Desafíos y Estrategias para la Renovación de Centrales hidroeléctricas” en las instalaciones del Complejo Hidroeléctrico binacional Salto Grande. El objetivo del evento es itercambiar experiencias sobre los desafíos encontrados por los responsables
Publications
Published 2023
Evaluación corporativa: evaluación de BID Invest
En el marco de la reunión anual de 2015 en Busán, las Asambleas de Gobernadores del Banco Interamericano de Desarrollo (BID) y la Corporación Interamericana de Inversiones (CII) aprobaron la consolidación de las actividades del sector privado del Grupo BID en la CII. La consolidación de actividades en la CII y su capitalización se conoce como la fusión hacia afuera del sector privado, proceso que entró en vigor el 1 de enero de 2016. La Resolución de Busán estableció una “Visión Renovada” para fomentar el desarrollo en la región a través del sector privado. Esta nueva visión constituye el marco de referencia de largo plazo (2016-2025) para BID Invest y se enfoca en los objetivos de: (i) fortalecer la efectividad y adicionalidad; (ii) maximizar las sinergias público-privadas; (iii) usar eficientemente los recursos y asegurar la sostenibilidad financiera de largo plazo. La evaluación busca informar y valorar de manera independiente sobre la efectividad en la implementación, a la fecha, de la Visión Renovada para fomentar el desarrollo en la región a través del sector privado. En particular, la pregunta general que la evaluación busca responder es: ¿en qué medida BID Invest está encaminado hacia el logro de los objetivos finales de la Visión Renovada? Para esto, OVE utilizó una combinación de métodos complementarios, incluyendo la revisión de documentos estratégicos y corporativos, análisis financieros y de cartera, entrevistas y encuestas, y análisis documentales de una muestra de operaciones. La evaluación cubre el periodo 2016-2021, y toma como referencia los hallazgos identificados por OVE en su revisión temprana de la implementación de la fusión hacia afuera de 2017, buscando profundizar el análisis de aspectos que no estaban maduros a esa fecha. La evaluación se guió además por un marco de referencia que vincula los objetivos de la Visión Renovada con las principales actividades e iniciativas emprendidas a la fecha para apoyar el logro de estos objetivos.
Blogs
Published 2022
Día de las Operaciones: lo que aprendimos de Barbados
¿Qué son los Días de las Operaciones del BID? Los Días de las Operaciones son una parte integral de Academia BID, la plataforma de conocimiento y aprendizaje del Grupo BID. El principal objetivo de estas jornadas es crear un espacio de colaboración y diálogo constructivo entre las Unidades Ejecutoras de Proyectos (UEP) dentro de un
Blogs
Published 2023
Ministerios de economía y finanzas frente al cambio climático: 7 avances en la agenda fiscal verde
En este blog resumimos los principales avances sobre la agenda fiscal verde , que está siendo impulsada por la Plataforma Regional de Cambio Climático de los Ministerios de Hacienda, Economía y Finanzas de América Latina, una red de trabajo integrada por los 26 países miembros prestatarios del BID
Blogs
Published 2023
¿Dónde están las oportunidades para que Chile retome la senda de crecimiento?
En las últimas tres décadas, Chile ha sobresalido al llegar al mayor ingreso per cápita en América Latina y el Caribe, además de alcanzar la posición más alta en el Índice de Desarrollo Humano, en sintonía con la media de los países pertenecientes a la OCDE. Asimismo, ha liderado avances en relación con los Objetivos
Blogs
Published 2020
Modernización de hidroeléctricas: ¿una oportunidad en la crisis COVID-19?
En 2019 la capacidad instalada hidroeléctrica alcanzó 1,308 GW a nivel mundial (17% de la capacidad total). Ese año se generaron 4,305 TWh, suficiente energía eléctrica para abastecer la demanda mundial por más de dos meses. Con esta participación, la energía hidráulica continúa siendo la mayor fuente de energía renovable. En nuestra región la hidroelectricidad
Blogs
Published 2022
Give Credit Where It Is Due: Firm Financing in a Post-Pandemic Caribbean
Joint research from the IDB’s Caribbean Department, IDB Invest, and the Complete Caribbean Partnership uses enterprise survey data to highlight that firms from across the Caribbean face challenges when it comes to access to finance, particularly given the depth and development of credit and capital markets. Findings suggest that the most pressing barriers to finance
Blogs
Published 2023
Día de las Operaciones: lo que aprendimos de Brasil
8 minutos de lectura. Como hemos explicado en anteriores experiencias en Barbados y Honduras, el Día de las Operaciones es un taller, presencial y en línea, que reúne a quienes trabajan en la ejecución de proyectos vinculados al Grupo BID, (principalmente a los miembros de las Unidades Ejecutoras y/o contrapartes del Grupo), en donde por
Publications
Published 2020
Modernización de centrales hidroeléctricas en América Latina y el Caribe: Identificación y priorización de necesidades de inversión
La energía hidroeléctrica es la fuente de energía renovable más utilizada en el mundo, y en América Latina y el Caribe (ALC) abastece casi el 50% de la demanda de electricidad. Las proyecciones actuales identifican que la capacidad hidroeléctrica instalada aún seguirá creciendo para atender a la demanda eléctrica futura. Este crecimiento debe considerar la rehabilitación del parque existente, y no solamente el desarrollo de nuevos proyectos. Considerando que una parte importante del parque hidroeléctrico latinoamericano se desarrolló hace más de dos décadas, es de vital importancia identificar las necesidades de modernización de las centrales hidroeléctricas de la región. La mayor ventaja de la rehabilitación es que muchos de los impactos ambientales y sociales ya han sido mitigados, además de ser, en general, inversiones de alta rentabilidad. Este aspecto es de mucha relevancia, debido a la necesidad de respaldo de generación firme en los sistemas existentes y en aquellos que están incorporando energía renovable intermitente, considerando además los desafíos presentes para el desarrollo de nuevas centrales hidroeléctricas, particularmente con grandes embalses. El presente estudio identificó el potencial de modernización en términos de número de plantas y capacidad instalada, por región y país, considerando centrales de más de 10 MW y más de 20 años de antigüedad, y estimó la inversión necesaria. Para los cerca de 113 GW analizados en este estudio, los resultados muestran que se requiere una inversión de aproximadamente USD 32.952 millones en modernización, sólo considerando instalaciones eléctricas y electromecánicas, foco de este trabajo. Es evidente que, para atender una inversión de esta magnitud en la región, es necesaria una acción inmediata y coordinada por todos los actores, tanto públicos como privados, lo que implica un rol activo de los reguladores y entidades de planificación, habida cuenta de las restricciones fiscales que pueden surgir por las políticas desarrolladas para atender las consecuencias del COVID19. Las centrales hidroeléctricas son fundamentales para el desarrollo sostenible de la matriz eléctrica de la región, no solo por el suministro energético renovable que proveen, sino también por la capacidad tecnológica de proporcionar otros servicios auxiliares, como ser flexibilidad y generación en punta, regulación de frecuencia, almacenamiento de energía, entre otros, mismos que actualmente permiten la incorporación masiva de fuentes de generación intermitente (solar y eólica). Por ello, los avances que se puedan lograr en los marcos regulatorios para que reconozcan adecuadamente el valor de todos los servicios que las centrales hidroeléctricas entregan al sistema, más allá de la energía, serán esenciales para incentivar inversiones no solo el desarrollo de nuevos proyectos hidroeléctricos, sino también para acelerar la modernización del parque hidroeléctrico existente, esencial para acompañar la transformación hacia una generación de bajo carbono y su sostenibilidad.
Blogs
Published 2022
The Impact of War on External Financing in Latin America and the Caribbean
Since March of 2022, the war between Russia and Ukraine has significantly impacted the global economy, affecting recovery from the COVID-19 pandemic and reducing or halting growth in most of the world’s regions. By disrupting the supply of agricultural and energy commodities, it has also fuelled inflation, which was already running hot before the war
Powered by FindIT
Jump back to top